Stallingborough Plant Ti

Plant in United Kingdom with commodity Titanium, Pigment
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Economic information about the deposit and operations
  8. Ownership information
  9. Production statistics
  10. Links to other databases
  11. Bibliographic references
  12. General comments
  13. Reporter information

Geologic information

Identification information

Deposit ID 10182318
MAS/MILS ID 4120108003
Record type Site
Current site name Stallingborough Plant Ti

Geographic coordinates

Point of reference Plant
Geographic coordinates: 0.10242, 53.59065 (WGS84)
Location accuracy 1000(meters)

Site location context

Political divisions (FIPS codes)

United Kingdom(country)

Europe(continent)

Land(continent)

Geographic areas

Country
United Kingdom

Commodities

Commodity Importance
Titanium, Pigment Critical Primary

Nearby scientific data

Plant (1) 0.10242, 53.59065

Economic information

Economic information about the deposit and operations

Operation type Processing Plant
Development status Plant
Commodity type Metallic
Significant Yes
Discovery year 1984
Year of first production 1984
Plant type Pigment Plant
Plant subcategory Tio2 Pigment-Chloride

Ownership information

  • Type Owner
    Owner Hanson Plc.
    Interest 100
    Home office United Kingdom
    Year 1991
  • Type Operator
    Owner Scm Chemicals
    Home office United Kingdom
    Year 1991

Production statistics

  • Year 1949
    Description Sulfate Capacity 9000
  • Year 1980
    Description Sulfate Capacity 56000
  • Year 1984
    Description Sulfate Capacity 25000
  • Year 1984
    Description Chloride Capacity 45000
  • Year 1986
    Description S 25000
  • Year 1986
    Description C 75000
  • Year 1987
    Description S 30000
  • Year 1987
    Description C 80000
  • Year 1988
    Description S 35000
  • Year 1988
    Description C 85000
  • Year 1989
    Description S 35000
  • Year 1989
    Description C 80000
  • Year 1990
    Description S 26000
  • Year 1990
    Description C 80000
  • Year 1991
    Description Sulfate Pigment 10000
  • Year 1991
    Description Chloride Pigment 75000 Mtpy Pigment
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Chloride Pigment Titanium, Pigment Mineral Pigments 75000mt
  • Year 1991
    Description Chloride Capacity 80000
  • Year 1991
    Description Sulfate Capacity 10000

Comments on the production information

  • RUTILE TYPE PIGMENTS ARE OUTPUT FROM THE CHLORIDE PLANT; ANATASE TYPE PIGMENTS ARE FROM THE SULFATE PLANT. *CHLORIDE PLANT MAKES PIGMENT FOR PAINT AND PLASTICS MARKETS, GRADE IS ASSUMED TO BE 93%. SULFATE PLANT MAKES PIGMENT FOR CERAMICS AND ESALTOMERS MARKETS, GRADE IS ASSUMED TO BE 95%.
  • RECOVERY FOR CHLORIDE PROCESS RANGES FROM 95% FOR NATURAL ORES TO 90% FOR SLAG. RECOVERY RATE USING THE CURRENT MIX OF ORES IS ESTIMATED TO BE 92.3%. EXPECTED RECOVERY FROM SULFATE ORES IS 85%.

Comments on the reserve resource information

  • FEED GRADE FOR CHLORIDE PLANT IS 94.13%, FOR SULFATE PLANT IS 44.5%.
  • CHLORIDE AND SULFATE PLANT. ALL COSTS IN 1991 DOLLARS. EXCHANGE RATE IS 0.5652 L = $1. FEEDSTOCK IS NATURAL RUTILE FROM SIERRA LEONE, SYNTHETIC RUTILE FROM AUSTRALIA, AND SLAG FROM S. AFRICA FOR THE CHLORIDE PLANT; ILMENITE FROM NORWAY FOR THE SULFATE PLANT.

