Bakony Bauxite Mines

Producer in Veszprem, Hungary with commodity Aluminum
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Mining district
  11. Ownership information
  12. Production statistics
  13. Workings at the site
  14. Links to other databases
  15. Bibliographic references
  16. Reporter information

Geologic information

Identification information

Deposit ID 10206798
MAS/MILS ID 4370900021
Record type Site
Current site name Bakony Bauxite Mines
Alternate or previous names Bakonyszentlaszlo, Bakinyoszlop, Nyirad, Halimba Iii, Iharkut, Bito Ii, Fenyofo

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: 17.53534, 47.06538 (WGS84)
Location accuracy 5000(meters)

Site location context

Political divisions (FIPS codes)

Veszprem(province)

Hungary(country)

Geographic areas

Country State
Hungary Veszprem

Commodities

Commodity Importance
Aluminum Critical Primary

Materials information

Materials Type of material
Boehmite Unknown

Nearby scientific data

Ore Body (1) 17.53534, 47.06538

Economic information

Ore body information

  • Strike N00E
    Dip 10N
    Thickness 10M
    Length 400M
    Field Value
    MAS Matrix # 1
    MAS Column # 4
    Type of Orebody #1 SEDIMENTARY
    Shape of Orebody #1 LENTICULAR
    Primary mode of Origin UNKNOWN
    Primary Ore Control BEDDING
    Secondary Ore Control FAULTING
    Strike And Dip N00E:10N
    Date of Last Modification 920601

Economic information about the deposit and operations

Operation type Surface-Underground
Development status Producer
Commodity type Metallic
Significant Yes
Mining method Open Stope - Room and Pillar
Year of first production 1925
Milling method Washing

Mining district

District name Bakony Mountains

Ownership information

  • Type Owner-Operator
    Owner Bauxit
    Interest 100
    Home office Hungary
    Year 1994
    First year 1990

Production statistics

  • Year 1984
    Accuracy Estimate
    Description 50.06% Al2o3 Ore Throughput (Estimated) 2994000 Metric Tons Of Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2994000mt 50wt-pct
  • Year 1985
    Accuracy Estimate
    Description 50.53% Al2o3 Ore Throughput (Estimated) 2691000 Metric Tons Of Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2691000mt 51wt-pct
  • Year 1986
    Accuracy Estimate
    Description 50.55% Al2o3 Ore Throughput (Estimated) 2934000 Metric Tons Of Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2934000mt 51wt-pct
  • Year 1987
    Accuracy Estimate
    Description 50.84% Al2o3 Ore Throughput (Estimated) 2787000 Metric Tons Of Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2787000mt 51wt-pct
  • Year 1988
    Accuracy Estimate
    Description 50.60% Al2o3 Ore Throughput (Estimated) 2593000 Metric Tons Of Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2593000mt 51wt-pct
  • Year 1989
    Accuracy Estimate
    Description 50.79% Al2o3 Ore Throughput (Estimated) 2352000 Metric Tons Of Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2352000mt 51wt-pct
  • Year 1990
    Accuracy Estimate
    Description 50.63% Al2o3 Ore Throughput (Estimated) 2415000 Metric Tons Of Ore.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 2415000mt 51wt-pct
  • Year 1993
    Accuracy Estimate
    Description Al203 Ore Throughput (Estimated) 1500000 Metric Tons Of Ore.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 1500000mt

