| Deposit ID | 10279886 |
|---|---|
| MAS/MILS ID | 2010410001 |
| Record type | Site |
| Current site name | La Negra |
| Alternate or previous names | La Negra Unidad |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -99.50033, 20.85056 (WGS84) |
| Elevation | 2200 |
Political divisions (FIPS codes)
Pima(county)
Arizona(state)
United States(country)
North America(continent)
Land(continent)
| Country |
|---|
| Mexico |
| Commodity | Importance |
|---|---|
| Copper | Primary |
| Lead | Primary |
| Silver | Primary |
| Zinc Critical | Primary |
| Materials | Type of material |
|---|---|
| Arsenopyrite | Unknown |
| Calcite | Unknown |
| Chalcopyrite | Unknown |
| Galena | Unknown |
| Garnet | Unknown |
| Pyrite | Unknown |
| Pyrrhotite | Unknown |
| Quartz | Unknown |
| Silver | Unknown |
| Ore Body (1) | -99.50033, 20.85056 |
|---|
| Strike | N30W | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 60W | ||||||||||||||||||||||||||||
| Thickness | 8M | ||||||||||||||||||||||||||||
| Length | 1500M | ||||||||||||||||||||||||||||
| Width | 300M | ||||||||||||||||||||||||||||
| Depth to top | 0M | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1550 |
| Mining method | Open Stope - Sublevel |
| Year of first production | 1965 |
| Milling method | Flotation |
| District name | La Negra District |
|---|
| Type of mineral rights | Located Claim |
|---|---|
| Type of mineral rights | Patented |
| Ownership category | Private |
|---|
| Type | Owner |
|---|---|
| Owner | Industrias Penoles S. A. De C. V. (Grupo Penoles) |
| Interest | 100 |
| Home office | Mexico |
| Year | 1989 |
| Type | Operator |
|---|---|
| Owner | Cia Mintra La Negra And Angxas |
| Home office | Mexico |
| Year | 1992 |
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1976 | |||||||||||||||||||||||||||||||||||
| Measured | 1814000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 1814000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 1814000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1993 | ||||||||||||||
| Demonstrated | 1260000mt ore | ||||||||||||||
| Total resources | 1260000mt ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overall depth | 300M | ||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 2010410001 |
AME MINERAL ECONOMICS QUARTERLY MINE ANALYSIS, JUNE, 1993,
P. 49.
CONSESO DE RECURSOS NATURALES NO RENOVABLES. ING.G.P.SALAS.Y
PRIVATE REPORT
DESCRIPCION DE LA PLANTA DE BENEFICIO. COMPANIA MINERA LA NE
ANEXAS, ING VLISIS MONTED 1972
GEOLOGIA DEL DEPOSITO MINERAL DE LA NEGRA. ING.JOSE E. GAYTA
DESCRIPCION DEL SISTEMA DE MINADO,UNIDAD LA NEGRA.ING J.CARD
EMJ 1975 INTERNATIONAL DIRECTORY OF MINING
BULL. NO. M4-B145,DENVER EQPT. DIV.,JOY MANUFACTURING CO.
| Subject category | Comment text |
|---|---|
| Deposit | AUG76-RCO 040- LOCATED 377 KM FROM MEXICO D.F. 346 K FROM MEXICO DF. TO JALPAN AND 31 KM DIRT CURVY ROAD TO TH AUG76-RCO 070- SILVER IS MINERALIZED AS A HESSITE(AG2TE) AUG76-RCO 071- SILVER AS HESSITE;AG2TE AUG76-RCO 151-150 TPH CRUSHING PLANT FACILITY. MILL PLANT PR ONLY 500 MITDIC TONS PER DAY AUG76-RCO 151- TOTAL PRODUCTION COST= $29.55, BREAKEVEN COST CU= $0.157.(OPER.COST=$21.99, SMELTING & OTHERS=$0.491, G ADMIN.$1.14 PER TON OF ORE MILLED. AUG76-RCO 151- DOES CUSTOM MILLING, BUYS ORE. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 04-AUG-1994 | Difrancesco, Carl A. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.