Comments on the workings information

  • WASTE CHLORIDE INCINERATION PROCESS: WASTE CHLORIDES-BURNER- METAL OXIDE CINDER-LANDFILL. *WASTE ACID CONCENTRATION PROCESS: WASTE ACID STORAGE-1ST STAGE EVAPORATION-VACUUM CRYSTALLIZER-3RD STAGE VACUUM EVAPORATION-PRECIPITATE AGEING TANKS-ACID FOR RECYCLE. *CHLORIDE PLANT POLLUTION CONTROL COSTS: LABOR COSTS- 149,625 L/YR, 1.87 L/MT TIO2. *C. MAINTENANCE MATERIALS- 2% REPLACE. COST, 280,000 L/YR, 3.5 L/MT TIO2, ADDED COST=3.5 L/MT TIO2. *C. FUEL- 3 MM BTU/MT SOLIDS, 1.4 L/MM BTU, 33,600 L/YR, 0.42 L/MT TIO2, ADDED COST=0.42 L/MT TIO2. *C. ELECTRICITY- 100 KWH/MT SOLIDS, 0.03 L/KWH, 25,600 L/YR, 0.32 L/MT TIO2, ADDED COST=0.32 L/MT TIO2. *C. PROCESS WATER- SMALL. *C. COOLING WATER- SMALL. *C. SOLID WASTE DISPOSAL- 8,000 MT/YR, 12 L/MT, 96,000 L/YR, 1.20 L/MT TIO2, ADDED COST=1.20 L/MT TIO2. *C. DIRECT OPERATING COST- 584,825 L/YR ($1,040,614/YR), 7.31 L/MT TIO2 ($13.01/MT TIO2), ADDED COST=5.44 L/MT TIO2 ($9.68/MT TIO2). *C. TAXES & INSURANCE- 2% REPLACE. COST, 280,000 L/YR, 3.50 L/MT TIO2, ADDED COST=3.50 L/MT TIO2. *C. DEPRECIATION- 8% REPLACE. COST, 1,120,000 L/YR, 14 L/MT TIO2, ADDED COST=14 L/MT TIO2. *C. TOTAL OP. COST- 1,984,825 L/YR ($3,531,717/YR), 24.81 L/MT TIO2 ($44.15/MT TIO2), ADDED COST=22.94 L/MT TIO2 ($40.82/MT TIO2). *SULFATE PLANTE WATER POLUTION CONTROL COSTS: LABOR- 183,540 L/YR, 18.35 L/MT TIO2. *S. CHALK- 1000MTPY, 8 L/MT, 8,000 L/YR, 0.8 L/MT TIO2, ADDED COST=0.80 L/MT TIO2. *S. MAINTENANCE MATERIALS- 2% REPLACE. COST, 280,000 L/YR, 28 L/MT TIO2, ADDED COSTS=28 L/MT TIO2. *S. STEAM- 2.1 MT/MT H2SO4, 4.58 L/MT, 134,652 L/YR, 13.47 L/MT TIO2, ADDED COST=13.47 L/MT TIO2. *S. ELECTRICITY- 160 KWH/MT H2SO4, 0.03 L/KWH, 71,680 L/YR, 7.17 L/MT TIO2, ADDED COST=7.17 L/MT TIO2. *S. COOLING WATER- 130 MGAL/MT H2SO4, 0.07 L/MGAL, 127,400 L/YR, 12.74 L/MT TIO2, ADDED COST=12.74 L/MT TIO2. *S. DIRECT OP. COST- 805,272 L/YR ($3,923,972/MT YR), 220.53 L/MT TIO2 ($392.40/MT TIO2), ADDED COST=201.37 L/MT TIO2 ($358.32/MT TIO2).

