| Deposit ID | 10089364 |
|---|---|
| MRDS ID | W018972 |
| Record type | Site |
| Current site name | Pine Point Mine |
| Geographic coordinates: | -114.45135, 60.80006 (WGS84) |
|---|---|
| Elevation | 160 |
| Relative position | SOUTH SHORE OF GREAT SLAVE LAKE |
Political divisions (FIPS codes)
Alaska(state)
United States(country)
North America(continent)
Land(continent)
| Country | State |
|---|---|
| Canada | Northwest Territories |
| Commodity | Importance |
|---|---|
| Lead | Primary |
| Zinc Critical | Primary |
| Materials | Type of material |
|---|---|
| Galena | Ore |
| Sphalerite | Ore |
| Calcite | Gangue |
| Fluorite | Gangue |
| Marcasite | Gangue |
| Pyrite | Gangue |
| Result | 1974 RESERVES - 35.8 MIL MT ORE AT 2.2% PB, 5.7% ZN |
|---|
| Model code | 224 |
|---|---|
| USGS model code | 32a |
| Deposit model name | Mississippi Valley, S.E. Missouri Pb-Zn |
| Mark3 model number | 42 |
| Host or associated | Host | ||
|---|---|---|---|
| Rock type | Sedimentary Rock > Carbonate > Dolomite | ||
| Rock unit name | Presqu'Ile Formation-Dolomite;Pine Point Formation-Dolomite | ||
| Rock description | Presqu'Ile Formation-Dolomite;Pine Point Formation-Dolomite | ||
| |||
| (1) | -114.45135, 60.80006 |
|---|
| Type of structure | Regional |
|---|---|
| Structure description | Western Canadian Sedimentary Basin To The West, Mackenzie Shale Basin On The North, Elk Point Evaporite Basin To The South |
| General form | ELONGATE TABULAR LENSES |
|---|---|
| Length | 40000M |
| Width | 10000M |
| Depth to top | 0M |
| Development status | Producer |
|---|---|
| Commodity type | Metallic |
| Deposit size | Large |
| Significant | No |
| Discovery year | 1898 |
| Year of first production | 1964 |
| District name | Pine Point District |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | Pine Point Mines Ltd. |
| Year | 1968 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Material | ORE | |||||||||||||||||||||
| Accuracy | Accurate | |||||||||||||||||||||
| Description | Ap_Grade: ^19. % Pb, 25. % Zn, (Direct Shipping Ore) | |||||||||||||||||||||
| ||||||||||||||||||||||
| Year | 1968 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Material | ORE | |||||||||||||||||||||
| Accuracy | Accurate | |||||||||||||||||||||
| Description | Ap_Grade: ^3.5 % Pb, 6.6 % Zn, (Milling Ore) | |||||||||||||||||||||
| ||||||||||||||||||||||
| Year | 1973 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Material | ORE | ||||||||||||||
| Accuracy | Accurate | ||||||||||||||
| Description | Ap_Grade: ^8.9 % Pb-Zn (Combined Milled Ore) | ||||||||||||||
| |||||||||||||||
| Year | 1976 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Material | ORE | |||||||||||||||||||||
| Accuracy | Accurate | |||||||||||||||||||||
| Description | Ap_Grade: ^5.3 % Zn, 1.7 % Pb, (72,000 T Pb Conc., 323,000 T Zn Conc.) | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1976 | |||||||||||||||||||||
| Total resources | 32800000000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| USGS | Mineral Resources Data System | MRDS | W018972 |
GIBNEY, W. H. R., 1970, MINING OPERATIONS AT PINE POINT MINES; IN AIME WORLD SYMPOSIUM ON MINING AND METALLURGY OF LEAD & ZINC, V. 1 P 289 - 300
BEALES, F. W. JACKSON, S. A., 1968, PINE POINT - A STRATIGRAPHICAL APPROACH; CAN. MINING AND METALLURGICAL BULL., JULY 1968 P. 867 - 877
1929 DIREXPL NORTHERN PB - ZN CO. - 500,000 MT LOCATED
1948 DIREXPL COMINCO - 4.5 MIL MT OF 4% PB, 7% ZN BY 1954
JACKSON, S. A. AND FOLINSBEE, 1969, ECON. GEOL. V. 64 P 713. CANADIAN MINES HNDBK 1975 - 6 P., 1973 - 4 P 267. U.S. BU MINES MIN YBK 1973 V. 1 P. 695. NORTHERN MINER 3-24-77 P 3
NORTHERN MINER, 3-24-77 P. 22
| Subject category | Comment text |
|---|---|
| Deposit | 60 MILLION MET TONS |
| Deposit | TRUCK HAULS TO CONCENTRATOR UP TO 12 KM AWAY AT SPEEDS UP TO 64 KM/H CAUSES SHORT TIRE LIFE. HAULAGE COSTS UP TO 1970 WERE 50% OF TOTAL PRODUCTION COST. PUMPING COSTS ARE SIGNIFICANT ALSO - $0.44 PER MT IN 1968 (INCLUDING $0.22 FOR CAPITAL) |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 01-JAN-1976 | Schruben, Paul G. | U.S. Geological Survey |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.