Lochaber Ft William

Plant in United Kingdom with commodity Aluminum, Contained or Metal
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Economic information about the deposit and operations
  8. Land status
  9. Ownership information
  10. Production statistics
  11. Links to other databases
  12. Bibliographic references
  13. General comments
  14. Reporter information

Geologic information

Identification information

Deposit ID 10231320
MAS/MILS ID 4120451017
Record type Site
Current site name Lochaber Ft William
Alternate or previous names Lochaberft Williamscotland

Geographic coordinates

Point of reference Plant
Geographic coordinates: -5.09745, 56.09907 (WGS84)
Location accuracy 1000(meters)

Site location context

Political divisions (FIPS codes)

United Kingdom(country)

Europe(continent)

Land(continent)

Geographic areas

Country
United Kingdom

Commodities

Commodity Importance
Aluminum, Contained or Metal Critical Primary

Nearby scientific data

Plant (1) -5.09745, 56.09907

Economic information

Economic information about the deposit and operations

Operation type Processing Plant
Development status Plant
Commodity type Metallic
Significant Yes
Year of first production 1929
Plant type Smelter
Plant subcategory Smelter-Pyrometallurgy

Land status

Ownership category Private

Ownership information

  • Type Operator
    Owner British Aluminium Ltd.
    Home office United Kingdom
    Year 1988
  • Type Owner
    Owner Alcan Aluminum Ltd.
    Interest 100
    Year 1988

Production statistics

  • Year 1980
    Description Aluminum Metal Production 28000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 28000mt
  • Year 1981
    Description Aluminum Metal Production 16000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 16000mt
  • Year 1982
    Description Aluminum Metal Production 36000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 36000mt
  • Year 1983
    Description Aluminum Metal Production 38000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 38000mt
  • Year 1985
    Period 1984-1985
    Description Aluminum Metal Production; 1984-85 39000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 39000mt
  • Year 1986
    Description Aluminum Metal Production 38000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 38000mt
  • Year 1987
    Description Aluminum Metal Production 39000 Mtpy Al Metal
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Aluminum, Contained or Metal Aluminum 39000mt

Comments on the reserve resource information

  • BRITISH ALCAN ALUMINIUM LTD IS THE OPERATOR. CAPACITY EXPRESSED IN TERMS OF AL METAL

Reference information

Bibliographic references

  • Deposit

    BOM/MINERALS AVAILABILITY PROGRAM, "PRIMARY POST-MILL

  • Deposit

    ALUMINUM SMELTING FACILITIES 1983; A DATA BANK", CONTRACT

  • Deposit

    #J0245003, OCTOBER 1, 1985.

  • Deposit

    BOM/BRANCH OF NONFERROUS METALS, "PRIMARY ALUMINUM PLANTS

  • Deposit

    WORLDWIDE", PART I - DETAIL, PAGE 129; PART II - SUMMARY,

  • Deposit

    PAGE 13.

  • Deposit

    BROOK HUNT & ASSOCIATES LTD., ALUMINIUM DATA, 1986, PAGE 214

  • Deposit

    1988, PAGE 1.131.

General comments

Subject category Comment text
Deposit MILS DATA IN THE "YEAR OF INITIAL PRODUCTION" IS THE YEAR START-UP. ALL DATA IS BASED ON THE 1987 ALUMINUM AVAILABILITY AND SUPPLY MODEL STUDY. DATE OF DATA IS 1987-88 UNLESS OTHERWISE NOTED. ALL GRADE DATA IN TERMS OF WT PCT CONTAINED ALUMINUM METAL. CAPACITY DATA ON THE CONCENTRATOR AND PRODUCT DATA SETS IS IN TERMS OF MT OF ALUMINA (AL2O3) CONCENTRATE INPUT PER DAY, IE, "MT CONC/DAY". COSTS ARE IN JAN 89US$. PRODUCT DATA SET "OUTPUT" DATA IS IN TERMS OF MT OF ALUMINUM METAL PRODUCTION PER DAY, IE, "MT COMMOD/DAY", IN JAN89$. TRANSPORTATION RECORDS 01 AND 02 WERE USED IN THE ECONOMIC EVALUATION OF THIS SMELTER. COST IS JAN 1989 U.S. $, THE UNITS ARE IN $ PER MT ALUMINA CONS, NOT $/KM/MT AS SHOWN ON THE DB LISTING. RECORDS 03 AND 04 WERE USED IN THE SUPPLY MODEL STUDY. DISTANCE AND COST WERE BASED ON CONTRACTOR AND IN-HOUSE MAFO DATA. COST ARE JAN 89US$, UNITS ARE IN $/KM/MT, AS INDICATED ON THE DB LISTING. ACTUAL COSTS ARE $5.04/MT ALUMINA, RECORD 03, AND $8.16/ MT ALUMINA, RECORD 04.

Reporter information

Type Date Name Affiliation Comment
Reporter 25-SEP-96 Buckingham, David A. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.