| Deposit ID | 10232159 |
|---|---|
| MAS/MILS ID | 6020400012 |
| Record type | Site |
| Current site name | Olympic Dam |
| Alternate or previous names | Roxby Downs |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 136.39885, -30.67952 (WGS84) |
| Location accuracy | 1000(meters) |
Political divisions (FIPS codes)
South Australia(province)
Australia(country)
Australia(continent)
Land(continent)
| Country | State |
|---|---|
| Australia | South Australia |
| Commodity | Importance |
|---|---|
| Copper | Primary |
| Gold | Primary |
| REE Critical | Tertiary |
| Silver | Primary |
| Uranium | Primary |
| Materials | Type of material |
|---|---|
| Bornite | Unknown |
| Brannerite | Unknown |
| Chalcocite | Unknown |
| Chalcopyrite | Unknown |
| Fluorite | Unknown |
| Hematite | Unknown |
| Pyrite | Unknown |
| Uraninite | Unknown |
| Ore Body (1) | 136.39885, -30.67952 |
|---|
| Thickness | 620M | ||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 1500M | ||||||||||||||||||||||||||
| Width | 400M | ||||||||||||||||||||||||||
| Depth to top | 660M | ||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| Area | 150HA | ||||||
|---|---|---|---|---|---|---|---|
| |||||||
| Operation type | Underground |
|---|---|
| Development status | Plant |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1975 |
| Mining method | Open Stope - Sublevel |
| Year of first production | 1988 |
| Plant type | Beneficiation (Mill) |
| Plant subcategory | Flotation |
| Milling method | Flotation |
| Type of mineral rights | Private Lease |
|---|
| Ownership category | Private |
|---|
| Type | Operator |
|---|---|
| Owner | Roxby Mining Corp. Pty. Ltd. |
| Home office | Australia |
| Year | 1994 |
| Type | Owner |
|---|---|
| Owner | Western Mining Corp. |
| Interest | 100 |
| Home office | Australia |
| Year | 1994 |
| Year | 1989 |
|---|---|
| Description | Production Of Silver 0 Ounces Of Silver. |
| Year | 1989 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Gold 2103 Ounces Of Refined Gold. | ||||||||||||||
| |||||||||||||||
| Year | 1989 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Uranium Oxide 912 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Year | 1989 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Refined Copper 16868 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Silver 42283 Ounces Of Refined Silver. | ||||||||||||||
| |||||||||||||||
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Gold 18126 Ounces Of Refined Gold. | ||||||||||||||
| |||||||||||||||
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Uranium Oxide 1005 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Production Of Refined Copper 37801 Metric Tons. | ||||||||||||||
| |||||||||||||||
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1991 | |||||||||||||||||||||
| Indicated | 28000000mt ore | |||||||||||||||||||||
| Demonstrated | 28000000mt ore | |||||||||||||||||||||
| Total resources | 28000000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1991 | |||||||||||||||||||||
| Indicated | 2100000mt ore | |||||||||||||||||||||
| Demonstrated | 2100000mt ore | |||||||||||||||||||||
| Total resources | 2100000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type | In-situ | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1991 | ||||||||||||||||||||||||||||||||||||||||||
| Indicated | 450000000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| Demonstrated | 450000000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| Total resources | 450000000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||
| Type | In-situ | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1991 | ||||||||||||||||||||||||||||||||||||||||||
| Inferred | 2000000000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| Total resources | 2000000000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1993 | |||||||||||||||||||||
| Indicated | 530000000mt ore | |||||||||||||||||||||
| Demonstrated | 530000000mt ore | |||||||||||||||||||||
| Total resources | 530000000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1993 | |||||||||||||||||||||
| Indicated | 42000000mt ore | |||||||||||||||||||||
| Demonstrated | 42000000mt ore | |||||||||||||||||||||
| Total resources | 42000000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1993 | |||||||||||||||||||||
| Indicated | 1200000000mt ore | |||||||||||||||||||||
| Demonstrated | 1200000000mt ore | |||||||||||||||||||||
| Total resources | 1200000000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 500M | ||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 500M | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 500M | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 6020400012 |
AUSTRALIA'S MINING MONTHLY, P. 21 (AUG. 1990).