Comments on other economic factors

  • PIGMENT IS SHIPPED TO OVER 80 COUNTRIES. AROUND 60% IS EXPORTED.
  • RECORD 1 ON FEED PAGE IS FEED FOR CHLORIDE PLANT. RECORD 1 LINE 1 IS WEIGHTED AVERAGE, LINES 2-4 ARE INDIVIDUAL GRADES. RECORD 2 IS FOR SULFATE PLANT. *ESTIMATE OF FEED CONSUMPTION: CHLORIDE PLANT 1991- NATURAL RUTILE=60,150 MT, SYNTHETIC RUTILE=10,028 MT, SLAG=10,028 MT; 1990- N.R.=64,160 S.R.=10,696 S.=10,696; 1989- N.R.=64,160 S.R.=10,696 S.=10,696; 1988- N.R.=68,170 S.R.=11,365 S.=11,365; 1987- N.R.=64,160 S.R.=10,696 S.=10,696; 1986- N.R.=60,150 S.R.=10,028 S.=10,028. SULFATE PLANT 1991- 26,428 MT; 1990- 68,739; 1989- 92,533; 1988- 92,533; 1987- 79,314; 1986- 66,095. *C. FEED 1991: NAT. RUTILE- 75% OF FEED, 0.8020 MT/MT TIO2, FROM SIERRA LEONE, 96% TIO2 GRADE, 312.9 L/MT DEL., 297 L/MT FOB + 15.9 L/MT FRT., 250.94 L/MT TIO2. SYNTHETIC RUTILE- 12.5% OF FEED, 0.1337 MT/MT TIO2, FROM BRISBANE OR GERALDTON AUSTRALIA, 92% TIO2 GRADE, 218.9 L/MT DEL., 2202 L/MT FOB + 16.9 L/MT FRT., 29.26 L/MT TIO2. SLAG- 12.5% OF FEED, 0.1337 MT/MT TIO2, FROM RICHARDS BAY SO. AFRICA, 85% FEED GRADE, 179.9 L/MT DEL., 164 L/MT FOB + 15.9 L/MT FRT., 24.05 L/MT TIO2. *C. TOTAL FEEDSTOCK COST- 304.24 L/MT TIO2 ($538.30/MT TIO2). *S. FEED 1991: ILMENITE- 100% OF FEED, 2.6438 MT/MT TIO2, FROM TELLNES NORWAY, 44.5% TIO2 GRADE, 52.70 L/MT DEL, 44.8 L/MT FOB + 7.9 L/MT FRT., 139.33 L/MT TIO2. *S. TOTAL FEEDSTOCK COST- 139.33 L/MT TIO2 ($246.51/MT TIO2).
  • RECORDS 001 & 002 ON INVESTMENT PAGE REFER TO CHLORIDE PLANT; RECORDS 003 & 004 REFER TO SULFATE PLANT. *C. PLANT OVERHEAD- 24.49 L/MT TIO2, 80% OPERATING LABOR. *C. TAXES & INSURANCE- 32.49 L/MT TIO2, 2%/YR REPLACE. COST. *C. G&A, SALES, RESEARCH- 43.13 L/MT TIO2, 5% PROD. COST. *C. DEPRECIATION- 129.97 L/MT TIO2, 8% REPLACE. COST. *S. PLANT OVERHEAD- 63.25 L/MT TIO2, 80% OP. LABOR. *S. TAXES & INSURANCE- 45.20 L/MT TIO2, 2% REPLACE. COST. *S. G&A, SALES, RESEARCH- 55.54 L/MT TIO2, 5% PROD. COST. *S. DEPRECIATION-180.80 L/MT TIO2, 8% REPLACE. COST. *TARIFFS ON TIO2 PIGMENT IS 6-7% OF IMPORT VALUE.

Reference information

Bibliographic references

  • Deposit

    NOTES FROM NEWSPAPER COVERAGE OF PLANT ACTIVITIES.

  • Deposit

    NOTES FROM A VISIT, APRIL 18, 1991, TO MEET WITH PLANT

  • Deposit

    PERSONNEL.

  • Deposit

    DATA RECORDED FROM PUBLICATIONS BY HMSO.

  • Deposit

    MINERAL AND TRADE DATA COLLECTED AND PUBLISHED BR EUROSTAT.

