| Deposit ID | 10279669 |
|---|---|
| MAS/MILS ID | 3120000048 |
| Record type | Site |
| Current site name | Linden |
| Alternate or previous names | East Montgomery North, East Montgomery, Kara Kara, North Dorabece |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -58.74931, 5.96797 (WGS84) |
| Elevation | 48 |
| Location accuracy | 5000(meters) |
Political divisions (FIPS codes)
Guyana(country)
South America(continent)
Land(continent)
| Country |
|---|
| Guyana |
| Commodity | Importance |
|---|---|
| Aluminum Critical | Primary |
| Materials | Type of material |
|---|---|
| Gibbsite | Unknown |
| Ore Body (1) | -58.74931, 5.96797 |
|---|
| Thickness | 10.5M | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 2147M | ||||||||||||||||||||||||||||||
| Width | 920M | ||||||||||||||||||||||||||||||
| Depth to top | 46M | ||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| Area | 3000HA | ||||||
|---|---|---|---|---|---|---|---|
| |||||||
| Operation type | Surface |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1910 |
| Year of first production | 1917 |
| Milling method | Pyrometallurgy Unspecified |
| District name | Demerara River Area |
|---|
| Type of mineral rights | State Lease |
|---|---|
| Type of mineral rights | Minerals Only |
| Ownership category | State |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | Linmine/Alcan |
| Interest | 100 |
| Home office | Guyana |
| Year | 1995 |
| Year | 1983 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 2000 Mt Ore Per Year | ||||||||||||||
| |||||||||||||||
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 2080 Mt Ore Per Year | ||||||||||||||
| |||||||||||||||
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 2200 Mt Ore Per Year | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 2080 Mt Ore Per Year | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1981 | ||||||||||||||
| Indicated | 30500000mt ore | ||||||||||||||
| Demonstrated | 30500000mt ore | ||||||||||||||
| Total resources | 30500000mt ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 3000HA | ||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 3120000048 |
ENGINEERING AND MINING JOURNAL, NOV. 1977.
MINING ANNUAL REVIEW, 1980.
EAST MONTGOMERY REPORT PROFILE, GOLDER ASSOC. 1981, P6.
MINING MAGAZINE. JAN. 1992.
BLEACKLEY, D. 1964. BAUXITES AND LATERITES OF BRITISH GUIANA
GEOLOGICAL SURVEY OF BRITISH GUIANA, BULL. NO. 34.
VELASQUEZ, JOSE DARIO H., 1972. LIMITS OF ECONOMIC FEASIBILI
BAUXITE IN WESTERN COLUMBIA. THESIS DEPT. OF MINERAL ECONOMI
COLO. SCHOOL OF MINES, GOLDEN. GEN. INFO. APPL. TO GUIANA MI
MINE AND QUARRY ENGINEERING, JUNE 1958, PP234-241.
WORLD MINING, OCTOBER 1975, PP38-41.
ENGINEERING AND MINING JOURNAL, NOVEMBER 1977, PP69-71.
ENGINEERING AND MINING JOURNAL, AUGUST 1979, P145.
EMJ CATALOG,SURVEY AND DIRECTORY, 1979, PP141-142.
EMJ CATALOG,SURVEY AND DIRECTORY, 1980, P183.
MINING ANNUAL REVIEW, 1980, P62.
MINING MAGAZINE, JUNE 1980, PP511-512.
BISHOPP, D.W., 1937, BULLT.#8,"GEOLOGICAL SURVEY OF BRITISH
GUIANA", PP2-3.
BISHOPP, D.W., 1954, BULLT.#26,"GEOLOGICAL SURVEY OF BRITISH
GUIANA
HOSE, H.R. 1959, PROCEEDINGS, FIFTH INTER-GUIANA CONFERENCE,
GORGETOWN. PP186-189.
LEFOND, S.J. 1975, 4TH ED, SOCIEITY OF MINING ENGIEERS OF
AIME, PP445-459.
| Subject category | Comment text |
|---|---|
| Deposit | PREVIOUS ALUMINUM STUDY, 1981 EVALUATION, DATA BASED ON GOLDERS DEPOSIT PROFILE REPORT, 1981. 1987 ALUMINUM STUDY, UPDATED EVALUATION JAN. 1989. BAUXITE ORE FROM EACH MINE AREA IS TRANSPORTED TO A COMMON STOCKPILE. FROM THEIR THE ORE IS TRANSPORTED BY TRAIN 12 KM TO THE OFF SITE MILL, WHERE IT IS WASHED AND DRIED. AT THIS POINT THE ORE IS READY FOR SHIPPMENT TO A REFINERY. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 26-SEP-96 | Wilburn, David R. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.