| Deposit ID | 10303661 |
|---|---|
| MAS/MILS ID | 1220500042 |
| Record type | Site |
| Current site name | Louvicourt |
| Alternate or previous names | Louvem Mine, Louvem |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -77.51634, 48.09829 (WGS84) |
| Elevation | 340 |
| Location accuracy | 1000(meters) |
Political divisions (FIPS codes)
Alaska(state)
United States(country)
North America(continent)
Land(continent)
| Country | State |
|---|---|
| Canada | Quebec |
| Commodity | Importance |
|---|---|
| Copper | Primary |
| Gold | Secondary |
| Silver | Secondary |
| Zinc Critical | Primary |
| Ore Body (1) | -77.51634, 48.09829 |
|---|
| Operation type | Underground |
|---|---|
| Development status | Plant |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1988 |
| Mining method | Open Stope - Sublevel |
| Year of first production | 1994 |
| Plant type | Smelter |
| Plant subcategory | Flotation |
| Milling method | Flotation |
| Type of mineral rights | Unknown |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | Aur Resources Inc. |
| Interest | 30 |
| Home office | Canada |
| Year | 1995 |
| Type | Owner |
|---|---|
| Owner | Novicourt Inc. |
| Interest | 45 |
| Home office | Canada |
| Year | 1995 |
| Type | Owner |
|---|---|
| Owner | Teck Corp. |
| Interest | 25 |
| Home office | Canada |
| Year | 1995 |
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1996 | |||||||||||||||||||||||||||||||||||
| Indicated | 22860000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 12500000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 12500000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1989 | |||||||||||||||||||||||||||||||||||
| Indicated | 16000000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 16000000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 16000000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1989 | |||||||||||||||||||||||||||||||||||
| Indicated | 8000000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 8000000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 8000000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1992 | |||||||||||||||||||||||||||||||||||
| Indicated | 22800000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 22800000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 22800000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1994 | |||||||||||||||||||||||||||||||||||
| Indicated | 24000000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 24000000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 24000000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1991 | |||||||||||||||||||||||||||||||||||
| Indicated | 33600000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 33600000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 33600000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1995 | |||||||||||||||||||||||||||||||||||
| Demonstrated | 13862000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 13862000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1994 | |||||||||||||||||||||||||||||||||||
| Indicated | 15700000mt ore | |||||||||||||||||||||||||||||||||||
| Demonstrated | 15700000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 15700000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1995 | |||||||||||||||||||||||||||||||||||
| Demonstrated | 13862000mt ore | |||||||||||||||||||||||||||||||||||
| Total resources | 13862000mt ore | |||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overall depth | 310M | ||||||||||||||||
| |||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 1220500042 |
*CRU METAL MONITOR, ZINC, FEB. 1992, P. 8.
THE NORTHER MINER, MAY 3, 1993.
NORTHERN MINER, AUR DOWNGRADES RESERVES AT LOUVICOURT
SIGNIFICANTLY, 4/25/94, P.1,2.
MINING JOURNAL, 4/22/94, P.289.
THE LOUVICOURT CU-ZN-AG-AU VOLCANOGENIC MASSSIVE SULPHIDE
DEPOSIT, BUBAR, GILL, MANNARD, STOCKFORD, SME
PUBLICATION. PREPRINT 91-140, FEB. 25-28, 1991.
CANADIAN MINING JOURNAL, AUGUST, 1992, P.19-21.
MINING MAGAZINE, JANUARY, 1994, P. 29
NORTHERN MINER, NOVEMBER 5, 1990, P. 11
CRANSTONE, D.A. AND R.T. WHILLANS,CANADIAN RESERVES OF
COPPER, NICKEL, LEAD, ZINC, MOLYBDENUM, SILVER AND GOLD
AS OF JAN.1,1978, EMR CANADA, MINERALS, MR185,1979,
P. 11.
NORTHERN MINER, APRIL 5, 1993, P. 15.
NORTHERN MINER, OCTOBER 29, 1990, P. 119.
MINING JOURNAL, SEPTEMBER 8, 1989, P. 185.
MINING JOURNAL, NOVEMBER 1, 1991, P. 329.
CANADIAN MINES HANDBOOK,1992-1993,P-51.
TECK CORP., 1993 ANNUAL REPORT, P.16.
NORANDA INC., 1994 ANNUAL REPORT, P.38.
TECK CORP., 1996 ANNUAL REPORT, P. 19.
AUR RESOURCES INC., 1990 ANNUAL REPORT, P.6.
TECK CORP., COMPANY BROCHURE- MINING FOR THE FUTURE, VOL.II
AUR RESOURCES INC. HIGH GRADE COPPER-ZINC-GOLD VALUES
OBTAINED IN HOLE 309-44 ON THE NEWLY DISCOVERED BASE
METAL DEPOSITE AT VAL D'OR, QUEBEC, GILL AND STOCKFORD,
JUNE 16, 1989.
AUR RESOURCES INC. RECENT DRILL RESULTS EXPAND THE NEWLY
DISCOVERED COPPER-ZINC-GOLD DEPOSIT AT VAL D'OR, QUEBEC
GILL AND STOCKFORD, JULY 11, 1989
AUR RESOURCES INC. HOLE 30949 RESULTS SHOW ORE GRADES AND
IDENTIFY A NEW SULPHIDE ZONE SOUTH OF ALL PREVIOUSLY
IDENTIFIED ZONES. GILL AND STOCKFORD, JULY 24, 1989.
AUR RESOURCES INC. NEW DRILL RESULTS SIGNIFICANTLY EXPAND
THE SIZE OF THE RECENTLY DISCOVERED COPPER-ZINC DEPOSIT
AT VAL D'OR, QUEBEC. AUGUST 14, 1989.
