| Deposit ID | 10230368 |
|---|---|
| MAS/MILS ID | 1220600002 |
| Record type | Site |
| Current site name | Whitehorse Copper |
| Alternate or previous names | Little Chief, Middle Chief,, Big Chief, Artic Cheif,, Best Chance, War Eagle,, Black Cub, Kodiac Cub, Gern, Cowby Park, Kuwenaw, |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -135.05997, 60.63589 (WGS84) |
| Elevation | 792 |
Political divisions (FIPS codes)
Alaska(state)
United States(country)
North America(continent)
Land(continent)
| Country |
|---|
| Canada |
| Commodity | Importance |
|---|---|
| Copper | Primary |
| Gold | Secondary |
| Silver | Secondary |
| Materials | Type of material |
|---|---|
| Actinolite | Unknown |
| Azurite | Unknown |
| Bornite | Unknown |
| Chalcocite | Unknown |
| Chalcopyrite | Unknown |
| Chlorite | Unknown |
| Chrysocolla | Unknown |
| Copper | Unknown |
| Covellite | Unknown |
| Cuprite | Unknown |
| Diopside | Unknown |
| Epidote | Unknown |
| Garnet | Unknown |
| Goethite | Unknown |
| Gold | Unknown |
| Hematite | Unknown |
| Limonite | Unknown |
| Magnetite | Unknown |
| Malachite | Unknown |
| Molybdenite | Unknown |
| Powellite | Unknown |
| Pyrite | Unknown |
| Pyrrhotite | Unknown |
| Scheelite | Unknown |
| Serpentine | Unknown |
| Silver | Unknown |
| Tetrahedrite | Unknown |
| Ore Body (1) | -135.05997, 60.63589 |
|---|
| Strike | N45W | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 75N | ||||||||||||||||||||||||||||||||
| Thickness | 396M | ||||||||||||||||||||||||||||||||
| Length | 305M | ||||||||||||||||||||||||||||||||
| Width | 24M | ||||||||||||||||||||||||||||||||
| Area | 20HA | ||||||||||||||||||||||||||||||||
| Depth to top | 183M | ||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Past Producer |
| Commodity type | Metallic |
| Significant | No |
| Discovery year | 1897 |
| Year of first production | 1967 |
| District name | Whitehorse |
|---|
| Type of mineral rights | Unknown |
|---|
| Ownership category | County |
|---|
| Type | Owner |
|---|---|
| Owner | Hudson Bay Mining And Smelting Co., Ltd. |
| Interest | 100 |
| Home office | Canada |
| Year | 1989 |
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1973 | ||||||||||||||
| Indicated | 7157000mt ore | ||||||||||||||
| Demonstrated | 7157000mt ore | ||||||||||||||
| Inferred | 9550000mt ore | ||||||||||||||
| Total resources | 16707000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1973 | ||||||||||||||||||||||||||||
| Indicated | 2771000mt ore | ||||||||||||||||||||||||||||
| Demonstrated | 2771000mt ore | ||||||||||||||||||||||||||||
| Inferred | 2771000mt ore | ||||||||||||||||||||||||||||
| Total resources | 5542000mt ore | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1972 | ||||||||||||||
| Indicated | 2575000mt ore | ||||||||||||||
| Demonstrated | 2575000mt ore | ||||||||||||||
| Total resources | 2575000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1991 | ||||||||||||||
| Measured | 406000mt ore | ||||||||||||||
| Demonstrated | 406000mt ore | ||||||||||||||
| Total resources | 406000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1989 | ||||||||||||||
| Measured | 450000mt ore | ||||||||||||||
| Demonstrated | 450000mt ore | ||||||||||||||
| Total resources | 450000mt ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 5300M | ||||||||||||||||||||||||||||||||||||||||||
| Overall depth | 381M | ||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 1220600002 |
LINZEY, DOUG, CONCENTRATOR OPERATIONS AT WHITEHORSE COPPER;
CANADIAN MINING JOURNAL, MARCH, 1977, P.18,20.
LINZEY, D., WHITEHORSE COPPER MINES LTD., E.E. PICKETT, ED.,
IN MILLING PRACTICE IN CANADA, CIM SPECIAL VOLUME 16,
1978, P.130-132.
CANADIAN MINES HANDBOOK 1984-85, NORTHERN MINER PRESS,P.182.
MR 223, 1989, YT-17.
