Stari Trg

Producer in Serbia with commodities Lead, Zinc
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Mineral rights holdings
  11. Ownership information
  12. Production statistics
  13. Reserves and resources
  14. Links to other databases
  15. Bibliographic references
  16. Reporter information

Geologic information

Identification information

Deposit ID 10304138
MAS/MILS ID 4790000001
Record type Site
Current site name Stari Trg
Alternate or previous names Rmhk Trepca.

Geographic coordinates

Point of reference Town
Geographic coordinates: 20.83517, 42.91542 (WGS84)
Location accuracy 10000(meters)

Site location context

Political divisions (FIPS codes)

Serbia(country)

Geographic areas

Country
Serbia

Commodities

Commodity Importance
Lead Secondary
Zinc Critical Primary

Materials information

Materials Type of material
Galena Unknown
Pyrite Unknown
Pyrrhotite Unknown
Sphalerite Unknown

Nearby scientific data

Town (1) 20.83517, 42.91542

Economic information

Ore body information

  • Field Value
    MAS Matrix # 1
    MAS Column # 1
    Type of Orebody #1 REPLACEMENT
    Shape of Orebody #1 IRREGULAR
    Primary mode of Origin HYDROTHERMAL
    Date of Last Modification 921105

Comments on the geologic information

  • OREBODIES OCCUR BOTH AS A SKARN TYPE AND AS A HYDROTHERMAL REPLACEMENT OREBODY, BOTH HOSTED ENTIRELY BY LIMESTONE. THE ZIGACA OREBODY, WHICH IS ABOUT 3 KILOMETERS FROM THE STARI TRG MINE, MAY BE DEVELOPED AS PART OF THIS FACILITY.

Economic information about the deposit and operations

Operation type Underground
Development status Producer
Commodity type Metallic
Significant Yes
Year of first production 1930

Mineral rights holdings

Type of mineral rights Unknown

Ownership information

  • Type Owner
    Owner Government Of Yugoslavia
    Interest 100
    Home office Yugoslavia
    Year 1989
  • Type Operator
    Owner Rmhk - Trepca
    Home office Yugoslavia
    Year 1989

Production statistics

  • Year 1989
    Accuracy Estimate
    Description Ore Throughput (Estimated) 600000 Metric Tons Of Ore.
  • Year 1990
    Accuracy Estimate
    Description Zinc Conc. Prod. @ 55% Zinc (Estimated) 20000 Metric Tons Of Ore.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Conc. Zinc Zinc 20000mt 55wt-pct
  • Year 1990
    Accuracy Estimate
    Description Lead Conc. Prod. @ 72% Lead (Estimated) 20000 Metric Tons Of Ore.
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Minor Conc. Lead Lead 20000mt 72wt-pct
  • Year 1990
    Accuracy Estimate
    Description Ore Throughput (Estimated) 600000 Metric Tons Of Ore.

Reserves and resources

  • Type In-situ
    Estimate year 1989
    Inferred 12000000mt ore
    Total resources 12000000mt ore
    Commodity Subtype Grade units Group Importance Year
    Zinc Zn 2.5 wt-pct Zinc Major 1989
    Lead Pb 2.5 wt-pct Lead Minor 1989

Comments on the reserve resource information

  • THE STATED RESERVES OF 12,000,000 FOR THIS MINE ARE FOR 20 YEARS OF PRODUCTION AT A 75 PERCENT CONFIDENCE LEVEL.

Comments on other economic factors

  • AS OF THE TIME OF THIS REPORT, THIS UNDERGROUND MINE OPERATES WITH A DAILY CAPACITY OF PRODUCING 2,400 METRIC TONS OF ORE, PROVIDED THAT THE MINE OPERATES 250 DAYS PER YEAR AND WORKS 3 SHIFTS PER DAY. THIS DATA IS FOR THE YEAR 1989. THE OREBODY HAS BEEN DRILLED TO A DEPTH OF 1,300 METERS, AND MINERALIZATION IS BELIEVED TO EXTEND BEYOND THIS DEPTH. THE MINE EQUIPMENT IS OLD AND POORLY MAINTAINED.
  • LEAD CONCENTRATE ASSAYS 72 PERCENT AND ZINC CONCENTRATE ASSAYS 55 PERCENT. THE MILL HAS A CAPACITY OF ONE MILLION METRIC TONS PER YEAR, BUT HAS NEVER BEEN UTILIZED. AS OF THE TIME OF THIS REPORT, THE CAPACITY OF THE MILL WAS PRODUCING 20,000 METRIC TONS OF LEAD CONCENTRATE GRADING 72 PERCENT LEAD PER YEAR AND 20,000 METRIC TONS OF ZINC CONCENTRATE GRADING 55 PERCENT ZINC PER YEAR. THESE CAPACITY MEASURMENTS ARE ACCOMPANIED BY THE ASSUMPTION THAT THE MILL OPERATES 300 DAYS PER YEAR AND WORKS 3 SHIFTS PER DAY. THE MILL EQUIPMENT IS COMPOSED OF BRITISH AND RUSSIAN ORIGIN. THIS DATA IS CURRENT AS OF THE YEAR 1989. FEED GRADES ASSAY 2.5 PERCENT LEAD AND 2.5 PERCENT ZINC.
  • THE MINE AND MILL FACILITY HAS BEEN ADVERSLY AFFECTED BY CIVIL UNREST OWING TO POLITICAL PROBLEMS AND DELAYED SALARY PAYMENTS.

Reference information

Bibliographic references

  • Deposit

    COMMODITIES RESEARCH UNIT LIMITED, LONDON, THE BASE

  • Deposit

    METAL INDUSTRIES OF EASTERN EUROPE, VOL. 3, PP. 171-72

  • Deposit

    (NOV. 1990).

Reporter information

Type Date Name Affiliation Comment
Reporter 30-JAN-95 Difrancesco, Carl A. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.