Tocantinscnt

Producer in Goias, Brazil with commodities Cobalt, Nickel
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Mining district
  11. Ownership information
  12. Production statistics
  13. Workings at the site
  14. Links to other databases
  15. Bibliographic references
  16. Reporter information

Geologic information

Identification information

Deposit ID 10207075
MAS/MILS ID 3510170008
Record type Site
Current site name Tocantinscnt
Alternate or previous names Niquelandia, Buriti Mine

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: -48.38237, -14.5477 (WGS84)
Elevation 1100
Location accuracy 10000(meters)

Site location context

Political divisions (FIPS codes)

Goias(province)

Brazil(country)

South America(continent)

Land(continent)

Geographic areas

Country State
Brazil Goias

Commodities

Commodity Importance
Cobalt Critical Secondary
Nickel Critical Primary

Materials information

Materials Type of material
Chalcopyrite Unknown
Garnierite Unknown
Limonite Unknown
Pentlandite Unknown
Pyrite Unknown
Pyrrhotite Unknown

Nearby scientific data

Ore Body (1) -48.38237, -14.5477

Economic information

Ore body information

  • Thickness 7M
    Length 1400M
    Depth to top 10M
    Field Value
    MAS Matrix # 1
    MAS Column # 3
    Type of Orebody #1 LATERITE
    Shape of Orebody #1 LENTICULAR
    Primary mode of Origin MAGMATIC DIFFER
    Primary Ore Control BEDDING
    Degree of Wallrock Alter. UNKNOWN
    Minimum Depth to Top 0
    Avg. Thick. Unconsol. Mat. 3
    Min. Thick. Unconsol. Mat. 0
    Date of Last Modification 830712

Comments on the geologic information

  • THE MINERALIZED BED IS ESTIMATED TO HAVE AN AVERAGE THICKNESS OF 15 METERS IN THE PYROXENITIC BELT, AND FROM 3 TO 5 METERS IN THE SERPENTINITIC BELT. IT HAS A LENGTH OF 800 TO 2,000 METERS. THE NIQUELANDIA DEPOSITS ARE TYPICAL NICKEL LATERITE ORE BODIES DEVELOPED BY WEATHERING OF AN ULTRAMAFIC INTRUSIVE HOST ROCK.

Economic information about the deposit and operations

Operation type Surface
Development status Producer
Commodity type Metallic
Significant Yes
Discovery year 1908
Mining method Strip-Hillside
Year of first production 1981
Milling method Pyrometallurgy Unspecified

Mining district

District name Goias

Ownership information

  • Type Operator
    Owner Companhia Niquel De Tocantins (Cnt)
    Home office Brazil
    Year 1991
  • Type Owner
    Owner Votorantin
    Interest 100
    Home office Brazil
    Year 1991

Comments on the ownership information

  • COMPANHIA NIQUEL DE TOCANTINS IF FULLY OWNED BY THE VOTORANTIN FINANCIAL GROUP.

Production statistics

  • Year 1991
    Description Planned Production 5000 Mt Ni (Metal)
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Nickel Nickel 5000mt
  • Year 1991
    Description Planned Production 7000 Mt Ni (Carbonate)
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Nickel Nickel 7000mt

Comments on the production information

  • PRODUCT A REPRESENTS NI CARBONATE W/CO OUTPUT OF 49 TONNES/DY = 17150 TONNES/YR. PRODUCT B,C REPRESENT OUTPUTS NI METAL AND CO METAL, RESPECTIVELY, OF 20 TONNES/DY = 7000 TONNES/YR, AND 0.6 TONNES/DY = 210 TONNES/YR.

Comments on the reserve resource information

  • ORE ESTIMATES DERIVED FROM 1987 CONTRACT. LATIN AMERICAN MINING LETTER INI 1987 PUBLISHED ESTIMATES OF 28.6 MT AT .99 NI
  • OPERATION APPARENTLY COST APPROXIMATELY $100 MILLION FIRST STAGE OF THE NIQUELANDIA PROJECT, WHICH BEGAN OPERATION AT THE END OF 1981. INITIAL PRODUCTION TOTALLED 5,000 TPY OF ELECTROLYTIC NICKEL, WITH AN ADDITIONAL 5,000 TYP BY 1981. 2/88 PROPERTY IS ON-LINE AND PRO DUCES NICKEL AND COBALT, THERE ARE EXPANSION ACTIVITIES AT PRESENT NICKEL CONCENTRATE IS REFINED IN SAO PAULO EXPECTED TO REFI NE 240 MT OF COBALT IN 1990

Workings at the site

  • Type of workings Surface
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ACTUAL
    Mining Method OPEN PIT
    Percent Waste Rock 25
    Primary Material Cover M-HARD ROCKS
    Hardness of Ore M-HARD ROCKS
    Capacity 1920
    Capacity Units MT ORE/DAY
    Unit Production Cost 5
    Units of Production $/MT ORE
    Operating Days per Year 300
    Operating Shifts per Day 2
    Year of Information 1991

Reference information

Bibliographic references

  • Deposit

    MINING JOURNAL. MINING ANNUAL REVIEW. 1981.

  • Deposit

    NICKDATA, INC. A COMPREHENSIVE NICKEL INDUSTRY COST DATABASE

  • Deposit

    AND COSTING PROGRAM. 1991. ILMAR J. MARTENS,

  • Deposit

    THOMAS F. TORRIES.

Reporter information

Type Date Name Affiliation Comment
Reporter 10-MAR-97 Bleiwas, Donald U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.