WESTERN MINING CORP. HOLDINGS, LTD., 1988 AR, P. 21.
WESTERN MINING CORP. HOLDINGS, LTD., 1991 AR, P. 41.
REGISTER OF AUSTRALIAN MINING, 1990-91, P. 271.
REGISTER OF AUSTRALIAN MINING, 1991/92, P. 189.
MINING MAGAZINE, 5/91, P. 270.
BROOK HUNT & ASSOCIATES LIMITED, AUSTRALIAN & ASIAN
COPPER MINES COST STUDY (1988-1995), VOL. 2, P. 196 (1992).
WESTERN MINING CORP., 1993 ANNUAL REPORT, P.38,39.
ANON. 1979. "GOVERNMENT GREEN LIGHT FOR OLYMPIC DAM,"MINING
MAGAZINE. DECEMBER. MINING JOURNAL LIMITED. LONDON.
AUSTRALIAN MINES HANDBOOK 1977-78. PERTH.
DAIRES, JAMES. 1979. "THE PUZZLE OF ROXBY DOWNS ROCKS,"
AUSTRALIAN FINANCIAL REVIEW. SEPTEMBER 14. SYDNEY.
PERSONAL COMMUNICATIONS.
WESTERN MINING CORPORATION HOLDINGS, LTD. ANNUAL REPORTS
1975-79, AND COMPANY REPORTS TO THE STOCK EXCHANGE OF SYDNEY
ROXBY MANAGEMENT SERVICES PTY. LTD., THE OLYMPIC DAM COPPER-
URANIUM DEPOSIT, ROXBY DOWNS, SOUTH AUSTRALIA, COMPANY
INFORMATION RELEASE, 1975.
WORLD MINING, WESTERN GETS BP AUSTRALIA TO FINANCE ROXBY
DOWNS, SEPTEMBER 1979, P. 128.
WORLD MINING, AUSTRALIA'S BIG COPPER-URANIUM DEPOSIT, JULY
1981, PP. 28-32.
MINER NEWSPAPER, OLYMPIC REPORT GETS A MEDAL, AUGUST 31-
SEPTEMBER 13, 1981, PP. 8,9.
AUSTRALIA'S MINING MONTHLY, LATEST DATA ON ROXBY DOWNS
PRESENTED, NOVEMBER 1981, PP. 35-36.
MINER NEWSPAPER, START ON ROXBY DOWNS SHAFT, AUGUST 31-
SEPTEMBER 13, 1981, P. 4.
ENGINEERING AND MINING JOURNAL, DEVELOPMENT OF ROXBY DOWNS
DEPOSIT HANGS ON FUNDING, APRIL 1982, P. 4.
MINER NEWSPAPER, BILL FATE IN BALANCE, MARCH 15-28, 1982,
P. 55.
WORLD MINING, THE GREAT ROXBY DOWNS PROJECT FACES DIFFICULT
HURDLES, JUNE 1982, P. 41.
MINING MAGAZINE, UPDATE ON OLYMPIC DAM, SEPTEMBER 1982, P.
171.
MINER NEWSPAPER, EIS BOOST FOR ROXBY HOPES, OCTOBER 25-
NOVEMBER 7, 1982, P. 3.
MINER NEWSPAPER, SA COPPER FIND RIVALS ZAMBIA, OCTOBER 11-24
1982, P. 1.
MINER NEWSPAPER, THE OLYMPIC DAM PROJECT, APRIL 11-24, 1983,
PP. 21,22.
MINER NEWSPAPER, OUTLOOK FOR ROXBY DOWNS IMPROVING, JULY
18-31, 1983, P. 6.
ENGINEERING AND MINING JOURNAL, EXPLORATION MODELS...AND
THEN WE DRILLED OLYMPIC DAM, OCTOBER 1983, P. 11, 13.
ENGINEERING AND MINING JOURNAL, ROXBY DOWNS DEVELOPERS ENTER
FULL FEASIBILITY STUDY PHASE-EIS ACCEPTED, SEPTEMBER 1983,
PP. 28, 33.
