DIMA

Producer in Katanga, Congo (Kinshasa) with commodities Copper, Cobalt
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Mineral occurrence model information
  8. Host and associated rocks
  9. Nearby scientific data
  10. Geologic structures
  11. Ore body information
  12. Economic information about the deposit and operations
  13. Mining district
  14. Mineral rights holdings
  15. Ownership information
  16. Production statistics
  17. Reserves and resources
  18. Workings at the site
  19. Links to other databases
  20. Bibliographic references
  21. General comments
  22. Reporter information

Geologic information

Identification information

Deposit ID 10256244
MRDS ID W029731
MAS/MILS ID 7660400001
Record type Site
Current site name DIMA
Alternate or previous names Dima, Dikuluwe/Mashamba Dima, Dikuluwe-Mashamba, Dikuluwe/Mashamba

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: 25.37523, -10.74116 (WGS84)
Location accuracy 1000(meters)
Relative position ABOUT 5 KM SOUTH WEST OF KAMOTO, NEAR KOLWEZI. (Coordinates are probably for Mashamba West pit (between Dikuluwe and Mashamba East).

Site location context

Political divisions (FIPS codes)

Katanga(province)

Congo (Kinshasa)(country)

Geographic areas

Country State
Congo (Kinshasa) Katanga

Comments on the location information

  • DIKULUWE OPEN PIT AND MASHAMBA OPEN PIT ARE LOCATED AT ONE ORE DEPOSIT. MASHAMBA AND DIKULUWE ARE LOCATED IN THE WESTERN PART OF THE KOLWEZI ZONE TO THE SOUTHWEST OF THE KAMOTO CONCENTRATOR. A FEW KILOMETERS SW OF KAMOTO MINE

Commodities

Commodity Importance
Copper Primary
Cobalt Critical Secondary

Materials information

Materials Type of material
Chalcocite Ore
Chrysocolla Ore
Covellite Ore
Cuprite Ore
Malachite Ore
Digenite Ore
Heterogenite Ore
Carrollite Ore

Analytical data

Result THE DIKULUWE-MASHAMBA DEPOSIT IS CHARACTERIZED BY ITS RELATIVELY LOW CONTENT OF OXIDIZED MINERALS. THESE ONLY ACCOUNT FOR 14 % OF THE ORE COMPARED TO 57 % FOR MIXED OXIDES-SULFIDES AND 29 % FOR SULFIDE MINERALS. 3.8 % COPPER AND 0.4 % COBALT.

Mineral occurrence model information

Model code 197
USGS model code 30b
Deposit model name Sediment-hosted Cu
Mark3 model number 63

Host and associated rocks

  • Host or associated Host
    Rock type Metamorphic Rock > Metasedimentary Rock > Quartzite
  • Host or associated Host
    Rock type Sedimentary Rock > Clastic Sedimentary Rock > Shale
  • Host or associated Host
    Rock type Sedimentary Rock > Carbonate > Dolomite

Nearby scientific data

Ore Body (1) 25.37523, -10.74116

Economic information

Geologic structures

Type of structure Regional
Structure name Copper Belt

Ore body information

  • Strike N90E
    Dip 70E
    Thickness 80M
    Length 1250M
    Width 35M
    Area 2000HA
    Depth to top 400M
    Field Value
    Type of Orebody #1 SEDIMENTARY
    Shape of Orebody #1 IRREGULAR
    Type of Orebody #2 OTHER
    Primary mode of Origin SEDIMENTATION
    Secondary mode of Origin METAMORPHISM
    Primary Ore Control FAULTING
    Secondary Ore Control FOLDING
    Degree of Wallrock Alter. SLIGHT
    Type of Wallrock Alter. #1 DOLOMITIZATION
    Type of Wallrock Alter. #2 SERICITIC
    Strike And Dip N90E:70E
    Total Surface Area (HA) 2000
    Date of Last Modification 830712

