Guanaco

Plant in Antofagasta, Chile with commodity Gold
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Ownership information
  11. Production statistics
  12. Workings at the site
  13. Links to other databases
  14. Bibliographic references
  15. General comments
  16. Reporter information

Geologic information

Identification information

Deposit ID 10279810
MAS/MILS ID 3370050021
Record type Site
Current site name Guanaco

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: -69.52782, -25.1142 (WGS84)
Location accuracy 500(meters)

Site location context

Political divisions (FIPS codes)

Antofagasta(province)

Chile(country)

South America(continent)

Land(continent)

Geographic areas

Country State
Chile Antofagasta

Commodities

Commodity Importance
Gold Primary

Materials information

Materials Type of material
Gold Unknown
Silver Unknown

Nearby scientific data

Ore Body (1) -69.52782, -25.1142

Economic information

Ore body information

  • Area 10118HA
    Field Value
    MAS Matrix # 1
    MAS Column # 1
    Type of Orebody #1 DISSEMINATED
    Shape of Orebody #1 UNKNOWN
    Primary mode of Origin UNKNOWN
    Primary Ore Control FAULTING
    Type of Wallrock Alter. #1 UNKNOWN
    Total Surface Area (HA) 10118
    Date of Last Modification 940224

Economic information about the deposit and operations

Operation type Leach
Development status Plant
Commodity type Metallic
Significant Yes
Discovery year 1991
Mining method Open Pit
Year of first production 1992
Plant type Leach
Milling method Leach-Precipitation

Ownership information

  • Type Owner-Operator
    Owner Sociedad Contractual Minera Guanaco
    Interest 100
    Home office Chile
    Year 1992
    Last year 1992
  • Type Owner-Operator
    Owner Amax Gold, Inc.
    Interest 90
    Home office Colorado
    Year 1992
    First year 1992

Production statistics

  • Year 1991
    Description Design Production Rate 50000 St Ore/Month
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Gold Gold 55115.55mt
  • Year 1991
    Description Design Production Rate 15000 Oz Au/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 466552.21g
  • Year 1992
    Description Production Rate 10000 Oz Au/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 311034.81g
  • Year 1993
    Accuracy Estimate
    Description Estimated Production 1993-1997 2000000 Mtpy Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Gold Gold 2000000mt
  • Year 1993
    Description Expected Production Rate 45000 Oz Au/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 1399656.64g
  • Year 1993
    Description Design Production Rate 70000 Oz Au/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 2177243.67g
  • Year 1993
    Description Design Production Rate 2200000 Stpy Ore
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Gold Gold 2425084.2mt

Workings at the site

  • Type of workings Surface
    Area 10118HA
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ACTUAL
    Mining Method OPEN PIT
    Percent Waste Rock .7
    Capacity 9041
    Capacity Units MT ORE/DAY
    Unit Production Cost 2.26
    Units of Production $/MT ORE
    Operating Days per Year 365
    Operating Shifts per Day 2
    Year of Information 1992

Reference information

Bibliographic references

  • Production

    *SKILLING'S MINING REVIEW, APR. 10, 1993, P. 11.

  • Deposit

    *AMAX GOLD NEWS RELEASE, APR. 6, 1992

  • Deposit

    *PANAFAX, UF-400, 02/23/93.

  • Deposit

    ROCKY MOUNTAIN PAY DIRT, "LOWER ORE GRADES, STARTUP, WRITE-

  • Deposit

    DOWN CAUSE AMAX GOLD LOSS", NOV. 1993, N0. 170, P. 15A.

  • Deposit

    ENGINEERING AND MINING JOURNAL MINING ACTITVITY DIGEST,

  • Deposit

    "AMAX'S NEW PLANT COMPLETED", MAY 1993, VOL.21,NO.5, P.10.

General comments

Subject category Comment text
Deposit START-UP SLOWER THAN EXPECTED DUE TO LOWER THAN PLANNED CRUSHER AVAILABILITY, AND A LONGER THAN EXPECTED LEAD TIME IN SETTING GRADE CONTROL PROCEDURES. MERRIL CROWE PROCESSING PLANT COMPLETED IN MARCH, 1993. SPRAYING OF HEAP-LEACH PADS BEGAN IN FEBUARY, 1993. PRODUCTION SCHEDULED FOR LATE APRIL AT AN ANNUAL RATE OF 60,000 TO 80,000 OUNCES.

Reporter information

Type Date Name Affiliation Comment
Reporter 28-JUL-94 Peterson, Gary R. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.