| Deposit ID | 10157954 |
|---|---|
| MAS/MILS ID | 4810510002 |
| Record type | Site |
| Current site name | Kam |
| Alternate or previous names | Lejthize, Kepenek, Zogaj, Rragasm, Kamit, Lajtheza |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 20.23515, 42.24875 (WGS84) |
| Elevation | 800 |
Political divisions (FIPS codes)
Tropoje(province)
Albania(country)
Federal lands
Federal(land status)
| Country | State |
|---|---|
| Albania | Tropoje |
| Commodity | Importance |
|---|---|
| Chromium Critical | Primary |
| Materials | Type of material |
|---|---|
| Olivine | Unknown |
| Ore Body (1) | 20.23515, 42.24875 |
|---|
| |||||||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Mining method | Open Stope - Sublevel |
| Milling method | Handsort |
| District name | Letaj |
|---|
| Type of mineral rights | Unknown |
|---|---|
| Type of mineral rights | Unknown |
| Type of mineral rights | Unknown |
| Ownership category | Federal |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | Minera Veriore Kromit - Kam Combine |
| Interest | 100 |
| Home office | Albania |
| Year | 1991 |
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 45000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 45000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 46000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1987 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 67600 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1988 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 77000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1989 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 77000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | Ore Throughput (Estimated) 80000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 4810510002 |
COMMODITIES RESEARCH UNIT, LTD., THE BASE METAL
INDUSTRY OF ALBANIA, LONDON, PP. A9-A10 (1991).
C. KIPPENBERGER, REPORT OF AN OFFICIAL VISIT TO ALBANIA
TO GATHER INFORMATION ON THE SITUATION IN THE MINERAL
RESOURCES SECTOR, JULY 28, 1988 TO AUGUST 11, 1988,
FEDERAL INSTITUTE FOR GEOSCIENCES (BGR) HANNOVER (1988).
MINING JOURNAL RESEARCH SERVICES, MINING IN ALBANIA: AN
EMERGING OPPORTUNITY, PP. 59-60 (MAY 1992).
| Subject category | Comment text |
|---|---|
| Deposit | TOTAL OPERATING DAYS PER YEAR WERE ASSUMED TO BE 250. KAM IS A STATE-RUN ENTERPRIZE, LOCATED IN THE TROPOJE DISTRICT, MINES THE CHROMITE OCCURRENCES OF THE TROPOJE ULTRABASIC MASSIF. THERE ARE FIVE MAIN DEPOSITS MINED IN THE TROPOJE MASSIF, EACH CONSIST OF TWO MAIN ORE-TYPES, OLIVINITES AND SERPENTINITES. THESE ORE TYPES ARE OUTLINED IN TABLE 6.3 IN THE MINING JOURNAL RESEARCH SERVICES REPORT ON MINING IN ALBANIA: AN EMERGING OPPORTUNITY, AND NOT IN TABLE 6.1 AS IS STIPULATED ON PAGE 59 OF THE REPORT. THE OLIVINITE ORES CONTAIN UNACCEPTABLY HIGH LEVELS OF SILICA. AT THESE LEVELS, 24%, THE SILICA GANGUE WOULD RESULT IN HIGH-VISCOSITY MELTS DURING FERROCHROME PRODUCTION. THIS PRODUCES VERY SLOW REACTION TIMES, WITH HIGH ENERGY CONSUMPTION, MAKING THE PROCESS UNECONOMIC. THE GREATEST POTENTIAL LIES IN IN THE SERPENTINITIC-ORES, WHICH CONTAIN MINIMAL SILICA, WITH HIGHER GRADES OF CHROMITE. RESERVES IN THIS DISTRICT ARE CONSERVATIVELY ESTIMATED AT 2 MILLION TONS. ANNUAL PRODUCTION FROM THE KAMIT MINE AVERAGES 65,000 TONS PER YEAR. THERE ARE SEVERAL OPTIONS OPEN TO INCREASE PRODUCTION TO 100,000 TONS PER YEAR. AT PRESENT, THE ORE FROM KAMIT IS SORTED, WITH MOST IMPURITIES REMOVED, BEFORE A PROPORTION IS EXPORTED TO YUGOSLAVIA. A PROCESSING FACILITY WITH A CAPACITY TO TREAT UP TO 100,000 TONS PER YEAR IS PLANNED TO BE CONSTRUCTED IN THE TROPOJE DISTRICT. THE TROPOJE MASSIF IS ONE OF THE BIGGEST CHROME-BEARING MASSIFS IN ALBANIA AND ITS POTENTIAL TO HOST ADDITIONAL DEPOSITS OF CHROMITE IS EXCELLENT. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 21-SEP-1992 | Boyle, Ed | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.