Minor Conglomerates No. 1

Past Producer in Keweenaw county in Michigan, United States with commodity Copper
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Mining district
  11. Mineral rights holdings
  12. Land status
  13. Ownership information
  14. Links to other databases
  15. Bibliographic references
  16. General comments
  17. Reporter information

Geologic information

Identification information

Deposit ID 10146214
MAS/MILS ID 0260830002
Record type Site
Current site name Minor Conglomerates No. 1

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: -88.40425, 47.2817 (WGS84)
Elevation 275
Location accuracy 1000(meters)

Site location context

Political divisions (FIPS codes)

Houghton(county)

Michigan(state)

United States(country)

North America(continent)

Land(continent)

USGS map quadrangles

Ahmeek(quadrangle 1:24,000 scale)

Hancock(quadrangle 1:100,000 scale)

Hancock C(quadrangle 1:250,000 scale)

Hydrologic units (watersheds)

Keweenaw Peninsula(hydrologic unit)

Southcentral Lake Superior(hydrologic accounting unit)

Southern Lake Superior(hydrologic subregion)

Great Lakes(hydrologic region)

Geographic areas

Country State County
United States Michigan Keweenaw

Commodities

Commodity Importance
Copper Primary

Materials information

Materials Type of material
Calcite Unknown
Chlorite Unknown
Copper Unknown
Microcline Unknown
Prehnite Unknown
Quartz Unknown

Nearby scientific data

Ore Body (1) -88.40425, 47.2817

Economic information

Ore body information

  • Thickness 6M
    Length 3700M
    Width 7620M
    Depth to top 0M
    Field Value
    Type of Orebody #1 FISSURE VEIN
    Shape of Orebody #1 UNKNOWN
    Type of Orebody #2 REPLACEMENT
    Type of Orebody #3 SHEAR ZONE
    Primary mode of Origin HYDROTHERMAL
    Secondary mode of Origin METAMORPHISM
    Primary Ore Control IGNEOUS
    Secondary Ore Control FAULTING
    Degree of Wallrock Alter. UNKNOWN
    Type of Wallrock Alter. #1 UNKNOWN
    Avg. Thick. Unconsol. Mat. 0
    Date of Last Modification 780719

Economic information about the deposit and operations

Operation type Underground
Development status Past Producer
Commodity type Metallic
Significant No

Mining district

District name Superior

Mineral rights holdings

Type of mineral rights Fee Ownership

Land status

Ownership category Private

Ownership information

  • Type Owner
    Owner Universal Oil Products
    Home office Illinois
    Year 1973

Reference information

Bibliographic references

  • Deposit

    AASE, JAMES H, MICHIGAN NATIVE-COPPER AVAILABILITY STUDY, RE

  • Deposit

    & RESOURCE PORTION OF UNPUBLISHED BUMINES STUDY, 1970,

  • Deposit

    (SOURCE OF RESERVE & RESOURCE DATA, HAS DIAGRAMS OF ORE

  • Deposit

    BECHTEL CORP, PRELIMINARY ENGINEERING & FEASIBILITY STUDY FO

  • Deposit

    HILLS CREEK PROJECT, FOR CALUMET & HECLA, INC., 1966.

  • Deposit

    (CONFIDENTIAL SOURCE OF SOME MILL & MINE COSTING DATA U

  • Deposit

    6000 TPD MILL & MINE MODELS IN BUMINES IC 8598)

  • Deposit

    BENNETT,H J, ET AL, AN ECONOMIC APPRAISAL OF THE SUPPLY OF C

  • Deposit

    FROM PRIMARY DOMESTIC SOURCES, BUMINES IC 8598, PP 15-1

  • Deposit

    96-97. (SOURCE OF MODEL MINE & MILL COSTS & DESIGN, W

  • Deposit

    WERE SCALED UP TO THE SIZE OF THIS PROPERTY)

  • Deposit

    JOHNSON, GUY A, MICHIGAN NATIVE COPPER AVAILABILITY STUDY, C

  • Deposit

    PORTION OF UNPUBLISHED BUMINES STUDY, 1970, 30 P. (SO

  • Deposit

    OF MINE DESIGN & SOME MINE COSTING INFORMATION USED IN

  • Deposit

    IC 8598, HAS MINE DESIGN ILLUSTRATIONS NOT IN IC)

  • Deposit

    WHITE, W S, THE NATIVE COPPER DEPOSITS OF NORTHERN MICHIGAN,

  • Deposit

    DEPOSITS OF THE U.S., 1933-1967, AIME, 1968, PP303-326.

