| Deposit ID | 10208086 |
|---|---|
| MAS/MILS ID | 7490050002 |
| Record type | Site |
| Current site name | Ashanti Obuasi Concession |
| Alternate or previous names | Ashanti Goldfields |
| Point of reference | Town |
|---|---|
| Geographic coordinates: | -1.70686, 6.45112 (WGS84) |
| Location accuracy | 10000(meters) |
Political divisions (FIPS codes)
Ashanti(province)
Ghana(country)
Africa(continent)
Land(continent)
| Country | State |
|---|---|
| Ghana | Ashanti |
| Commodity | Importance |
|---|---|
| Gold | Primary |
| Silver | Secondary |
| Town (1) | -1.70686, 6.45112 |
|---|
| Operation type | Underground |
|---|---|
| Development status | Plant |
| Commodity type | Metallic |
| Significant | Yes |
| Mining method | Open Stope - Sublevel |
| Plant type | Beneficiation (Mill) |
| Plant subcategory | Flotation |
| Milling method | Flotation |
| Type | Owner-Operator |
|---|---|
| Owner | Ashanti Goldfields Corp. Ltd. |
| Interest | 100 |
| Home office | Ghana |
| Year | 1991 |
| Type | Owner |
|---|---|
| Owner | Government Of Ghana |
| Interest | 55 |
| Home office | Ghana |
| Year | 1991 |
| Type | Owner-Operator |
|---|---|
| Owner | Lonrho Ltd. |
| Interest | 45 |
| Home office | United Kingdom |
| Year | 1991 |
| Year | 1991 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Gold Bullion 18 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Year | 1992 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Gold Bullion 20 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Year | 1993 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Gold Bullion (Projected) 23 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1976 | ||||||||||||||
| Measured | 3296000mt ore | ||||||||||||||
| Demonstrated | 3296000mt ore | ||||||||||||||
| Total resources | 3296000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1993 | ||||||||||||||
| Indicated | 35640000mt ore | ||||||||||||||
| Demonstrated | 35640000mt ore | ||||||||||||||
| Total resources | 35640000mt ore | ||||||||||||||
| |||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 7490050002 |
QUARTERLY MINE ANALYSIS, P. 22 (JUNE 1993).
MINING MAGAZINE, P. 6 (JAN. 1994).
QUARTERLY MINE ANALYSIS, P. 31 (JUNE 1993).
E/MJ INTL.DIRECTORY OF MINING AND MINERAL PROCESSING
OPERATIONS,1978.MCGRAW HILL,N.Y.PP.30,292.
WORLD MINING CATALOG SURVEY&DIRECTORY.1976.P.142.
WORLD MINING CATALOG SURVEY&DIRECTORY.1977.P.144.
WORLD MINING.OCT.1975.P.81.
| Subject category | Comment text |
|---|---|
| Deposit | AS OF 1978:8,400 EMPLOYEES,10 SHAFTS.SUB-LEVEL CAVING(57% OF ORE PRODUCTION IN 1975),CUT&FILL MINING METHODS. PRODUCTION BEGAN IN 1897. 1974-875,417 MT ORE MILLED,14.7 GR/MT RECOVERED(75% ) 1975-944,438 MT ORE MILLED,11.3 GR/MT RECOVERED(65%) 1976-1,044,576 MT ORE MILLED,10.2 GR/MT RECOVERED(62%) 1977-997,530 MT ORE MILLED(.61:1.0 WASTE TO ORE) ADANSI SHAFT COMPLETED 1975-1,603 M DEEP,HOISTING CAPACITY OF 544,200 MT ORE/YR(45,350 MT/MO).ADANSI SHAFT GIVES ACCESS TO 3,628,000 MT RESERVE.SHAFT IS 5.5 M IN DIA. MINE ORE CAPACITY IS 2,721 MTPD MILL FEED CAPACITY IS 2,721 MTPD. CONCENTRATION CONSISTS OF STRAKING,FLOTATION,ROASTING& CYANIDATION. COMPANY CHANGED TO 5 DAY WORK WEEK IN 1976 WITH RESULTING MAJOR EFFECT ON OUTPUT&COSTS. TOTAL VENTILATION FLOW IS 42,475 CU M/MIN. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 29-AUG-1994 | Boyle, Ed | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.