| Deposit ID | 10183343 |
|---|---|
| MAS/MILS ID | 6020250028 |
| Record type | Site |
| Current site name | Mt. Todd |
| Alternate or previous names | Batman, Tollis/Golf West, Zapopan |
| Point of reference | Claim |
|---|---|
| Geographic coordinates: | 132.01576, -14.09717 (WGS84) |
| Location accuracy | 5000(meters) |
Political divisions (FIPS codes)
Northern Territory*(province)
Australia(country)
Australia(continent)
Land(continent)
| Country | State |
|---|---|
| Australia | Northern Territory* |
| Commodity | Importance |
|---|---|
| Gold | Primary |
| Claim (1) | 132.01576, -14.09717 |
|---|
| Operation type | Surface |
|---|---|
| Development status | Prospect |
| Commodity type | Metallic |
| Significant | Yes |
| Milling method | Hydrometallurgy Unspecified |
| Type of mineral rights | Private Lease |
|---|
| Type | Operator |
|---|---|
| Owner | Zapopan Nl |
| Interest | 100 |
| Home office | Australia |
| Year | 1995 |
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1992 | ||||||||||||||
| Measured | 36800000mt ore | ||||||||||||||
| Demonstrated | 36800000mt ore | ||||||||||||||
| Total resources | 36800000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1995 | ||||||||||||||
| Indicated | 105000000mt ore | ||||||||||||||
| Demonstrated | 105000000mt ore | ||||||||||||||
| Total resources | 105000000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1995 | ||||||||||||||
| Indicated | 8000000mt ore | ||||||||||||||
| Demonstrated | 8000000mt ore | ||||||||||||||
| Inferred | 89000000mt ore | ||||||||||||||
| Total resources | 97000000mt ore | ||||||||||||||
| |||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 6020250028 |
NORTHERN MINER, APR 10, 1995, P 20.
MINING ENGINEERING, MAY 95, P 408.
REGISTER OF AUSTRALIAN MINING, 1992/93, P. 121.
THE MINING RECORD, "PEGASUS, MT. TODD CONSTRUCTION APROVED;
ZORTMAN ACTIVIATIES ARE PROGRESSING". VOL., 106, #35, P1,
AUGUST, 1995.
THE MINING RECORD, VOL., 107, #34, AUGUST, 21, 1996, P19.
| Subject category | Comment text |
|---|---|
| Deposit | PHASE I COMPLETED BY 1QT 96, PHASE II STARTING NOW, TO BEGIN PRODUCTION UP TO 260,000 OZ AU FROM 80,000 OZ BY 1997. PHASE I DESIGNED TO HANDLE 6.6M MT ORE ANNULAY. PHASE II WILL ADD 2.2 M MT ORE ANNUALY, FOR TOTAL OF 8.8 M MT/YR. TOTAL COST PHII OF $149MIL. CONSIST OF MILLING CIRCUIT: (FLOTATION, REGRINDING, LEACH), AND PARALLEL CRUSHING TO TO HANDLE THE 2.2 M MT ADDITION. TOTAL AU RECOVERY EST AT 84% |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 31-MAR-97 | Buckingham, David A. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.