  • Deposit

    (GENERAL DESCRIPTION OF DISTRICT, PLUS DETAILED BIBLIOG

  • Deposit

    MATHEWS, A. A., INC. CAPITAL AND OPERATING COST ESTIMATING S

  • Deposit

    FOR MINING AND BENEFICIATION OF METALLIC AND NONMETALLIC MIN

  • Deposit

    EXCEPT FOSSIL FUELS IN THE UNITED STATES AND CANADA. U.S.B.M

  • Deposit

    CONTRACT NO. JO255026. JULY 1975 299 PP.

  • Deposit

    BAER,R.,ET.AL. MAS SUMMARY FILE REPORTS. BUMINES I.F.O.C.

  • Deposit

    DENVER,CO. 1976.

  • Deposit

    BRODERICK,T.N.,AND C.D. HOHL. THE MICHIGAN COPPER DISTRICT

  • Deposit

    CHAP. IN COPPER RESOURCES OF THE WORLD,INTERNAT.GEOL.

  • Deposit

    CONG., WASHINGTON,D.C.,1935,PP271-284.

  • Deposit

    BROOKS,T.S.,R. PUPELLY, AND C.ROMINGER. UPPER PENINSULA,

  • Deposit

    1869-1873. GEOL SURVEY OF MICHIGAN, V.1, 567PP.

  • Deposit

    BUTLER,B.S.,AND W.S.BURBANK. THE COPPER DEPOSITS OF MICH.

  • Deposit

    USGS PROF. PAPER NO. 144, 1929, 238PP.

  • Deposit

    HUBBARD,H.A. LOWER KEWEENAWAN VOLCANIC ROCKS OF MICHIGAN AND

  • Deposit

    WISCONSIN. USGS J. RES., V.3, NO.5,1975, PP529-541.

  • Deposit

    MATHEWS,A.A.,INC. CAPITAL AND OPERATING COST ESTIMATING

  • Deposit

    SYSTEM HANDBOOK. BUMINES CONTRACT NO.J0255026,FINAL ED.

  • Deposit

    1977, 374PP.

  • Deposit

    WEEGE,R.J.,AND J.P. POLLOCK. EXPLORATION METHODS IN THE

  • Deposit

    COPPER COUNTRY, KEWEENAW PENINSULA, MICH. NEVADA BUREAU

  • Deposit

    OF MINES RPT. 13,PART C,1966,PP.51-61.

  • Deposit

    WEEGE,R.J.,ET AL. THE GEOLOGY OF TWO NEW MINES IN THE NATIVE

  • Deposit

    COPPER DISTRICT OF MICHIGAN. ECON GEOL. V67,1972, PP622-

  • Deposit

    633.

  • Deposit

    WILBAND,J.T. THE COPPER RESOURCES OF NORTHERN MICH. BUMINES

  • Deposit

    CONTRACT NO. J0366067, UNPUB. FINAL RPT.,1978, 66PP.

  • Deposit

    WILBAND,J.T. STUDY TO EVALUATE THE COPPER AND SILVER DEPOSIT

  • Deposit

    IN THE STATE OF MICHIGAN. BUMINES CONTRACT NO. J0366067

  • Deposit

    UNPUB. DEPOSIT FILES,1978;FILES STORED AT E.F.O.C.

