| Deposit ID | 10304040 |
|---|---|
| MAS/MILS ID | 5570050048 |
| Record type | Site |
| Current site name | Southern Malayan Tin Dredging |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 101.09979, 4.30116 (WGS84) |
Political divisions (FIPS codes)
Malaysia(country)
Asia(continent)
Land(continent)
| Country |
|---|
| Malaysia |
| Commodity | Importance |
|---|---|
| Tin Critical | Primary |
| Ore Body (1) | 101.09979, 4.30116 |
|---|
| Thickness | 22M | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||
| Operation type | Surface |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Mining method | Dredging |
| Milling method | Gravity |
| Type | Owner |
|---|---|
| Owner | Malaysia Mining Corp. Bhd. |
| Interest | 100 |
| Year | 1983 |
| Type | Operator |
|---|---|
| Owner | Pernas Charter Management |
| Year | 1983 |
| Type of workings | Surface | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 1997HA | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 5570050048 |
MALAYSIA MINING CORPORATION ANNUAL REPORTS 1979-1982.
WORLD MINES REGISTER 1979-1980.
MINING ANNUAL REVIEW, 1969-1972, 1974-1980.
INTERNATIONAL MINING YEARBOOKS 1967, 1968, 1977, 1978, 1980,
1981, 1982.
GOVETT & ROBINSON, THE WORLD TIN INDUSTRY, 1980.
SOUTHERN MALAYAN TIN DREDING (M) BHD, ANNUAL REPORTS, 1978,
1979.
| Subject category | Comment text |
|---|---|
| Deposit | A $148.34 SMELTING COST IS INCURRED ALONG WITH A $0.10 MILLING COST PER TONNE IN THE PRODUCTION OF PRODUCT A. |
| Deposit | TWO SECTIONS ARE BEING MINED SIMULTANEOUSLY; TANJONG TUALANG, WITH RESERVES OF 74,475,000 TONNES COVERING AN AREA OF 973 HECTARES AND DEGONG ROAD WITH RESERVES OF 97,513,000 TONNES COVERING AN AREA OF 1,024 HECTARES. STRIPPING IS NOT REQUIRED AT THE TANJONG TUALANG AREA AS IT HAS BEEN PREVIOUSLY DREDGED. STRIPPING OF THE DECOMPOSED VEGETATION AND BARREN OVERBURDEN, 6 METERS, IS REQUIRED AT THE DEGONG ROAD SECTION. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 22-SEP-1992 | Sabin, A. E. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.