| Deposit ID | 10231205 |
|---|---|
| MAS/MILS ID | 4590000054 |
| Record type | Site |
| Current site name | Donskoy Complex Undgrd |
| Alternate or previous names | Glubokoe, Khromtau, Molodezhnoemolodyozhnaya, Tsentraljinaya |
| Point of reference | Town |
|---|---|
| Geographic coordinates: | 58.36797, 50.24799 (WGS84) |
| Location accuracy | 5000(meters) |
Political divisions (FIPS codes)
Kazakhstan(country)
| Country |
|---|
| Kazakhstan |
| Commodity | Importance |
|---|---|
| Chromium Critical | Primary |
| Materials | Type of material |
|---|---|
| Chromite | Unknown |
| Town (1) | 58.36797, 50.24799 |
|---|
| |||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1936 |
| Year of first production | 1982 |
| Milling method | Sizing |
| District name | Khromtau |
|---|
| Type of mineral rights | Unknown |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | Government Of Kazakhstan |
| Interest | 100 |
| Home office | Kazakhstan |
| Year | 1991 |
| First year | 1991 |
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Mt/Yr From Underground Operation 1500000 Metric Tons | ||||||||||||||
| |||||||||||||||
| Type of workings | Underground | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 4590000054 |
METAL BULLETIN, P. 13 (JUNE 7, 1993).
SMIRNOV, V.I., ORE DEPOSITS OF THE U.S.S.R., VOL. 1. PITMAN
PUBLISHING, LONDON, 1977, PP. 206-208.
THE TEX REPORT, VOL. 23, NO. 5483, SEPT. 13, 1991, PP. 8-13.
| Subject category | Comment text |
|---|---|
| Deposit | THIS SEQUENCE NO. REPRESENTS UNDERGROUND MINING AT THE DONSKOY COMPLEX. THE UNDERGROUND MINE CONSIST OF TWO WORKING FACES: MOLODYOZHNAYA AND TSENTRALJINAYA. IN ADDITION, A THIRD WORKING FACE, GLUBOKOE, IS BEING DEVELOPED. PRODUCTION OF THE MOLODYOZHNAYA DEPOSIT IS REPORTED TO BE 1.5 MMT PER YEAR. TOTAL PRODUCTION FOR THE DONSKOY COMPLEX WAS 3.7 MMT IN 1991. WHILE THE TOTAL PRODUCTION IS REPORTED TO BE INCREASED TO 4.0 MMT BY 1993, THE PRODUCTION RATE AT THE UNDERGROUND MINE IS NOT EXPECTED TO EXPAND BEYOND THE CURRENT CAPACITY OF 1.5 MMT PER YEAR. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 15-SEP-1995 | Wilburn, David R. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.