| Deposit ID | 10157777 |
|---|---|
| MAS/MILS ID | 1220150022 |
| Record type | Site |
| Current site name | Pipe Underground |
| Alternate or previous names | Pipe Mine, Pipe 2 |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -98.16268, 55.49176 (WGS84) |
| Elevation | 210 |
Political divisions (FIPS codes)
Alaska(state)
United States(country)
North America(continent)
Land(continent)
| Country | State |
|---|---|
| Canada | Manitoba |
| Commodity | Importance |
|---|---|
| Cobalt Critical | Primary |
| Gold | Tertiary |
| Nickel Critical | Primary |
| PGE Critical | Tertiary |
| Palladium Critical | Tertiary |
| Platinum Critical | Primary |
| Silver | Primary |
| Materials | Type of material |
|---|---|
| Nickel Skutterudite | Unknown |
| Pentlandite | Unknown |
| Pyrrhotite | Unknown |
| Serpentine | Unknown |
| Ore Body (1) | -98.16268, 55.49176 |
|---|
| Strike | N40E | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 75E | ||||||||||||||||||||||||||||||||
| Thickness | 160M | ||||||||||||||||||||||||||||||||
| Depth to top | 100M | ||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||
| Strike | N40E | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 75E | ||||||||||
| Thickness | 160M | ||||||||||
| Depth to top | 100M | ||||||||||
| |||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | No |
| Discovery year | 1956 |
| Milling method | Flotation |
| District name | Thompson Nickel Belt |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | The International Nickel Co. Of Canada, Ltd |
| Interest | 100 |
| Home office | Canada |
| Year | 1981 |
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1973 | |||||||||||||||||||||
| Measured | 13600000mt ore | |||||||||||||||||||||
| Demonstrated | 13600000mt ore | |||||||||||||||||||||
| Total resources | 13600000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overall depth | 2460M | ||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 1220150022 |
JANESON, J., WALL CONTROL TECHNIQUES AT INCO'S PIPE OPEN
PIT; CIM BULL., MAY, 1979, P.76-78.
ACHTER,R.G. AND E.WILSON."RENOVATION OF THE DRAINAGE SYSTEM
AT INCO'S PIPE OPEN PIT."CIM BULLETIN.MONTREAL. APRIL
1980 .
AZIS,A.,ET AL. "THE UNDISCOVERED MINERAL ENDOWMENT OF THE
CANADIAN SHIELD IN MANATOBA." A FEDERAL-PROVINCIAL CO-
OPERATIVE STUDY,MINERAL BULLETIN MR124 OF THE DEPART-
MENT OF ENERGY,MINES AND RESOURCES. OTTAWA. PUBLICATION
72-1 OF THE DEPARTMENT OF MINES,RESOURCES AND ENVIRON-
MENTAL MANAGEMENT. WINNIPEG. 1972.
CANADIAN MINING JOURNAL. MONTREAL. NOVEMBER 1980.
COATES,C.J.A.,ET AL. GEOLOGY AND MINERAL DEPOSITS OF THE
FLIN FLON,LYNN LAKE AND THOMPSON AREA,MANITOBA,AND THE
CHURCHILL-SUPERIOR FRONT OF THE WESTERN PRECAMBRIAN
SHIELD.24TH INTERNATIONAL GEOLOGICAL CONGRESS. MONTREAL
. 1972
COATES,C.J.A.,ET AL. GEOLOGY OF THE MOAK-SETTING LAKES AREA,
MANITOBA,FIELD TRIP NO.1. GEOLOGICAL ASSOCIATION OF
CANADA AND MINERALOGICAL ASSOCIATION OF CANADA. AUGUST
1970. REVISED DECEMBER 1970
DAVIES,J.F.,ET AL. GEOLOGY AND MINERAL RESOURCES OF MANITOBA
.DEPARTMENT OF MINES AND NATURAL RESOURCES. WINNIPEG .
1962.
DEPARTMENT OF ENERGY,MINES AND RESOURCES. MINERAL DEVELOPE-
MENT SECTOR.PUBLIC DEPOSIT FILES. OTTAWA,CANADA.
DEPARTMENT OF ENERGY,MINES AND RESOURCES. SURVEYS AND MAPP-
ING BRANCH. MYSTERY LAKE TOPOGRAPHIC MAP. SCALE
1:50,000,MAP 63P/13 EDITION 2. OTTAWA. 1980. PHOTO-
GRAPHS,1976; CULTURE CHECK,1978.
INCO LTD. AR 1980. 10 K
INCO LTD. $CAN75,000,000 9 1/4% DEBENTURE OFFERING. TORONTO.
OCTOBER 1,1970
INCO LTD. $CAN125,000,000 7.85% PREFERRED SHARES SERIES B
OFFERING. TORONTO .NOVEMBER 29,1977.
INCO LTD. "THE THOMPSON PROJECT."
JAMESON,J."WALL CONTROL TECHNIQUES AT INCO'S PIPE OPEN PIT."
CIM BULLETIN. MONTREAL. MAY 1979.
