Killinghall Malaysia Bhd

Producer in Selangor, Malaysia with commodity Tin
Warning: This record lacks important information: bibliographic references, which we consider necessary for a comprehensive report.
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Economic information about the deposit and operations
  8. Ownership information
  9. Workings at the site
  10. Links to other databases
  11. General comments
  12. Reporter information

Geologic information

Identification information

Deposit ID 10183266
MAS/MILS ID 5570140004
Record type Site
Current site name Killinghall Malaysia Bhd
Alternate or previous names Killinghall Tin M Bhd

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: 103.23304, 3.0013 (WGS84)

Site location context

Political divisions (FIPS codes)

Selangor(province)

Malaysia(country)

Asia(continent)

Land(continent)

Geographic areas

Country State
Malaysia Selangor

Commodities

Commodity Importance
Tin Critical Primary

Nearby scientific data

Ore Body (1) 103.23304, 3.0013

Economic information

Economic information about the deposit and operations

Operation type Surface
Development status Producer
Commodity type Metallic
Significant Yes
Mining method Hydraulicking
Milling method Gravity

Ownership information

  • Type Owner
    Owner Ramuda Sdn Bhd And Straits Co.
    Year 1984

Comments on the production information

  • A $148.72 SMELTING COST AND A $0.10 MILLING COST PER TONNE ARE INCURRED IN THE PRODUCTION OF THE TIN CONCENTRATE.

Workings at the site

  • Type of workings Surface
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ESTIMATE
    Mining Method HYDRAULICKING
    Capacity Units MT ORE/DAY
    Unit Production Cost .74
    Units of Production $/MT ORE
    Year of Information 1984

Reference information

General comments

Subject category Comment text
Deposit FOR THE YEARS 1983-1988 THE ESTIMATED UNITS TREATED PER YEAR IS 3,660,000 MT.

Reporter information

Type Date Name Affiliation Comment
Reporter 22-SEP-1992 Sabin, A. E. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.