Comments on the geologic information

  • OTHER MINERALS INCLUDE HETEROGENITE AND SPHAEROCOBALTITE.
  • THE MASHAMBA ANTICLINE AND THE EXTRUDED DIKULUWE BODY ARE CONNECTED BY A DEEP SYNCLINE.
  • IN THE SOUTHWESTERN SECTION THE TWO OREBODIES ARE PURELY COPPER BEARING. THE COBALT CONTENT INCREASES AND THE COPPER CONTENT DIMINISHES IN A NORTH-EASTERLY DIRECTION. THE ORE IS QUITE COMPLEX IN NATURE. BUT IS OF A VERY HIGH GRADE BY MODERN COPPER MINING STANDARDS.

Economic information about the deposit and operations

Operation type Surface
Development status Producer
Commodity type Metallic
Significant Yes
Discovery year 1921
Mining method Open Pit
Year of first production 1975
Milling method Flotation

Mining district

District name Kolwezi District

Mineral rights holdings

Type of mineral rights Unknown

Ownership information

  • Type Owner-Operator
    Owner La Generale Des Carrieres Et Mines Du Zaire (State Owned) (Gecamines)
    Interest 100
    Home office Zaire
    Year 1990

Production statistics

  • Year 1975
    Description Copper Output- Conc. Out 35% Cu, .64% Co 66000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Minor Conc. Cobalt Cobalt 1wt-pct
    Major Conc. Copper Copper 35wt-pct
  • Year 1976
    Description Ore Input Is 3.82% Cu, .18% Co 141000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Minor Ore Cobalt Cobalt 0wt-pct
    Major Ore Copper Copper 4wt-pct
  • Year 1977
    Description Production Of Ore 259000 Mt Ore/Yr
  • Year 1978
    Description Production Of Ore 300000 Mt Ore/Yr
  • Year 1979
    Description Production Of Ore 350000 Mt Ore/Yr
  • Year 1980
    Description Production Of Ore 1000000 Mt Ore/Yr
  • Year 2006
    Period 1985-1988
    Material MAshamba East: 9,794,880 mt @ 4.96% cu and 0.35% Co. (Jobin-Bevans, 2006, p. 38).
    Ore mined 9794880mt
    Accuracy Accurate
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Secondary Cobalt Cobalt 0wt-pct
    Primary Copper Copper 5wt-pct
  • Year 2006
    Period 1978-1995
    Material Mashamba West:\n21,816,840 mt ore @ 4.35% cu and 0.14% Co. (Jobin-Bevans, 2006, p. 39).
    Ore mined 21816840mt
    Accuracy Accurate
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Secondary Cobalt Cobalt 0wt-pct
    Primary Copper Copper 4wt-pct
  • Year 2006
    Period 1975-1993
    Material 26,062,244 metric tons ore mined at Dikuluwe from 1975-1993. (Jobin-Bevans and others, 2006, p. 39)
    Ore mined 26062244mt
    Accuracy Accurate
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Secondary Cobalt Cobalt 0wt-pct
    Primary Copper Copper 5wt-pct

Comments on the production information

  • SCHEDULED CAPACITY UP TO A MINING RATE OF 1.01 MILLION TPY BY THE END OF 1975; SCHEDULED CAPACITY ABOUT 3 MILLION TONNES PER YEAR (from deelted record W029731 = 10079668).
  • THE DIMA CONCENTRATOR IS DIVIDED INTO TWO SECTIONS. DIMA 1 FOR MIXED ORES AND DIMA 2 FOR OXIDES DURING THE FIRST YEARS OF OPERATION.

