Sutton/Rodcamp

Producer in Zimbabwe with commodity Chromium
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Materials information
  7. Nearby scientific data
  8. Ore body information
  9. Economic information about the deposit and operations
  10. Mining district
  11. Ownership information
  12. Workings at the site
  13. Links to other databases
  14. Bibliographic references
  15. General comments
  16. Reporter information

Geologic information

Identification information

Deposit ID 10134687
MAS/MILS ID 7960100027
Record type Site
Current site name Sutton/Rodcamp
Alternate or previous names Rodcamp, Sutton

Geographic coordinates

Point of reference Claim
Geographic coordinates: 30.58463, -17.41376 (WGS84)
Elevation 1320
Location accuracy 1000(meters)

Site location context

Political divisions (FIPS codes)

Zimbabwe(country)

Africa(continent)

Land(continent)

Geographic areas

Country
Zimbabwe

Commodities

Commodity Importance
Chromium Critical Primary

Materials information

Materials Type of material
Chromite Unknown
Olivine Unknown
Plagioclase Unknown
Pyroxene Unknown

Nearby scientific data

Claim (1) 30.58463, -17.41376

Economic information

Ore body information

  • Strike N10E
    Dip 30E
    Thickness 0.1M
    Length 15000M
    Width 300M
    Depth to top 75M
    Field Value
    MAS Matrix # 1
    MAS Column # 2
    Type of Orebody #1 OTHER
    Shape of Orebody #1 TABULAR
    Primary mode of Origin MAGMATIC DIFFER
    Primary Ore Control FAULTING
    Degree of Wallrock Alter. SLIGHT
    Type of Wallrock Alter. #1 OTHER
    Strike And Dip N10E:30E
    Minimum Depth to Top 0
    Avg. Thick. Unconsol. Mat. .5
    Min. Thick. Unconsol. Mat. 0
    Date of Last Modification 830621
  • Area 2500HA
    Field Value
    Total Surface Area (HA) 2500
    Date of Last Modification 910418

Economic information about the deposit and operations

Operation type Underground
Development status Producer
Commodity type Metallic
Significant Yes
Discovery year 1925
Mining method Open Stope - Breast Stoping
Year of first production 1950
Milling method Gravity

Mining district

District name Hartley Complex

Ownership information

  • Type Owner-Operator
    Owner Rhodesia Alloys Ltd (Rhodall)
    Interest 100
    Home office Zimbabwe

Comments on the reserve resource information

  • SECTION IN CONTINUOUS PRODUCTION SINCE 1926. MILL AT SUTTON/RODCAMP TREATS FINES FROM SUTTON/RODCAMP, VANAD, AND CAESAR. MILL HAS GRAVITY CONC.CAP.OF ABOUT 100,000 MTPY FINES TO PRODUCE 75,000 MTPY CONCS. ALL PRODS.TO GWERU. FOR ANALYSIS (SUTTON/RODCAMP ONLY): 36,000 MTPY ROM FOR: 11,500 MTPY LUMP AT 44 % CR2O3 AND 18,300 MTPY CONCS.AT 48.6 % CR2O3. GREAT DYKE RESOURCE. SEAMS 4,5,6,7 ON SECTION. SEAMS 4&7 = .15 M THICK, SEAMS 5&6 = .12 M THICK.
  • M9C4=M1C2. INDIVIDUAL SEAMS OCCURING ON THE SECTION (SEAM NOS. 4, 5, 6, 7, 8, 9 AND 10) PROJECTED FOR A DOWN-DIP EXTENSION OF 300 METERS (VERTICAL DEPTH OF AROUND 125 METERS). THICKNESSES OF THE 7 SEAMS OVER THE SECTION ARE ESTIMATED TO BE .10, .12, .12, .15, .15, .10, AND .12 METERS RESPECTIVELY. ESTIMATED STRIKE LENGTHS FOR ALL 7 SEAMS ARE 15,000 METERS. 50% PROB. LEVEL IS ESTIMATE FOR DOWN-DIP EXTENSIONS OF 800 M FOR SEAM 4, 1000M FOR SEAM 5, 1200 M FOR SEAM 6 AND 1500 M FOR SEAMS 7-10.
  • 1/89 INSITU DEMO.TONNAGE= SEAMS 6 & 7 ONLY TO 300 M ON-DIP. 85 % RECOVERY.

