Sinclair-Hythe

Plant in Alberta, Canada with commodities Natural Gas, Sulfur
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Mining district
  11. Mineral rights holdings
  12. Land status
  13. Ownership information
  14. Production statistics
  15. Workings at the site
  16. Links to other databases
  17. Bibliographic references
  18. General comments
  19. Reporter information

Geologic information

Identification information

Deposit ID 10254953
MAS/MILS ID 1220051147
Record type Site
Current site name Sinclair-Hythe
Alternate or previous names Sinclair

Comments on the site names

  • SOUR GAS PROCESSING PLANTS ARE GENERLY NAMED AFTER THE VARIOUS OR GAS FIELDS THEY SERVE. ON OCCATION THE PLANT WILL BE NAMED AFTER THE OPERATING COMPANY, OR SOME PROMINANT GEOGRAPHYICAL FEATURE.

Geographic coordinates

Point of reference Plant
Geographic coordinates: -119.80136, 55.38319 (WGS84)
Location accuracy 1000(meters)

Site location context

Political divisions (FIPS codes)

Alaska(state)

United States(country)

North America(continent)

Land(continent)

Geographic areas

Country State
Canada Alberta

Commodities

Commodity Importance
Natural Gas Primary
Sulfur Primary

Materials information

Materials Type of material
Sulfur Unknown

Nearby scientific data

Plant (1) -119.80136, 55.38319

Economic information

Ore body information

  • Field Value
    MAS Matrix # 1
    MAS Column # 1
    Type of Orebody #1 SEDIMENTARY
    Shape of Orebody #1 TABULAR
    Shape of Orebody #2 LENTICULAR
    Primary mode of Origin UNKNOWN
    Primary Ore Control UNKNOWN
    Degree of Wallrock Alter. NONE
    Type of Wallrock Alter. #1 UNKNOWN
    Date of Last Modification 920406

Economic information about the deposit and operations

Operation type Processing Plant
Development status Plant
Commodity type Non-metallic
Significant No
Year of first production 1983
Plant type Refiner
Plant subcategory Distillation
Milling method Distillation

Mining district

District name Alberta, Canada

Mineral rights holdings

Type of mineral rights Private Lease

Land status

Ownership category Private

Ownership information

  • Type Operator
    Owner Alberta Energy Co. Ltd.
    Interest 100
    Home office Canada
    Year 1991

Comments on the ownership information

  • FOR CANADIAN NATURAL GAS PROCESSING PLANTS, PLANT OWNERSHIP IS STATED IN TERMS OF THE COMPANY WHO OPERATES THE PLANT.

Production statistics

  • Year 1983
    Description Plant Design Capacity 3662000 Cub-Met/Day Raw Gas Inlet

Comments on the production information

  • PRODUCTS FORM THIS OPERATION ARE ELEMENTAL SULFUR (A); SWEET NATERAL GAS (SALES GAS-B); AND VARIOUS HYDROCARBON CONDENSATES SUCH AS ETHANE, PROPANE, ECT. CAPACITY UNITS SHOULD BE IN TERMS OF 1000 CUBIC METERS PER DAY RAW GAS INLET, FOR RECORDS PB AND PC. OUT PUT UNITS RECORD PB, ALSO 1000 CUBIC METERS PER DAY; RECORD PC IS JUST CUBIC METERS PER DAY.

Comments on the reserve resource information

  • SOUR GAS PROCESSING PLANTS DO NOT HAVE RESERVES OR RESOURCES PERSAY. PLANT OPERATE AT A SPECIFED RAW GAS INLET CAPACITY. THE CAPACITY FOR THIS PLANT, AS PUBLISHED IS 3,662,000 CUBIC METERS PER DAY OVER A 350 DAY OPERATING YEAR. THIS CAPACITY CONTAINS ABOUT 261 MT PER DAY SULFUR. APPROXIMATELY 256 MT PER DAY CAN BE RECOVERED FORM THIS RAW GAS.
  • NO ASSAY/FORM CHOISE FOR; RECORD 02, RECOVERED SWEET NATURAL GAS, IE "SALES GAS"; AND RECORD 03, THE VARIOUS HYDROCARBONS CONDENSATES THAT ARE RECOVERED.
  • QUANTITY DATA IS IN TERMS OF 1000 CUBIC METERS OF RAW INLET GAS PER DAY. Q1C1 IS BASED ON THE PLANTS DESIGN INLET CAPACITY OVER THE 17 YEAR STUDY LIFE. Q1C3 IS BASED ON AN ERCB PLANT FORECAST CAPACITY FROM 1988, THIS FORECAST ESTIMATE COVERS THE YEARS 1988 TO 1997, 2002 AND 2007.

Workings at the site

  • Type of workings Surface
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ACTUAL
    Capacity 3662
    Capacity Units CU-M ORE/DAY
    Operating Days per Year 350
    Operating Shifts per Day 3
    Year of Information 1991

Comments on other economic factors

  • SINCE THE OPERATION IS A RAW NATURAL GAS REFINERY, A SURFACE OPERATION, A MINING METHOD DOES NOT EXIST. THE CAPACITY IS IN OF 1000 CUBIC-METERS OF RAW GAS INLET KPER DAY.
  • BASCI DESCRIPTION OF THE GAS PLANT. CAPACITY IS IN TERMS OF 1000 CUBIC-METERS RAW SOUR GAS INLET PER DAY.

Reference information

Bibliographic references

  • Deposit

    INVESTMENT AND OPERATING COST STUDY SULPHUR RECOVERY

  • Deposit

    FACILITIES NATURAL GAS PROCESSING INDUSTRY (ENVIRONMENT

  • Deposit

    CANADA), FED-0254, MARCH, 1983, MHG INTERNATIONAL LTD.

  • Deposit

    SULPHUR RECOVERY AT ALBERTA GAS PLANTS PHASE 1 OF A REVIEW

  • Deposit

    OF THE GUIDELINES, TASK FORCE REPORT, STAFF OF ALBERTA,

  • Deposit

    ENERGY RESOURCES CONSERVATION BOARD (ERCB).

  • Deposit

    SUPHUR RECOVERED FROM OIL AND GAS IN CANADA, G.J. DESORCY,

  • Deposit

    ERCB, NOVEMBER, 1988, APPENDIX A.

  • Deposit

    ERCB, GAS PROCESSING PLANTS IN ALBERYTA, QUARTERLY UPDATE,

  • Deposit

    ERCB ST 91-50, JULY 1991.

  • Deposit

    SULPHUR REVIEW, 1990, MP 4850, ENERGY, MINES AND RESOURCES

  • Deposit

    CANADA, 1990, TABLE 2.

General comments

Subject category Comment text
Deposit PLANT IS A SOUR NATURAL GAS REFINERY. PRODUCTS INCLUDE NATIVE (ELEMENTAL) SULFUR, SWEET SALES GAS, AND VARIOUS NATURAL GAS HYDROCARBON CONDENSATES.

Reporter information

Type Date Name Affiliation Comment
Reporter 04-SEP-96 Buckingham, David A. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.