Reserves and resources

  • Type In-situ
    Name Indicated at Mashamba East
    Estimate year 2009
    Indicated 75000000mt
    Remarks 75Mt @ 1.85 Cu and 0.38% Co (Dixon and others, 2009, p. 14, 111)
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.38 wt-pct Cobalt Secondary 2009
    Copper 1.8 wt-pct Copper Primary 2009
  • Type In-situ
    Name inferred at Mashamba East
    Estimate year 2009
    Inferred 65300000mt
    Remarks 65.3Mt @ 0.76% Cu and 0.1% Co. inferred resource at Mashamba East (Dixon and others, 2009, p. 14, 111).
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.1 wt-pct Cobalt Secondary 2009
    Copper 0.76 wt-pct Copper Primary 2009
  • Type In-situ
    Name measured resource at Mashamba West
    Estimate year 2007
    Measured 13600000mt
    Remarks Measured resource at mashamba West 13.6Mt @ 2.97% Cu and 0.18% Co (Dixon and others, 2009, p. 113).
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.18 wt-pct Cobalt Secondary 2007
    Copper 2.97 wt-pct Copper Primary 2007
  • Type In-situ
    Name indicated at Mashamba West
    Estimate year 2007
    Indicated 3100000mt
    Remarks indicated at Mashamba West 3.1Mt @ 2.87 cu and 0.13% Co (Dixon and others, 2009, p. 113)
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.13 wt-pct Cobalt Secondary 2007
    Copper 2.87 wt-pct Copper Primary 2007
  • Type In-situ
    Name measured at Dikuluwe
    Estimate year 2007
    Measured 24100000mt
    Remarks Measured at Dikuluwe 24.1 Mt @ 3.89% cu and 0.1% Co (Dixon and others, 2009, p. 113).
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.1 wt-pct Cobalt Secondary 2007
    Copper 3.89 wt-pct Copper Primary 2007
  • Type In-situ
    Name indicated at Dikuluwe
    Estimate year 2007
    Indicated 8800000mt
    Remarks indicated at dikuluwe 8.8 Mt @ 4.19% cu and 0.09% Co (Dixon and others, 2009, p. 113).
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.09 wt-pct Cobalt Secondary 2007
    Copper 4.19 wt-pct Copper Primary 2007
  • Type In-situ
    Name inferred at Dikuluwe
    Estimate year 2007
    Inferred 32900000mt
    Remarks inferred at Dikuluwe 32.9 Mt @ 3.97% cu and 0.09% co (Dixon and others, 2009, p. 113)
    Commodity Subtype Grade units Group Importance Year
    Cobalt 0.09 wt-pct Cobalt Secondary 2007
    Copper 3.97 wt-pct Copper Primary 2007
  • Type In-situ
    Estimate year 1975
    Total resources 3000000mt ore
    Commodity Subtype Grade units Group Importance Year
    Copper Cu 7 wt-pct Copper Primary 1975
  • Type In-situ
    Estimate year 1975
    Total resources 28000000mt ore
    Commodity Subtype Grade units Group Importance Year
    Cobalt cobalt 1 wt-pct Cobalt Secondary 1975
    Copper copper 5 wt-pct Copper Primary 1975

Comments on the reserve resource information

  • JAN.1,1980 RESERVES CONTAINED IN THE FOLLOWING DEPOSITS: DIKULWE- 76600000MT 4.0%CU,0.11%CO MASHAMBA WEST- 53400000MT 3.6%CU,0.1%CO MASHAMBA EAST- 29100000MT 3.7%CU,0.77%CO JUNCTION DIMA- 11200000MT 3.1%CU,0.2%CO DIMA BASIN- 30000000MT 4.1%CU COMBINED IN WESTERN DIVISION - SEQ # 7660400030
  • M9C4=M1C3+M2C3+M3C3. MATRIX 1 COLUMN 3 REPRESENTS RESOURCE TONNAGE OF COPPER OXIDES. MATRIX 2 COLUMN 3 REPRESENTS RESOURCE TONNAGE OF MIXED COPPER OXIDES AND COPPER SULFIDES. MATRIX 3 COLUMN 3 REPRESENTS RESOURCE TONNAGE OF COPPER SULFIDES MATRIX 9 COLUMN 4 REPRESENTS TOTAL COPPER ORE RESOURCE.
  • H1) RESERVES NEAR SURFACE MATERIAL GRADING AT LEAST 7 % CU, SOME AREAS UP TO 12 % CU IN MALACHITE CONCENTRATIONS. H2) OXIDE AND MIXED ORE
  • FIGURE REPRESENTS ORE RESERVES AT DIKULUWE AND MASHAMBA; 28,000,000 MET TONNES OF RESERVES ARE IN DIKULUWE PIT. DIKULUWE ORES NEAR THE SURFACE GRADE AT LEAST 7% CU.

