| Deposit ID | 10134606 |
|---|---|
| MAS/MILS ID | 7490151016 |
| Record type | Site |
| Current site name | Tema |
| Alternate or previous names | Valco |
| Point of reference | Town |
|---|---|
| Geographic coordinates: | -0.01526, 5.66787 (WGS84) |
| Location accuracy | 5000(meters) |
Political divisions (FIPS codes)
Ghana(country)
Africa(continent)
Land(continent)
| Country |
|---|
| Ghana |
| Commodity | Importance |
|---|---|
| Aluminum, Contained or Metal Critical | Primary |
| Town (1) | -0.01526, 5.66787 |
|---|
| Operation type | Processing Plant |
|---|---|
| Development status | Plant |
| Commodity type | Metallic |
| Significant | Yes |
| Year of first production | 1967 |
| Plant type | Smelter |
| Plant subcategory | Smelter-Pyrometallurgy |
| Type of mineral rights | Minerals Only |
|---|
| Ownership category | Private |
|---|
| Type | Owner |
|---|---|
| Owner | Kaisertech (Kaiser Aluminum) |
| Interest | 90 |
| Year | 1988 |
| Type | Owner |
|---|---|
| Owner | Reynolds |
| Interest | 10 |
| Year | 1988 |
| Type | Operator |
|---|---|
| Owner | Volta Aluminium Co. Ltd. |
| Home office | Ghana |
| Year | 1988 |
| Year | 1980 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 188000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Year | 1981 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 190000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Year | 1982 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 186000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Year | 1983 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 43000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Year | 1984 |
|---|---|
| Description | Pub. Al Metal Production 0 Mt/Yr, Al Metal |
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 49000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 127000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Year | 1987 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Pub. Al Metal Production 150000 Mt/Yr, Al Metal | ||||||||||||||
| |||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 7490151016 |
"PRIMARY ALUMINIUM SMELTERS" AUSTRALIAN MINERAL ECONOMICS
PTY LTD, PAGE 3.
BROOK HUNT & ASSOCIATES LTD., ALUMINIUM SMELTER DATA, 1985,
PAGE 257; 1988, PAGE 1.133.
U.S. BUREAU OF MINES, MINERALS AVAILABILITY PROGRAM,
"PRIMARY POST-MILL ALUMINUM SMELTING FACILITIES 1983: A
DATA BANK", CONTRACT #J0245003, OCTOBER 1, 1985.
TRIP REPORT. H. G. VAN OSS. USBM. 8/19/93.
| Subject category | Comment text |
|---|---|
| Deposit | MILS DATA IN THE "INITIAL YEAR OF PRODUCTION" FIELD IS THE SMELTER YEAR OF START-UP. ALL DATA IS BASED ON THE 1987 ALUMINUM AVAILABILITY AND NET- WORK SUPPLY STUDY. ALL GRADE DATA IS IN TERMS OF WT PCT CONTAINED ALUMINUM. ALL SMELTER INPUT CAPACITY DATA IS IN MT OF ALUMINA CONCENTRATE. ALL SMELTER OUTPUT DATA IS IN MT OF ALUMINUM METAL PRODUCTION. TRANSPORTATION RECORDS 01 AND 02 ARE GENERAL DATA USED IN THE 1987 ALUMINUM AVAILABILITY STUDY. RECORDS O3 TO 06 ARE MORE SPECIFIC AND WERE USED IN THE NETWORK SUPPLY MODEL STUDY. PLANT HAS POWER DEMAND OF 315 MW, AND USES 15.43 KWH/KG AL. PLANT USES 60-65% OF THE AVAILABLE POWER FROM THE AKOSOMBO DAM. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 10-JAN-95 | Buckingham, David A. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.