Comments on the production information

  • BAUXITE PRODUCTION IN 1991 WAS 2.01 MILLION TPY. BAUXITE PRODUCTION IN 1992 WAS 1.72 MILLION TPY. BAUXITE PRODUCTION IN 1993 WAS 1.56 MILLION TPY.
  • THE FENYOFO MINE EXPLOITS ITS LENTICULAR OREBODIES BY UNDERGROUND MINING WITH PRODUCTION AT ABOUT 450,000 TPY. THE BAKONYOSZLOP MINE WILL BE DEVELOPED TO REPLACE THE NYIRAD MINE. IT CONTAINS SEVERAL LENTICULAR OREBODIES WHICH WILL BE WORKED BY OPEN PIT AND UNDERGROUND METHODS. PUMP STATIONS HAVE BEEN SUCCESSFULLY USED TO SOLVE THE FLOODING PROBLEMS IN THE NYIRAD AREA. THE PUMPED WATER IS THEN USED FOR DOMESTIC, ENVIRONMENTAL, AND INDUSTRIAL PURPOSES. EVEN THOUGH EXTENSIVE PUMPING HAS BEEN EXECUTED TO LOWER THE WATER TABLE BELOW THE BAUXITE ORE OF THE NYIRAD MINES AND SIMULTANEOUSLY SUPPLY THE SURROUNDING DOMESTIC, ENVIRONMENTAL, AND INDUSTIAL NEEDS, THIS PUMPING OF THE GROUNDWATER OVER THE YEARS HAS UPSET THE NATURAL EQUILIBRIUM OF THE WATER TABLE. IN AN EFFORT TO PRESERVE THE LOCAL ENVIRONMENT, THE RATE OF WATER PUMPING HAS BEEN REDUCED TO THE EXTENT THAT THE NYIRAD BAUXITE MINES HAVE BEEN REFLOODED. THIS IS THE REASON WHY THE NYIRAD MINES WERE EXPECTED TO CEASE PRODUCTION IN 1990. THE CLOSURE OF THE NYIRAD BAUXITE MINES IS ESTIMATED TO RESULT IN THE LOSS OF TWO MILLION TONS OF HIGH QUALITY BAUXITE.

Comments on the reserve resource information

  • THE DATA FOR THIS MINE, BAKONY BAUXITE MINES, ALSO INCLUDES: THE NYIRAD, HALIMBA III, IHARKUT, BITO II, FENYOFO I, AND THE BAKINYOSZLOP MINES. THE SEQUENCE NUMBERS FOR EACH OF THE MINES ARE AS FOLLOWS: THE NYIRAD DISTRICT MINE, 4370850001; NYIRAD I, 4370900002; HALIMBA MINE, 4370900001; HALIMBA DISTRICT, 4370900019; AND THE FENYOFO MINE, 4370900013. IN 1975, MINING FROM THE HALIMBA MINE WAS BELOW THE WATER TABLE AT 40 TO 50 METERS. DEPOSITS CONSIST OF HUNDREDS OF LENSES WITH EACH CONTAINING 10,000 TO ONE MILLION TONS. A PRODUCTION RATE OF 450,000 TONS PER YEAR OR 1,800 TONS PER DAY HAS BEEN REPORTED AT THE HALIMBA III MINE AND PLANS ARE UNDERWAY TO INCREASE PRODUCTION TO 600,000 TONS PER YEAR. BAUXITE FROM THE HALIMBA MINE GOES TO THE AJKA PROCESSING PLANT IN TWELVE-TON TRUCKS WITH SIX TON TRAILERS THE ALUMINA IS THEN SENT TO EITHER SMELTERS IN HUNGARY OR EXPORTED. REPORTED RESERVES AS OF 1994 ARE SUFFICIENT TO LAST 30 YRS AT CURRENT RATES OF PRODUCTION. ABOUT 80% OF PRODUCTION FROM UNDERGROUND MINES USING MODERN TECHNOLOGY. FOUR UG MINES AND ONE OPEN PIT ARE INCLUDED IN THIS GROUP. A SIGNIFICANT PORTION OF THE RESOURCES OCCURS BELOW THE WATER TABLE. BECAUSE OF ENVIRONMENTAL PROBLEMS ASSOCIATED WITH PUMPING, THE COMPANY IS REDUCING THE AMT OF MINING BELOW THE WATER TABLE.
  • ALUMINUM GRADE AS REPORTED BY CRU RANGED FROM 50.06% TO 50.84% AND IS A HEAD GRADE (PROBABLY INCLUDING DILUTION).