Workings at the site

  • Type of workings Surface
    Area 2000HA
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ACTUAL
    Mining Method BENCH (BERM)
    Percent Waste Rock 75
    Avg. Bench Height (meters) 10
    Max. Pit Slope (degrees) 35
    Capacity 3226
    Capacity Units MT ORE/DAY
    Unit Production Cost 6.93
    Units of Production $/MT ORE
    Operating Days per Year 310
    Operating Shifts per Day 3
    Year of Information 1981
  • Type of workings Surface
    Area 2000HA
    Field Value
    MAS Development Schedule # 1
    Mining Record # 2
    Status of Mining Method ACTUAL
    Mining Method BENCH (BERM)
    Percent Waste Rock 75
    Avg. Bench Height (meters) 10
    Max. Pit Slope (degrees) 35
    Capacity 6452
    Capacity Units MT ORE/DAY
    Unit Production Cost 6.93
    Units of Production $/MT ORE
    Operating Days per Year 310
    Operating Shifts per Day 3
    Year of Information 1981
  • Type of workings Surface
    Area 2000HA
    Field Value
    MAS Development Schedule # 1
    Mining Record # 3
    Status of Mining Method ACTUAL
    Mining Method BENCH (BERM)
    Percent Waste Rock 75
    Avg. Bench Height (meters) 10
    Max. Pit Slope (degrees) 35
    Capacity 12903
    Capacity Units MT ORE/DAY
    Unit Production Cost 6.93
    Units of Production $/MT ORE
    Operating Days per Year 310
    Operating Shifts per Day 3
    Year of Information 1981

Comments on other economic factors

  • TWO OPEN PIT MINES-DIKULUWE AND MASHAMBA ARE OPERATED IN CONJUNCTION WITH ONE ANOTHER.

Reference information

Bibliographic references

General comments

Subject category Comment text
Deposit OUTCROP OF OREBODY STRIKES NORTH-SOUTH AND DIPS ABOUT 45 DEGREES TO THE EAST.
Deposit THE NEW DIMA FLOTATION CONCENTRATOR IS A CENTRAL FIGURES OF GECAMINES SECOND FIVE-YEAR DEVELOPMENT PLAN (1975 TO 1979) ; TOTAL$: 435 ; ECON.COM: DEVELOPMENT OF TWO OPEN PITS, CONSTRUCTION OF A FLASH SMELTER AND ELECTROLYTIC REFINERY (TO BE ON STREAM BY 1977).

Reporter information

Type Date Name Affiliation Comment
Reporter 05-APR-95 Porter, Kenneth E. U.S. Bureau of Mines
Reporter 01-JAN-78 Saam, Henning G. U.S. Geological Survey W029732, Dikuluwe. = newMRDS 10079669.
W029731, Mashamba =newMRDS 10079668.
Reporter 01-DEC-87 Orris, Greta J. U.S. Geological Survey W029732, Dikuluwe. = newMRDS 10079669
Editor 17-FEB-10 Wilson, Anna B. U.S. Geological Survey merged and deleted W029732 (Dikuluwe) = newMRDS 10079669. merged and deleted W029731 (Mashamba) =newMRDS 10079668.
Updater 01-JAN-88 Orris, Greta J. U.S. Geological Survey Revised former record W029731 (newMRDS 10079668).

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.