AUR RESOURCES INC. ANNOUNCES PRELIMINARY GEOLOGICAL RESERVES
ON THE VAL D'OR COPPER-ZINC-GOLD DISCOVERY AND FURTHER
ASSAY RESULTS, STOCKFORD AND MCCARTER, AUGUST 23, 1989.
AUR RESOURCES INC. NEW, HIGH GRADE RESULTS SIGNIFICANTLY
EXPAND THE TONNAGE POTENTIAL OF THE LOUVICOURT COPPER-
ZINC-GOLD DEPOSIT AT VAL D'OR, QUEBEC, SEPT. 20, 1989.
AUR INTERSECTS THE HIGHEST GRADE AND THICKEST COPPER
MINERALIZATION IN THE DEEPEST HOLE DRILLED TO DATE ON
THE LOUVICOURT COPPER-ZINC-SILVER-GOLD DEPOSIT AT
VAL D'OR, QUEBEC, NOVEMBER 8, 1989.
RECENT DRILL RESULTS AT LOUVICOURT DISCOVERY INCONCLUSIVE
DEPOSIT STILL OPEN TO DEPTH. GILL AND MCCARTER,
FEBRUARY 23, 1990.
ENGINEERING AND MINING JOURNAL, 8/89, P.6.
SKILLINGS, JULY 1, 1989, P. 6.
MINING JOURNAL, AUGUST 4, 1989, P. 84.
ENGINEERING AND MINING JOURNAL, 10/89, P.9.
ENGINEERING AND MINING JOURNAL, 11/89, P.91.
SKILLINGS, OCTOBER 14, 1989, P. 20.
WSU, MARCH 29, 1990, P. B7.
MIN. ACT. DIG., VOL 17 N6, JUNE 29, 1990, P. 8 & 9.
MINING JOURNAL, AUGUST 10, 1990, P. 116.
ENGINEERING AND MINING JOURNAL, 9/90, P.107.
ENGINEERING AND MINING JOURNAL, 6/90, P.56,57,59.
NORTHERN MINER, JULY 9, 1990, P. 1&2.
MINING JOURNAL, DECEMBER 7, 1990, P. 425.
NORTHERN MINER, OCTOBER 8, 1990, P. 1,19.
ENGINEERING AND MINING JOURNAL, 4/90, P.7.
METALS WEEK, 9/17/90, P.6.
NORTHERN MINER, DECEMBER 10, 1990, P. 1,2.
NORTHERN MINER, MARCH 4, 1991, P. 1,2.
LA SOCIETE MINIERE LOUVEM INC. LOUVEM MINES INC. FIRST
QUARTER INTERIM REPORT, MARCH 31, 1991.
NORTHERN MINER, APRIL 8, 1991, P. 3.
SKILLINGS, MARCH 16, 1991, P.17.
NORTHERN MINER, JUNE 17, 1991, P. 1,2.
NORTHERN MINER, SEPTEMBER, 17, 1990, P. 1,19.
MINING JOURNAL, NOVEMBER, 1991, P. 329.
NORTHERN MINER, OCTOBER 28, 1991, P. 1,2.
AMERICAN METAL MARKET, 1/15/92, P.16.
NORTHERN MINER, APRIL 16, 1992, P. 13.
NORTHERN MINER, MAY 11, 1992, P. 6.
MINING JOURNAL, APRIL 1992, P. 37.
ENGINEERING AND MINING JOURNAL, 5/92, P.9.
NORHTERN MINER, MARCH 30, 1992, P. 1,2,3.
MINING JOURNAL, MARCH 13, 1992, P. 180.
SKILLINGS, MARCH 28, 1992, P. 8.
NORTHERN MINER, OCTOBER 26, 1992, P. 2.
NORTHERN MINER, JULY 13, 1993, P. 2.
NORTHERN MINER, NOVEMBER 2, 1992, P. 1.
NORTHERN MINER, DECEMBER 7, 1992, P. 15.
NORTHERN MINER, NOVEMBER 1, 1990, P. 11.
LOUVEM MINES INC., ANNUAL AND SPECIAL MEETING, 10/20/92, P.
NORANDA INC., 1993 ANNUAL REPORT, P.19.
NORTHERN MINER, SUMMER STARTUP PLANNED FOR LOUVICOURT
DEPOSIT, 3/7/94, P.B8.
ROBERTSON, DAVID, TECK AIMS TO BOOST RESERVE, NORTHERN MINER
5/9/94, P.1,10.
CHRISTIE, BRIAN, LOUVICOURT ON-LINE FOR 1994 PRODUCTION,
NORTHERN MINER, 11/29/93, P.11,21.
METAL BULLETIN MONTHLY, LOUVICOURT ENTERS PRODUCTION, 7/94,
P.91.
MINING RECORD, V 106/N 14, 4/5/95, P.3.
| Subject category | Comment text |
|---|---|
| Deposit | THE ESTIMATED COST TO BRING THE MINE INTO PRODUCTION IS C$326M (US$278M). SHAFT SINKING IS SCHEDULED TO COMMENCE IN LATE FEB. AND COMMERCIAL PRODUCTION IS EXPECTED TO BEGIN THE FIRST QUARTER OF 1995. AT FULL CAPACITY THE MINE WILL PRODUCE ABOUT 29,000 TPY OF ZINC CONC. 1-94: THE DEVELOPMENT OF THE MINE AND MILL IS PROCEEDING OTHER OPEN STOPE METHODS INCLUDES TRANSVERSE OPEN-STOPING. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 18-JUL-97 | Porter, Kenneth E. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.