Workings at the site

  • Type of workings Underground
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method PROPOSED
    Mining Method RESUING 10-61
    Percent Waste Rock 0
    Percent Recovery 80
    Hardness of Rock HARDROCK WITH LITTLE WATER
    Rock Characteristics MULTIPLE SYSTEMS OF WEAKNESS PLANES
    Rock Support Chars. SUPPORTING
    Mine Support Chars. POST, HEADBOARD, CAPS, ROOF BOLTS
    Length of Inclines (m) 75
    Slope of Inclines 25
    Number of Inclines 2
    Number of Adits 15
    1st Condition of Workings OPEN
    Capacity 120
    Capacity Units MT ORE/DAY
    Unit Production Cost 67.65
    Units of Production $/MT ORE
    Operating Days per Year 300
    Operating Shifts per Day 2
    Year of Information 1982

Reference information

Bibliographic references

  • Deposit

    ALREY, N.M. "A REVIEW OF CHROMITE MINING IN THE GREAT DYKE."

  • Deposit

    CHAMBER OF MINES JOURNAL. JUNE 1975. PP.35-43.

  • Deposit

    COTTERILL, P. "THE CHROMITE DEPOSITS OF SELUKWE, RHODESIA."

  • Deposit

    ECONOMIC GEOLOGY MONOGRAPH VOL.4. PP.154-186.

  • Deposit

    COTTERILL, P. "THE SELUKWE SCHIST BELT AND ITS CHROMITE

  • Deposit

    DEPOSITS." GEOLOGICAL SOCIETY OF SOUTH AFRICA. VOL.5.

  • Deposit

    1979. PP.229-245.

  • Deposit

    STOWE, CLIVE W. "ALPINE-TYPE STRUCTURE IN THE RHODESIAN

  • Deposit

    BASEMENT COMPLEX AT SELUKWE ." JOURNAL OF THE GEOLOGICAL

  • Deposit

    SOCIETY. LONDON. VOL.130. 1974. PP.411-425.

  • Deposit

    STOWE, C.W. "THE GEOLOGY OF THE COUNTRY SOUTH AND WEST OF

  • Deposit

    SELUKWE." RHODESIA, GEOLOGICAL SURVEY BULLETIN NO.59.

  • Deposit

    SALISBURY. 1968. PP.178-180.

  • Deposit

    TINDALE, R. AND M.A. BISCOE. "THE GEOLOGY OF THE COUNTY

  • Deposit

    AROUND GWELO." SOUTHERN RHODESIA, GEOLOGICAL SURVEY

  • Deposit

    BULLETIN NO.39.1949. PP.120-137.

  • Deposit

    WILSON, N.H. "NOTES ON THE MINING INDUSTRY OF SOUTHERN

  • Deposit

    RHODESIA." GEOLOGICAL SURVEY OF SOUTHERN RHODESIA.

  • Deposit

    PP.55-59.

  • Deposit

    WORST, B.G. "THE GREAT DYKE OF SOUTHERN RHODESIA." SOUTHERN

  • Deposit

    RHODESIA, GEOLOGICAL SURVEY BULLETIN NO.47. 1960.

  • Deposit

    PP.82-106, 186-231.

General comments

Subject category Comment text
Deposit THIS ANALYSIS TREATS A SINGLE SMALL SECTION OF THE GREAT DYKE AS ONE MINEABLE UNIT-"THE SUTTON/RODCAMP SECTION? . IN REALITY, MORE THAN ONE COMPANY MAY HOLD LEASES OVER THE AREA DESCRIBED AND SIMULTANEOUS PRODUCTION IS POSSIBLE. FOR AVAILABILITY IT WAS NECESSARY TO ADDRESS THE SITUATION IN A LOGICAL, COMPARTMENTALIZED FASHION. HENCE, THE "SUTTON /RODCAMP" SECTION REFERS TO AN 18 KM SECTION ALONG THE WEST "LIMB OF THE GREAT DYKE SYNCLINE, FROM TOWN OF KILDONAN, S" TO SOUTH LATITUDE 17 DEG. 30 MIN.

Reporter information

Type Date Name Affiliation Comment
Reporter 21-APR-95 Rfb U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.