General comments

Subject category Comment text
Deposit PLANT COVERS ABOUT 50 ACRES. *CHLORIDE PLANT FLOW CHART: FEED-CHLORINATORS-CYCLONE SPEARATORS-PURIFIERS-OXIDIZERS-GAS SEPARATORS-FINISHING TANKS- DRYER-PRODUCT. *SULFATE PLANT FLOW CHART: FEED-ORE DIGESTOR-CLARIFIER- HYDROLIZER-MOORE FILTERS-CALCINERS-GRINDING-FINISHING TANKS- DRYERS. *A SULFURIC ACID PLANT EXISTS ON THE PROPERTY BUT IS NOT OPERATED DUE TO THE LOW SULFATE PROCESS PRODUCTION. PLANT DOES NOT OWN OR OPERATE DOCKS ONT HE HUMBER. *PLANT IS SERVED BY A SPUR OF THE BRITISHED RR. *NO ACCOMMODATION ARE AVAILABLE AT THE PLANT. *CHLORIDE PLANT: EXPANSION CONSTRUCTION COST 1985= 25,000,000 L *C. REPLACEMENT COST- 130,000,000 L, 1,696 L/MT OF ANNUAL CAP. *C. CHLORINE- 112.16 L/MT, 19.07 L/MT TIO2, 0.17 MT CL/MT TIO2. *C. COKE- 122.68 L/MT, 39.26 L/MT TIO2, 0.32 MT COKE/MT TIO2. *C. ALUMINUM- 745.10 L/MT, 4.17 L/MT TIO2, 0.0056 MT AL/MT TIO2. *C. SCRUB SOLIDS- 10 L/MT, 0.18 L/MT TIO2, 0.018 MT/MT TIO2. *C. SEPARATED AIR- LOCAL: O2- 0.78 L/MSCF, 10.97 L/MT TIO2, 0.018 MT/MT TIO2; N2- 0.43 L/MSCF, 12.01 L/MT TIO2, 28 MSCF/MT TIO2. *C. FINISHING CHEMICALS- 28.01 L/MT TIO2. *C. MAINTENANCE MATERIALS- 43.67 L/MT TIO2, 2.5% REPLACE. COST. *C. STEAM- ONSITE BOILERS, 4.58 L/MT, 17.03 L/MT TIO2, 3.72 MT/MT TIO2. *C. ELECTRICITY- LOCAL AUTHORITIES, 0.03 L/KWH, 18.65 L/MT TIO2, 565 KWH/MT TIO2. *C. TOLUENE- 0.54 L/GAL., 1.99 L/MT TIO2, 3.7 GAL.MT TIO2. *C. PROCESS WATER- WELLS?, RIVER?, 0.3 L/MGAL, 2.73 L/MT TIO2, 9.1 GAL/MT TIO2. *C. COOLING WATER- WELLS?, RIVER?, 0.07 L/MGAL, 1.61 L/MT TIO2, 23 GAL/MT TIO2. *C. POLLUTION CONTROL- 8.94 L/MT TIO2. *C. OPERATING COST- 638.44 L/MT TIO2 ($1130/MT TIO2). *C. BYPRODUCT CREDITS: HYDROCHLORIC ACID- 5.92 L/MT TIO2, 0.13 MT/MT TIO2 AT 45.5 L/MT. *C. NET OPERATING COST- 632.53 L/MT TIO2. *C. PRODUCTION COST- 862.62 L/MT TIO2 ($1526/MT TIO2). *SULFATE PLANT: REPLACEMENT COST- 22,600,000 L, 2,260 L/MT ANNUAL CAPACITY. *S. LABOR COST- 289.81 L/MT TIO2 ($512.75/MT TIO2). *S. SULFURIC ACID- LOWEST COST LOCAL SOURCE, 24.54 L/MT AT 35 ECU/MT, 93.24 L/MT TIO2, 3.8 MT OF 92% ACID/MT TIO2. *S. IRON- 40 L/MT, 8 L/MT TIO2, 0.2 MT FE/MT TIO2. *S. TITANIUM TETRACHLORIDE- 363.25 L/MT, 3.63 L/MT TIO2, 0.01 MT/MT TIO2. *S. CHALK- LOCAL PITS, 8.4 L/MT, 1.68 L/MT TIO2, 0.2 MT/MT TIO2. *S. STEAM- ONSITE GENERATION, 4.58 L/MT, 63.66 L/MT TIO2, 13.9 MT/MT TIO2. *S ELECTRICITY- LOCAL AUTHORITIES, 0.03 L/KWH, 19.01 L/MT TIO2, 576 HWK/MT TIO2. *S. FUEL OIL- 1.08 L/MM BTU, 12.96 L/MT TIO2, 12 MM BTU/ MT TIO2. *S. PROCESS WATER- WELL?, RIVER?, 0.30 L/MGAL., 8.7 L/MT TIO2, 29 MGAL./MT TIO2. *S.COOLING WATER- WELL?, RIVER?, 0.07 L/MGAL., 6.72 L/MT TIO2, 96 MGAL./MT TIO2. *S. POLLUTION CONTROL- 159.03 L/MT TIO2. *S. MAINTENANCE MATERIALS- 67.80 L/MT TIO2, 3% REPLACE. COST. *S. OPERATION COST- 873.56 L/MT TIO2 ($1545.58/MT TIO2). *S. BYPRODUCT CREDITS: COPPERAS- 80.36 L/MT TIO2, 4.1 MT/MT TIO2 AT 19.6 L/MT; WASTE SULFURIC ACID- 27.24 L/MT TIO2 1.11 MT/MT TIO2 AT 24.54 L/MT. *S. PRODUCTION COST- 1,110.75 L/MT TIO2 ($1,965.24/MT TIO2).

Reporter information

Type Date Name Affiliation Comment
Reporter 14-OCT-93 Kraemer, Sandra R. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.