General comments

Subject category Comment text
Deposit COPPER TONNAGES & GRADES FROM AASES REPORT, SEE REFERENCES. ALL OTHER % P VALUES GENERATED FROM 50% P TONNAGE (CUMULATIVE OF ALL MEASURED, INDICATED & INFERRED RES DOWN TO THE 7800 FT LEVEL FOR THAT ORE GRADE SHOWN). HARD-COPY BACKUP-FILE FOR DETAILS. MINING METHOD PROPOSED - CUT & FILL WITH 90% RECOVER DESIGN BASICALLY THAT PROPOSED BY JOHNSON, SEE REFER MINE DESIGNED TO EXTRACT DOWN TO THE 7800 FT LEVEL ( THE 110 DEGREE F. LIMIT. MINE LIFE 15 YEARS FOR 4 PRODUCTION AND CAPITAL COSTS COMPUTED BY SCALING UP TPD MINING OPERATION DESCRIBED IN BUMINES I.C. 8598, 83. SEE HARD-COPY BACKUP FILE FOR SPECIFIC CALCULAT MICHIGAN NATIVE-COPPER COSTING-BACKUP FILE FOR MORE SIVE DESCRIPTION OF COSTING METHODOLOGY THAN IS IN I REC-151 MILLING CONSISTS OF A FLOTATION SYSTEM WITH AN ADDED GING SECTION AS DESCRIBED IN IC 8598, P. 96-97. CONC CONTAINS 52% CU. PRODUCTION & CAPITAL COST SCALED U 6000 TPD MILLING OPERATION DESCRIBED IN IC. FOR DET SEE HARD-COPY BACKUP FILES CITED ABOVE. ESTIMATED CAPITAL COSTS - AS OF 1970 - FOR EACH OF 4 MINES MINE - ACQUSITION $ 350 - EXPLORATION 1,416 - DEVELOPMENT 20,113 - EQUIPMENT $ 8,140,099 & PLANT 8,043 - WORKING CAPITAL 6,157 MILL - PLANT & EQUIPMENT 21,682 - WORKING CAPITAL 1,275 PREPRODUCTION PERIOD IS 7 YEARS, CALCULATED BY L MOORE, SEE NATIVE-COPPER COSTING BACKUP FILE FOR DETAILED BREAKDOWN RECORDS 010, 101-115,120,151 REVIEWED &/OR COMPLETED, COMMEN REFERECES ADDED BY R BAER 1/76, EXCEPT COSTING REVISED B J LEMONS & R STECKLEY 1/76. MAY 1977 / MODIFICATIONS MADE TO SYSTEM & DETAILED BELOW NUL MMENT RECORDS 805 - 828 ABOVE. (E.F.O.C., 7500 MT/DAY MINE IS COSTED USING 1975 MATHEWS CON CAPITAL COST ASSUMES 3 SHIFTS, 90 DAYS WORKING CAPITAL M-M3/DAY X 1000 WATER PUMPED, HEAVY CLEARING OF 3 LEVE RES, 10 M2 X 200 M STOPES, 4 COMPARTMENT SHAFT 30 M2 X , EXPLORATION DRILLING $80/M, & 5 KM ACCESS ROAD. CAPITAL COSTS ARE --- (JULY 1975 DOLLARS) --- - EXPLORATION $ 2,647,600 - DEVELOPMENT $ 6,016,400 - EQUIPMENT $ 2,821,000 - PLANT $20,604,600 - WORK. CAP. $ 9,720,500 OPERATING COST ASSUMES 10 M2 DRIFTS FOR RAIL HAULAGE, LOCOMOTIVES, 7.5 M2 RAISES, INCREASE SHAFT DEPTH AS MI OGRESSES, BOTH SIDES RAISE MINED, 5 M3 AIR/TON ORE VEN N, & 0.135 M3 WATER SUPPLY/MT PRODUCTION. COLUMNS 64 - 74, TOTAL COSTS HAVE BEEN UPDATED BY BLS O DECEMBER 1976 COSTS. REC 151 / CAPITAL COST ASSUMES CRUSHING TO 3/8 INCH, GRIND T ESH, WATER USED IS 75 % RECLAIMED (3.5 MT/MT ORE), 1 K TO TAILINGS POND, HEAVY CLEARING OF 3 LEVEL HECTARES, ED FINE ORE BINS, & 90 DAYS WORKING CAPITAL. CAPITAL COSTS ARE (JULY 1975 DOLLARS) --- - PLANT & EQ. $ 14,276,600 - WORK. CAP. $ 1,598,500 OPERATING COST ASSUMES 60 % CU IN CONCENTRATE, 50% WAT R THICKENING & 7 % AFTER FILTRATION. COLUMNS 70 - 80, TOTAL COSTS ARE UPDATED BY BLS INDICE CEMBER, 1976 COSTS. REC 160 / TRANSPORTATION COST IS $ 0.94/MT. FOR 23 KM TRIP T ER. COMMENTS ADDED ON 6/27/ 78, E.F.O.C., DURING THE MAS STUDY TO RE-EVALUATE THE NATIVE COPPER DEPOSITS OF MICHIGAN: THE DEPOSIT WAS DOWN-GRADED FROM A C- TO AN R-TYPE DEPOSIT BECAUSE OF THE LACK OF SPECIFIC INFORMATION ON LOCATION, DEPOSIT DIMENSIONS, AND GEOLOGY.

Reporter information

Type Date Name Affiliation Comment
Reporter 27-FEB-1984 Drescher, Theodore A. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.