| Deposit ID | 10182636 |
|---|---|
| MAS/MILS ID | 4370900023 |
| Record type | Site |
| Current site name | Bito Ii Mine |
| Alternate or previous names | Bakony Bauxite Mines |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 17.53534, 47.06538 (WGS84) |
Political divisions (FIPS codes)
Veszprem(province)
Hungary(country)
| Country | State |
|---|---|
| Hungary | Veszprem |
| Commodity | Importance |
|---|---|
| Aluminum Critical | Primary |
| Materials | Type of material |
|---|---|
| Boehmite | Unknown |
| Ore Body (1) | 17.53534, 47.06538 |
|---|
| Strike | N00E | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 10N | ||||||||||||||||||||||
| Thickness | 10M | ||||||||||||||||||||||
| |||||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | No |
| Mining method | Open Stope - Underhand |
| Year of first production | 1925 |
| Milling method | Washing |
| District name | Bakony Mountains |
|---|
| Type | Operator |
|---|---|
| Owner | Bakony Bauxite Mines (State Owned) |
| Interest | 100 |
| Home office | Hungary |
| Year | 1989 |
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | 50.06% Al2o3 Ore Throughput (Estimated) 544000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | 50.53% Al2o3 Ore Throughput (Estimated) 241000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | 50.55% Al2o3 Ore Throughput (Estimated) 484000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1987 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | 50.84% Al2o3 Ore Throughput (Estimated) 237000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1988 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | 50.60% Al2o3 Ore Throughput (Estimated) 43000 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1989 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Accuracy | Estimate | ||||||||||||||
| Description | 50.79% Al2o3 Ore Throughput (Estimated) 0 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Year | 1990 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 50.63% Al2o3 Ore Throughput (Projected) 0 Metric Tons Of Ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 4370900023 |
HUNGARIAN BAUXITE MINING IN THE BAKONY REGION, MINING
MAGIZINE, L. 132, PP. 350-59 (MAY 1975).
METALS SOURCE BOOK, ITEM (A0834) (JAN. 15, 1973).
BARDOSSY G., BAUXITE DEPOSITS OF HUNGARY IN BAUXITE -
ALUMINUM, PROC. 2D INTERNAT. SYMP. ICSOBA, BUDAPEST, 1969
VOL. 20 (1971).
SURVEY OF PLANNED INCREASES IN WORLD BAUXITE, ALUMINA AND
ALUMINUM APACITIES 1974 - 1979, LONDON: ALUMINUM CONDUCTOR
DEVELOPMENT (1973).
MINING JOURNAL, P. 11 (JULY 16, 1973).
MINING ANNUAL REVIEW, P. 511 (1975).
MINING ANNUAL REVIEW, P. 449 (1974).
MINING ANNUAL REVIEW, P. 435 (1972).
COMMODITIES RESEARCH UNIT LIMITED.LONDON, THE BASE METAL
INDUSTRIES OF EASTERN EUROPE, PP. 149-50 (1990).
INDUSTRIAL MINERALS, P. 21 (SEPT. 1991).
INTERNATIONAL MINING, P. 23 (JUNE 1990).
| Subject category | Comment text |
|---|---|
| Deposit | THE STRATIFORM OREBODY OF THE BITO II MINE RANGES FROM FIVE TO FIFTEEN METERS IN THICKNESS. THE ORE FROM THE UNDERGROUND BITO II MINE IS TRANSPORTED TO THE SURFACE BY A CONVEYOR SYSTEM UP AN INCLINE OF AN UNKNOWN SLOPE. THE UNDERHAND STOPING METHOD OF MINING IS APPLIED TO THE THICKER PORTIONS OF THE STRATIFORM OREBODY. NOTE, THAT THE GEOLOGIC AGE UNDER THE LITHOLOGY SECTION OF THE ADIT/MAS FORM FOR THIS MINE IS OF THE MESOZOIC ERA, WHERE IN FACT, THE GEOLOGIC AGE MORE ACCURATELY RANGES FROM THE UPPER TRIASSIC TO THE MIDDLE OF THE EOCENE EPOCH OF THE TERTIARY PERIOD. FURTHERMORE, THE BAUXITE ORE IS ENCLOSED IN SEDIMENTARY ROCK WHICH GRADES FROM A UPPER TRIASSIC DOLOMITE UP TO A MIDDLE EOCENE LIMESTONE, THUS IS THE REASON WHY THE ROCK NAME IS LISTED AS A DOLOMITIC-LIMESTONE FOR SIMPLICITY. MOST RESERVES IN THE UNDERGROUND MINES ARE BELOW THE KARST WATER LEVEL WHICH CREATES A CONSTANT HAZARD OF FLOODING, HOWEVER PUMP STATIONS HAVE BEEN SUCCESSFULLY USED TO SOLVE THE FLOODING PROBLEMS IN THE NYIRAD MINES. MOBILE MINING EQUIPMENT INCLUDES ATLAS COPCO CAVO 310 LOADERS, GHH LHD MACHINES, AND ATLAS COPCO CAVO DRILLING RIGS IN THE UNDERGROUND MINES. THERE IS NO CRUSHING OR CONCENTRATING PLANT FOR THE BITO II MINE, NOR FOR ANY OF THE BAKONY BAUXITE MINES, INCLUDING THE NYIRAD, HALIMBA III, IHARKUT, FENYOFO I, AND THE BAKINYOSZLOP MINES. THE TOTAL LABOR FORCE FOR ALL OF THESE JUST NAMED MINES WAS PROJECTED TO BE AT 3,200 PERSONNEL IN 1990. NOTE FURTHER, THAT THE STRIKE AND DIP INFORMATION FOR THIS MINE, AMONG THE OTHER MINES MENTIONED IN THE FOREGOING PARAGRAPH, IS ONLY PARTIALLY GIVEN. IT IS HARD TO DISCERN WHETHER THE NUMERICAL VALUE GIVEN, 10 N, IS THE STRIKE OR THE DIP OF THE BEDS. ON GEOLOGIC MAPS, THE NUMERICAL DATA GIVEN WITH THE STRIKE AND DIP SYMBOL IS USUALLY, IF NOT ALWAYS, THE DIP OF THE BEDS. THEREFORE, THE "10 N" MAY MEAN THE BEDS DIP TEN DEGREES NORTH AND STRIKE ZERO DEGREES FROM DUE NORTH. ATTENTION MUST BE BROUGHT TO THE FACT THAT EVEN THOUGH EXTENSIVE PUMPING HAS BEEN SUCCESSFUL IN LOWERING THE WATER TABLE BELOW THE BAUXITE ORE OF THE NYIRAD MINES WHILE SIMULTANEOUSLY SUPPLYING THE SURROUNDING DOMESTIC, ENVIRONMENTAL, AND INDUSTRIAL NEEDS, THIS PUMPING OF THE GROUNDWATER OVER THE YEARS HAS UPSET THE NATURAL EQUILIBRIUM OF THE WATER TABLE. IN AN EFFORT TO PRESERVE THE LOCAL ENVIRONMENT, THE RATE OF WATER PUMPING HAS BEEN REDUCED TO THE EXTENT THAT THE NYIRAD BAUXITE MINES HAVE BEEN REFLOODED. THIS IS THE REASON WHY THE NYIRAD MINES WERE EXPECTED TO CEASE PRODUCTION IN 1990. THE CLOSURE OF THE NYIRAD BAUXITE MINES IS ESTIMATED TO RESULT IN THE LOSS OF TWO MILLION TONS OF HIGH QUALITY BAUXITE. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 14-DEC-1994 | Wilburn, David R. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.