Ashanti Obuasi Concession

Plant in Ashanti, Ghana with commodities Gold, Silver
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Economic information about the deposit and operations
  8. Ownership information
  9. Production statistics
  10. Reserves and resources
  11. Links to other databases
  12. Bibliographic references
  13. General comments
  14. Reporter information

Geologic information

Identification information

Deposit ID 10208086
MAS/MILS ID 7490050002
Record type Site
Current site name Ashanti Obuasi Concession
Alternate or previous names Ashanti Goldfields

Geographic coordinates

Point of reference Town
Geographic coordinates: -1.70686, 6.45112 (WGS84)
Location accuracy 10000(meters)

Site location context

Political divisions (FIPS codes)

Ashanti(province)

Ghana(country)

Africa(continent)

Land(continent)

Geographic areas

Country State
Ghana Ashanti

Commodities

Commodity Importance
Gold Primary
Silver Secondary

Nearby scientific data

Town (1) -1.70686, 6.45112

Economic information

Economic information about the deposit and operations

Operation type Underground
Development status Plant
Commodity type Metallic
Significant Yes
Mining method Open Stope - Sublevel
Plant type Beneficiation (Mill)
Plant subcategory Flotation
Milling method Flotation

Ownership information

  • Type Owner-Operator
    Owner Ashanti Goldfields Corp. Ltd.
    Interest 100
    Home office Ghana
    Year 1991
  • Type Owner
    Owner Government Of Ghana
    Interest 55
    Home office Ghana
    Year 1991
  • Type Owner-Operator
    Owner Lonrho Ltd.
    Interest 45
    Home office United Kingdom
    Year 1991

Production statistics

  • Year 1991
    Description Production Of Gold Bullion 18 Metric Tons.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 18mt
  • Year 1992
    Description Production Of Gold Bullion 20 Metric Tons.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 20mt
  • Year 1993
    Description Production Of Gold Bullion (Projected) 23 Metric Tons.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 23mt

Reserves and resources

  • Type In-situ
    Estimate year 1976
    Measured 3296000mt ore
    Demonstrated 3296000mt ore
    Total resources 3296000mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 26.9 g/mt Gold Major 1976
  • Type In-situ
    Estimate year 1993
    Indicated 35640000mt ore
    Demonstrated 35640000mt ore
    Total resources 35640000mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 10.24 g/mt Gold Major 1993

Comments on the reserve resource information

  • OPERATION PRODUCED 279,560 OZ AU IN 1987/ 311,767 OZ AU IN 1988/ AND 337,211 OZ AU IN 1989. THESE AMOUNTS ARE UP FROM 264,280 OZ AU (FROM MILLING 814,000 MT ORE) IN 1985. OPERATION WAS ANALYZED FOR THE 1983 AU AVAILABILITY STUDY AND WILL BE UPDATED FOR THE 1992 AU AVAILABILITY STUDY (WILL INCLUDE TAILINGS RETREATMENT OPERATION). ADDING 110,000-115,000 OZ/YR TO CAPACITY BY 1993. 1992 ASHANTI CAPACITY (NOT INCLUDING SANSU OPERATION,SEQ.NO. 749-005-0003) = 900,000 MTPY UG ORE PLUS 700,000 MTPY TAIL- INGS MATERIAL. COORDINATES ARE OF CITY OF OBUASI, IN VICINITY OF CONCESSION.
  • AS OF 1989. DOES NOT INCLUDE 20,000,000 MT OF TAILINGS GRADING 1.4-1.7 G/MT FOR RETREATMENT.

Reference information

Bibliographic references

  • Production

    QUARTERLY MINE ANALYSIS, P. 22 (JUNE 1993).

  • Production

    MINING MAGAZINE, P. 6 (JAN. 1994).

  • Reserve-Resource

    QUARTERLY MINE ANALYSIS, P. 31 (JUNE 1993).

  • Deposit

    E/MJ INTL.DIRECTORY OF MINING AND MINERAL PROCESSING

  • Deposit

    OPERATIONS,1978.MCGRAW HILL,N.Y.PP.30,292.

  • Deposit

    WORLD MINING CATALOG SURVEY&DIRECTORY.1976.P.142.

  • Deposit

    WORLD MINING CATALOG SURVEY&DIRECTORY.1977.P.144.

  • Deposit

    WORLD MINING.OCT.1975.P.81.

General comments

Subject category Comment text
Deposit AS OF 1978:8,400 EMPLOYEES,10 SHAFTS.SUB-LEVEL CAVING(57% OF ORE PRODUCTION IN 1975),CUT&FILL MINING METHODS. PRODUCTION BEGAN IN 1897. 1974-875,417 MT ORE MILLED,14.7 GR/MT RECOVERED(75% ) 1975-944,438 MT ORE MILLED,11.3 GR/MT RECOVERED(65%) 1976-1,044,576 MT ORE MILLED,10.2 GR/MT RECOVERED(62%) 1977-997,530 MT ORE MILLED(.61:1.0 WASTE TO ORE) ADANSI SHAFT COMPLETED 1975-1,603 M DEEP,HOISTING CAPACITY OF 544,200 MT ORE/YR(45,350 MT/MO).ADANSI SHAFT GIVES ACCESS TO 3,628,000 MT RESERVE.SHAFT IS 5.5 M IN DIA. MINE ORE CAPACITY IS 2,721 MTPD MILL FEED CAPACITY IS 2,721 MTPD. CONCENTRATION CONSISTS OF STRAKING,FLOTATION,ROASTING& CYANIDATION. COMPANY CHANGED TO 5 DAY WORK WEEK IN 1976 WITH RESULTING MAJOR EFFECT ON OUTPUT&COSTS. TOTAL VENTILATION FLOW IS 42,475 CU M/MIN.

Reporter information

Type Date Name Affiliation Comment
Reporter 29-AUG-1994 Boyle, Ed U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.