FURLONG, DENNIS, ROXBY: NEW HURDLES TO BE CLEARED, MINER
NEWSPAPER, DECEMBER 5-18, 1983, P. 3.
MINING MAGAZINE, UPDATE ON OLYMPIC DAM CU-U-AU PROJECT,
AUSTRALIA, JANUARY 1985, P. 5.
ENGINEERING AND MINING JOURNAL, OLYMPIC DAM PARTNERS WILL
INITIATE FIRST-STAGE DEVELOPMENT THIS YEAR, JANUARY 1986,
PP. 11,13.
MINER NEWSPAPER, COPEL PRAISES OLYMPIC DAM DEVELOPMENT
PLANS, JULY 15-28, P. 4.
ENGINEERING AND MINING JOURNAL, FEASIBILITY STUDY SUPPORTS
DEVELOPMENT OF OLYMPIC DAM, AUGUST 1985, P. 16.
AUSTRALIA'S MINING MONTHLY, MOVE ON ROXBY DOWNS, AUGUST
1985, PP. 45-51.
MINER NEWSPAPER, ROXBY DOWNS DECISION IMMINENT, DECEMBER
2-15, 1985, P. 3.
MINING ACTIVITY DIGEST, JANUARY 24, 1986, PP. 1,2.
MINER NEWSPAPER, CONSTRUCTION PHASE BEGINS AS ROXBY IS
PROCLAIMED ON TARGET, JUNE 2-15, 1986, P. 5.
MINER NEWSPAPER, A NEW ERA FOR STATE, MAY 5-18, 1986, P. 34.
MINER NEWSPAPER, MASSIVE MINE APPROACHING COMPLETION,
OCTOBER 20-NOVEMBER 2, 1986, P. 28.
MINER NEWSPAPER, WORKERS COMMITTED TO SA'S LARGEST PROJECT,
MAY 5-18, 1986, PP. 11,12.
ENGINEERING AND MINING JOURNAL, INITIAL DEVELOPMENT ON
TARGET AT OLYMPIC DAM, APRIL 1987, P. 16.
MINING ACTIVITIES DIGEST, APRIL 24, 1987, PP. 5,6.
WILSON, MAURICE, OLYMPIC DAM, AUSTRALIAN MINING, MARCH 1987,
PP. 16-20.
CHADWICK, JOHN, OLYMPIAN COPPER-URANIUM, INTERNATIONAL
MINING, JUNE 1987, PP. 38-44.
MINER NEWPAPER, PROGRESS AT ROXBY ROLLS AHEAD OF PLAN,
SEPTEMBER 1-14, 1987, P. 11.
SUTTILL, KEITH R., OLYMPIC DAM: HEADING FOR 1988 STARTUP,
ENGINEERING AND MINING JOUNAL, NOVEMBER 1987, PP. 36-38.
MINER NEWSPAPER, OLYMPIC DAM COMMISSIONED--PROFITS START
FLOWING, NOVEMBER 1988, P. 4.
KENNEDY, ALAN, OLYMPIC DAM PROJECT, MINING MAGAZINE,
NOVEMBER 1988, PP. 330-344.
CAKE, DARREL, MINE OPENS AFTER 13 YEARS OF WORK, AUSTRALIA'S
MINING MONTHLY, DECEMBER/JANUARY, 1988/89, P. 24.
ENGINEERING AND MINING JOURNAL, WESTERN MINING-BP VENTURE
STARTS UP A MINE, PLANT, AND TOWN, DECEMBER 1988, P. 11.
WESTERN MINING CORPORATION HOLDINGS LTD., NEWSLETTER TO
SHARE HOLDERS, JANUARY 16, 1989.
WMC COMMEMORATIVE BROCHURE; THE OPENING OF THE OLYMPIC DAM
OPERATIONS SOUTH AUSTRALIA, NOV. 5, 1988.
MBM; OLYMPIC DAM - A RARE CASE OF INTEGRATION, 4/89, P.74,
75.
OLYMPIC DAM PROJECT; COMPANY PROMOTIONAL BROCHURE, 1988.
