| Deposit ID | 10024505 |
|---|---|
| MRDS ID | ISM0227 |
| Record type | Site |
| Current site name | Cerro Matoso Mine |
| Geographic coordinates: | -75.58304, 7.91786 (WGS84) |
|---|---|
| Elevation | 50 |
| Relative position | ORE BODY; 10 M |
Political divisions (FIPS codes)
Cordoba(province)
Colombia(country)
South America(continent)
Land(continent)
| Country | State |
|---|---|
| Colombia | Cordoba |
| Commodity | Importance |
|---|---|
| Nickel Critical | Primary |
| Iron | Primary |
| Cobalt Critical | Primary |
| Chromium Critical | Primary |
| Host or associated | Host |
|---|---|
| Rock type | Plutonic Rock > Ultramafic Intrusive Rock > Peridotite |
| (1) | -75.58304, 7.91786 |
|---|
| Type of structure | Regional |
|---|---|
| Structure description | Tropical Weathering |
| Depth to top | 10M |
|---|
| Development status | Prospect |
|---|---|
| Commodity type | Metallic |
| Significant | No |
| Discovery year | 1956 |
| Year of first production | 1980 |
| Type | Operator |
|---|---|
| Owner | Cerro De Matoso S.A. |
| Type | Owner |
|---|---|
| Owner | Empresa Colombiana De Niquel Ltda. (Econiguel) (46%) ; Billiton Overseas Ltd. (45%); Conicol; (9%) H |
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1971 | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1979 | ||||||||||||||
| |||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| USGS | Mineral Resources Data System | MRDS | ISM0227 | |
| USGS | International Strategic Minerals Inventory | ISMI | NI053 | |
| U.S. Bureau of Mines | Minerals Availability System | MAS | 3010210001 | |
| USGS | BGR | BGR | PA00088 |
GOMEZ, R., OGRYZLO, C.T., AND DOR, A.A., 1979, THE CERRO MATOSO NICKEL PROJECT, IN EVANS, D.J.I., SHOEMAKER, R.S.,- VELTMAN, H., EDS., INTERNATIONAL LATERITE SYMPOSIUM: AMERICA-N INSTITUTE OF MINING, METALLURGICAL AND PETROLEUM ENGINEERS, -P. 412-458. (RR3)
MINING ANNUAL REVIEW, 1978, CENTRAL AND SOUTH AMERICA--COLOMBIA: LONDON, MINING JOURNAL, LTD. (RR2)
MINING MAGAZINE, 1982, PANORAMA--COLUMBIAN FERRONICKEL PROJECT ON STREAM: MINING MAGAZINE, V. 147, NO. 2, P. 79-8-1. (RR8,P. 81)
ROSKILL INFORMATION SERVICES, 1977, THE ECONOMICS OF NICKEL, 2D ED.: LONDON, ROSKILL INFORMATION SERVICES, LTD., -(587) P. (RR1,C18,PA8)
ENGINEERING AND MINING JOURNAL, 1982, COLOMBIA'S CERRO MATOSO POISED FOR 1982 FERRONICKEL PRODUCTION START: ENGIN-EERING AND MINING JOURNAL, V. 183, NO. 1, P. 35-37. (PC1, PC8,- RR8)
SALAK, JOHN, 1984, BILLITON OPTIMISTIC ON FUTURE: AMERICAN METAL MARKET, V. 92, NO. 134 (11 JULY), P. 1, 16. (PA1-)
MINING ANNUAL REVIEW, 1983, CENTRAL AND SOUTH AMERICA-COLOMBIA: LONDON, MINING JOURNAL, LTD. P. 355-356.
MINING ANNUAL REVIEW, 1983, CENTRAL AND SOUTH AMERICA--COLOMBIA: LONDON, MINING JOURNAL, LTD. P. 318-319.
PA1: RF6, P. 16; PA8: RF4 PC1, PC8: RF5
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 01-DEC-1982 | Foose, Michael P. | U.S. Geological Survey |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.