NORTHERN MINER."FACILITIES ALMOST READY TO BOOST OUTPUT AT
INCO'S THOMPSON PLANT.".TORONTO . OCTOBER 8,1970.
NORTHERN MINER."IMPRESSIVE PLANT ARISES IN NORTHERN
MANITOBA.".SEPTEMBER 17,1959
NORTHERN MINER. TORONTO . JANUARY 11,1979.
NORTHERN MINER. TORONTO . AUGUST 2,1973.
PABST,MARILYN."FRESH IDEAS INCO TRADEMARK IN MANITOBA," AND
"CHANGES AIMED AT WORKPLACE SAFETY IN THOMPSON MINE."
PATTERSON,J.M. GEOLOGY OF THE THOMPSON-MOAK LAKE AREA. DE-
PARTMENT OF MINES AND NATURAL RESOURCES. PUBLICATION
60-4. WINNIPEG. 1963.
PEREDERY,W.V. AND C.J.A. COATES. GUIDEBOOK FOR NICKLE SUL-
FIDE FIELD CONFERENCE. OCTOBER 1978.
ROSS,A.R. "THOMPSON: RIPPLES IN THE CANADIAN POND."
INTERNATIONAL NICKEL MAGAZINE. TORONTO . 1973.
SHARPE,K.R. "SINKING THE SHAFT AND DEVELOPING THE OREBODY OF
PIPE NO.2 MINE AT THOMPSON,MANITOBA FOR INTERNATIONAL
NICKEL COMPANY OF CANADA LTD. BY R.F. FRY & ASSOCIATES
LTD." TORONTO. APRIL 1970.
THE INTERNATIONAL NICKEL COMPANY OF CANADA LTD. "PIPE DEV-
ELOPEMENT BIGGEST OF INCO EXPANSION MINES." SUDBURY.
FEBRUARY 1971
THE THOMPSON CHAMBER OF COMMERCE. "CITY OF THOMPSON,THE HUB
OF NORTHERN MANITOBA." THOMPSON,MANITOBA.
THEYER,P. STRATIGRAPHIC SETTING OF SELECTED ULTRAMAFIC
BODIES IN THE SUPERIOR AND CHURCHILL PROVINCES AND CER-
TAIN ASPECTS OF NICKEL COPPER DEPOSITS IN THE THOMPSON
NICKEL BELT. MANITOBA DEPARTMENT OF ENERGY AND MINES,
MINERAL RESOURCES DIVISION. ECONOMIC GEOLOGY REPORT
ER 79-2. WINNIPEG. 1980
ZURBRIGG,H.F. "THOMPSON MINE GEOLOGY." CANADIAN INSTITUTE OF
MINING. MONTREAL . JUNE 1963.
| Subject category | Comment text |
|---|---|
| Deposit | 77-RCD-620-PRODUCTION FROM NO. 1 SHAFT SUSPENDED BY DEC.1,19 77-RCD-630-PRODUCTION WAS REDUCED AT OPEN PIT IN OCT.,1971. 77-RCD-630-TOTAL MINING SYSTEM CAPACITY IS RATED AT 14500MTP THE PIPE UNDERGROUND MINE IS VERY SIMILAR TO THE THOMPSON MINE. PIPE UNDERGROUND IS PIP 2 MINE,IN THIS LIST, WHICH HAS BEEN PARTIALLY DEVELOPED IN 1975 AND 1977 AND WILL BECOME FURTHER DEVELOPED AND PRODUCING WHEN DEVELOPEMENT AND PRODUCTION BECOME ECONOMICALLY FEASIBLE. THE PIPE DEPOSIT HAS THREE MINE OPERATIONS: THE PIPE 1 MINE, A SMALL OPERATION ON A SEPARATE DEPOSIT SHUT DOWN SINCE 1971; THE PIPE 2 MINE,WHICH REQUIRES EXTENSIVE DEV- ELOPEMENT PRIOR TO PRODUCTION; AND THE PIPE OPEN PIT MINE,WHICH IS CURRENTLY IN OPERATION. THE PIPE 2 MINE HAS NEVER BEEN IN PRODUCTION AND HAS NOT BEEN FULLY DEVELOPED LONGHOLE BLASTHOLE METHODS WERE UNDOUBTEDLY PLANNED FOR THE MINE.THE MOST PROBABLE METHOD WOULD HAVE BEEN STOPE SHRINKAGE AND MASS BLASTING OF THE PILLARS.INTO THE EMPTY STOPES (LARGE DIAMETER IN-THE-HOLE BLASTHOLE STOPING OF PRIMARY STOPES AND VERTICAL CRATER RETREAT MINING). IN THE COMMODITY SECTION,THE LAST THREE COMMODITIES,PALL- ADIUM,GOLD,AND "OTHER" ARE ALL PART OF SPARE 35.THE OTHER CATEGORY IN SPARE 35, WITH A GRADE OF 1.956 GRAMS /MT.,WHICH REPRESENTS THE PLATINUM METAL GROUP; OTHER = THE Q-RESERVE DATA WAS DERIVED FROM DIMENSIONAL AND UNPUB- LISHED DATA FOR PIPE 2 MINE. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 05-JAN-1995 | Rgc | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.