AUSTRALIA'S MINING MONTHLY; WMC PONDERS ROXBY OPTIONS, 8/89,
P. 10.
NEARY, C.R. & HIGHLEY, D.E.; THE ECONOMIC IMPORTANCE OF THE
RARE-EARTH ELEMENTS, REPRINTED FROM 'RARE EARTH GEO-
CHEMISTRY', BY P. HENDERSON, PUB. BY ELSEVIER, 1983.
AUSTRALIA'S MINING MONTHLY; OLYMPIC DAM INCREASES
PRODUCTION OF URANIUM, 8/90, P. 21-27.
MINING JOURNAL; OLYMPIC DAM EXPANSION, 2/22/91, P. 129, 130.
MINING MAGAZINE; OLYMPIC DAM EXPANSION, 5/91, P. 270.
THE MINER; GREEN LIGHT FOR WMC'S OLYMPIC EXPANSION, 3/91,
P. 3.
AUSTRALIAN BASE METALS REPORT, OCT. 25, 1991.
MINING ENGINEERING, "OLYMPIC DAM EXPANSION COMPLETED A $6
MILLION UNDER BUDGET", 7/92, P. 664.
AUSTRALIAN MINING, "OLYMPIC DAM EXPANSION COMPLETED BELOW
BUDGET", 10/92, PP. 32, 36, 27.
AUSTRALIAN MINING, 10/92, P. 47.
MINING WEEKLY, 11/6/92, P. 1.
AMERICAN META MARKET, 11/9/92, P. 6.
METALS WEEK, 11/9/92, P. 6.
MINING JOURNAL, LONDON, 11/6/92, P. 317, 318.
METAL BULLETIN, 11/12/92, P. 8.
MINING WEEKLY, 12/11/92, P. 1.
MINING MAGAZINE, 12/92, P. 430.
MINING ENGINEERING, 12/92, P. 1411.
METALS WEEKLY, 12/7/92, P. 6.
ENGINEERING AND MINING JOURNAL, 1/93, P. 12.
METALS BULLETIN, 2/1/93, P. 7.
MINING JOURNAL, LONDON, 3/5/93, P. 157.
MINING JOURNAL, 4/16/93, P. 275.
MINING ACTIVITY DIGEST, 5/93, P. 11.
MINING MAGAZINE, 6/93, P. 361.
METALS WEEKLY FOCUS, 9/93, P. 24, 26.
METALS BULLETIN, 8/5/93, P. 8.
WESTERN MINING CORP., "OLYMPIC DAM OPERATIONS GEOLOGY AND
MINING TECHNICAL HANDBOOK", ISSUE 2, 1993.
CREW, R.J., "MINING AND METALLURGICAL PRACTICES AT OLYMPIC
DAM, SOUTH AUSTRALIA".
REGISTER OF AUSTRALIAN MINING, 1994/95, P. 220.
VONK, A.S.M., "COPPER CONCENTRATOR PRACTICE AT THE OLYMPIC
DAM JOINT VENTURE, ROXBY DOWNS, SA", AUTRALASIAN MINING
AND METALLURGY, THE SIR MAURICE MAWBY MEMORIAL VOLUME,
SECOND EDITION, VOLUME 1, PP. 656-658.
LEUVEN, MARK VAN, "MINING OF COPPER-URANIUM-GOLD OR AT THE
OLYMPIC DAM JOINT VENTURE, ROXBY DOWNS, SA",
AUSTRALASIAN MINING AND METALLURGY, THE SIR MAURICE
MAWBY MEMORIAL VOLUME, SECOND EDITION, VOLUME 1,
PP. 620-626.
AMERICAN METAL MARKET, 3/17/93, P.5.
METAL BULLETIN, 3/8/93, P.12.
METAL BULLETIN, 4/5/93, P.5.
AUSTRALIA'S MINING MONTHLY, 9/94, P.46,47.
WESTERN MINING CORP., METALLURGICAL OPERATIONS HANDBOOK,
OLYMPIC DAM OPERATIONS, ISSUE 1, 12/89, 29PP.
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 25-SEP-1996 | Porter, Kenneth E. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.