CANADIAN MINES HANDBOOK, 1991-92, P.57.
ENGINEERING AND MINING JOURNAL, 10/89, P.71.
STAFF PAPER-WHITEHORSE COPPER MINES LTD- PRESENTED TO 2ND. I
SYMPOSIUM ON COLD REGIONS ENGINEERING-V. OF ALASKA- JU
ANNUAL REPORT 1974-WHITEHORSE COPPER MINES LTD.
ANNUAL REPORT 1975-WHITEHORSE COPPER MINES LTD.
JULY 1976 FINANCIAL SHEET-WHITEHORSE COPPER MINES LTD.
PAPER-R.G. HILKER-1967 AK. CENTENNIAL MINERALS CONFERENCE- U
-COPPER MINING ON THE WHITEHORSE COPPERBELT-YUKON TERR
1975 MINERAL INDUSTRY REPORT 1975 YUKON TERRITORY- W.D. SINC
J.A. MORIN, D.B. CRAIG, M. MARCHAND
SAWATSKY, DON, BUILDING ONE'S OWN MACHINES FOR BETTER
OPERATION AND MAINTENANCE: EXPERIENCE AT WHITEHORSE
COPPER MINES; WESTERN MINER, JULY, 1978, P.16,20.
WHITEHORSE COPPER MINES LTD. STAFF, OPERATIONS AT WHITEHORSE
COPPER MINES LTD.
PAZOUR, DONALD A., WHITEHORSE COPPER MINE: INNOVATIONS IN
THE YUKON; WORLD MINING, FEB., 1979, P.40-46.
WHITEHORSE COPPER MINE LTD. STAFF, WHITEHORSE COPPER MINE;
IN MINERAL INDUSTRIES IN WESTERN CANADA, THE TENTH
COMMONWEALTH MINING AND METALLURGICAL CONGRESS- SEPT.2-28
1974, SECTION V, ARTICLE D, P.1-17.
| Subject category | Comment text |
|---|---|
| Deposit | DURING 1975 A TOTAL OF 200 PERSONS WERE EMPLOYED TOTAL WAGES FOR 1975 (INCLUDING FRINGES) = $4305952 PGQM CONSTRUCTED FROM WHITEHORSE COPPER MINES 1975 ANNUAL RE CONCENTRATE GRADE IS 35%-45% COPPER PAST PRODUCTION TO 1975 AT 3941000 ST CU WITH A GRADE OF 1.5 HEAD OFFICE ADDRESS SUITE 1695 TWO BENTALL CENTRE 555 BURRARD STREET VANCOUVER, B.C. V7X1G6 MINE OFFICE ADDRESS P.O. BOX 4280 WHITEHORSE Y.T. Y1A3T3 MINE IS ORGANIZED UNDER UNITED STEELWORKERS OF AMERICA, LOCA SHARES LISTED: TORONTO STOCK EXCHANGE & VANCOUVER STOCK EXCH DAILY WATER USEAGE: 1200000 GPD- 800000 TO 900000 GPD IS REC AVERAGE MONTHLY POWER CONSUMPTION IN 1975 WAS 2584000 KWH POWER SUPPLIED BY YUKON ELECTRICAL COMPANY POWER DELIVERED TO SITE AT 34500 V.-PRIMARY DISTRIBUTION 416 MINE AIR IS HEATED BY A DIRECT FIRED PROPANE UNIT OF 1200000 MINE VENTILATION AIR- 123000 CFM MINE OCCURS IN GEOLOGIC STRUCTURE NAMED WHITEHORSE COPPERBEL LITTLE CHIEF MINE FIRST MINED AS AN OPEN PIT TO DEPTH OF 350 NEAREST MAJOR WATER SUPPLY IS THE YUKON RIVER-THREE KILOMETE TEMPERATURE RANGES - +80F IN SUMMER TO -40 TO -50F IN WINTER CONCENTRATES SHIPPED TO FLIN FLON MANITOBA FOR SMELTING ACQUISITION 500000 EXPLORATION 600000 DEVELOPMENT 14730258 MINE EQUIPMENT 1675361 MINE SURFACE PLANT 1000000 WORKING CAPITAL 419340 TOTAL MINE CAPITAL 1892 MILL EQUIPMENT 3130609 MILL BUILDINGS 1644145 MILL WORKING CAPITAL 419340 TOTAL MILL CAPITAL 519 |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 08-SEP-1994 | Porter, Kenneth E. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.