Workings at the site

  • Type of workings Surface
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ESTIMATE
    Mining Method OPEN PIT
    Capacity 1996
    Capacity Units MT ORE/DAY
    Operating Days per Year 300
    Operating Shifts per Day 1
    Year of Information 1989
  • Type of workings Underground
    Field Value
    MAS Development Schedule # 1
    Mining Record # 2
    Status of Mining Method ESTIMATE
    Mining Method ROOM AND PILLAR 10-34
    Capacity 7984
    Capacity Units MT ORE/DAY
    Operating Days per Year 300
    Operating Shifts per Day 2
    Year of Information 1989

Comments on the workings information

  • MOBILE EQUIPMENT INCLUDES ATLAS COPCO CAVO 310 LOADERS, GHH LHD MACHINES AND ATLAS COPCO CAVO DRILLING RIGS IN THE UNDERGROUND MINES. THE TOTAL LABOR FORCE FOR THE YEAR OF 1990 FOR THE BAKONY BAUXITE MINES, INCLUDING THE NYIRAD, HALIMBA III, IHARKUT, BITO II, FENYOFO I, AND BAKINYOSZLOP MINES, WAS 3,200 PERSONNEL.

Comments on other economic factors

  • EXPORTS OF BAUXITE TO CZECHOSLOVAKIA, EAST GERMANY, AND POLAND HAVE DECLINED FROM 542000 TONS IN 1980 TO 379000 TONS IN 1988. THE REMAINDER OF THE PRODUCTION IS DELIVERED TO THE AJKA, ALMASFUZITO, AND MASONMAGYAROVAR CHEMICAL GRADE, ALUMINA PLANTS OF HUNGALU. THE TOTAL RESERVES FOR THE BAKONY BAUXITE MINES, INCLUDING THE NYIRAD, HALIMBA III, IHARKUT, BITO II, FENYOFO I, AND BAKINYOSZLOP MINES ARE ESTIMATED AT 167,000,000 TONS.

Reference information

Bibliographic references

  • Production

    PLATT'S METALS WEEK FOCUS, P. 18 (MAR. 1994).

  • Deposit

    BARDOSSY, G., "BAUXITE DEPOSITS OF HUNGARY" IN BAUXITE-ALUMI

  • Deposit

    INUM. PROC. 2D INTERNAT. SYMP. ICSOBA, BUDAPEST, 1969, VOL.

  • Deposit

    -20 (1971).

  • Deposit

    HUNGARIAN BAUXITE MINING IN THE BAKONY REGION, MINING

  • Deposit

    MAGIZINE, L. 132, PP. 350-59 (MAY 1975).

  • Deposit

    METALS SOURCE BOOK, ITEM (A0834) (JAN. 15, 1973).

  • Deposit

    SURVEY OF PLANNED INCREASES IN WORLD BAUXITE, ALUMINA AND

  • Deposit

    ALUMINUM APACITIES 1974 - 1979, LONDON: ALUMINUM CONDUCTOR

  • Deposit

    DEVELOPMENT, (1973).

  • Deposit

    MINING JOURNAL, P. 11 (JULY 16, 1973).

  • Deposit

    MINING ANNUAL REVIEW P. 511 (1975).

  • Deposit

    MINING ANNUAL REVIEW P. 435 (1972).

  • Deposit

    MINING ANNUAL REVIEW P. 449 (1974).

  • Deposit

    INDUSTRIAL MINERALS, P. 21 (SEPT. 1991).

  • Deposit

    INTERNATIONAL MINING, P. 23 (JUNE 1990).

  • Deposit

    COMMODITIES RESEARCH UNIT LIMITED, LONDON, THE BASE METAL

  • Deposit

    INDUSTRIES OF EASTERN EUROPE, PP. 149-50 (1990).

Reporter information

Type Date Name Affiliation Comment
Reporter 23-SEP-96 Wilburn, David R. U.S. Bureau of Mines