| Deposit ID | 10158751 |
|---|---|
| MRDS ID | W028410 |
| MAS/MILS ID | 7910200038 |
| Record type | Site |
| Current site name | Montrose Hendriksplaats |
| Alternate or previous names | Montrose, Hendriksplaats |
| Related records | 10079237 |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 30.15831, -24.62586 (WGS84) |
| Elevation | 1200 |
| Location accuracy | 10000(meters) |
Political divisions (FIPS codes)
South Africa(country)
Africa(continent)
Land(continent)
| Country |
|---|
| South Africa |
| Commodity | Importance |
|---|---|
| Chromium Critical | Primary |
| Materials | Type of material |
|---|---|
| Chromite | Unknown |
| Enstatite | Unknown |
| Feldspar | Unknown |
| Pyroxene | Unknown |
| Ore Body (1) | 30.15831, -24.62586 |
|---|
| Strike | N00E | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 12W | ||||||||||||||||||||||
| Thickness | 1.2M | ||||||||||||||||||||||
| Length | 4000M | ||||||||||||||||||||||
| Width | 1443M | ||||||||||||||||||||||
| Depth to top | 150M | ||||||||||||||||||||||
| |||||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Plant |
| Commodity type | Metallic |
| Deposit size | Large |
| Significant | Yes |
| Mining method | Open Stope - Breast Stoping |
| Year of first production | 1956 |
| Plant type | Beneficiation (Mill) |
| Plant subcategory | Gravity |
| Milling method | Gravity |
| District name | East Bushveld Complex |
|---|
| Type | Owner |
|---|---|
| Owner | General Mining And Finance Corp. |
| Interest | 100 |
| Home office | South Africa |
| Year | 1993 |
| Type | Operator |
|---|---|
| Owner | Transvaal Mining And Finance Co. Ltd. |
| Home office | South Africa |
| Year | 1993 |
| Year | 1977 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 400000 Mt Ore | ||||||||||||||
| |||||||||||||||
| Year | 1978 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 362285 Mt Product | ||||||||||||||
| |||||||||||||||
| Year | 1979 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 396000 Mt Product | ||||||||||||||
| |||||||||||||||
| Year | 1980 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 487000 Mt Product | ||||||||||||||
| |||||||||||||||
| Year | 1981 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 476000 Mt Product | ||||||||||||||
| |||||||||||||||
| Year | 1982 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 289000 Mt Product | ||||||||||||||
| |||||||||||||||
| Year | 1983 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 256000 Mt Product | ||||||||||||||
| |||||||||||||||
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Annual Production 280000 Mt Product | ||||||||||||||
| |||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overall depth | 150M | ||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 7910200038 | |
| USGS | Mineral Resources Data System | MRDS | W028410 | MAS references MRDS |
GEOL. SOC. SOUTH AFRICA, TRANS. V.62, 1959, P.59-71.
RANKIN, G., 1975, CHROMIUM AND FERROCHROMIUM IN S. AFRICA, N
ISSUE.
STAFF, 1959, GEOLOGICAL SOCIETY OF SOUTH AFRICA, V.62, P. 59
-71.
HECKROODT,R.O.1959.THE GEOLOGY AROUND THE DUNITE PIPE ON
DRIEKOP.TRANS.GEOL.SOC.OF S.AFRICA.V.62.1959.PP.59-71.
DE WET,J.F.1952.CHROMITE INVEST.-PART III,VARIATIONS IN THE
COMPOSITION OF THE PURE CHROMITE METAL FROM THE EASTERN
CHROME BELT,LYDENBURG DISTRICT.JOURNAL OF CHEMICAL,
METALLURGICAL AND MINING SOCIETY OF S.AFRICA,JAN.1952,
PP.143-155.
WORLD MINING.NEW CHROMITE MINE EXPANSIONS IN SOUTH AFRICA.
SEPT.1977,PP.114-115.
UNION OF SOUTH AFRICA GEOL.SURVEY.THE TRANSVAAL CHROMITE
DEPOSITS,EASTERN BELT.PLATE I.BULLETIN NO.10.
SIEMS,P.1976.CHROMITE MINES AND RESOURCES IN THE REPUBLIC
OF S.AFRICA.MINERALS AVAIL.SYSTEM.DEC.1976.PP.21-23.
BALLEN,R.F. "THE IMPLICATION OF SOUTH AFRICA AND ZIMBABWE
ON THE AMERICAN FERRUCHROME INDUSTRY." THES IS COLORADO
SCHOOL OF MINES. 1981
CAMERON,N. EUGENE."CHROMITE DEPOSITS OF THE EASTERN PART OF
THE BUSHVELD COMPLEX." PP 131-168.
COERTZE,F.J. AND C.B. COETZEE. "CHROMIUM." PP.117-122.
CORIN,E.R."FERROUS AND NON-FERROUS MINES AND WORKS IN SOUTH
AFRICA." DIRECTORY NO. 3/79. MINERALS BUREAU,DEPARTMENT
OF MINES,REPUBLIC OF SOUTH AFRICA.
RANKIN,G."CHROMIUM AND FERRO-CHROME IN SOUTH AFRICA."SANDERS
AND TAYLOR. NOVEMBER 1975. PP.29-38.
ROSKILL INFORMATION SERVICE LIMITED."THE ECONOMICS OF
CHROMIUM." THIRD EDITION. 1978. P.13.
SIEMS,P.L.,E.M. CRIST, L.E. SHECHAN,AND B.BHATT."CHROMITE
MINES AND RESOURCES IN THE REPUBLIC OF SO. AFRICA."
UNIVERSITY OF IDAHO. DECEMBER 1976. PP. 1-34.
"THE CHROME INDUSTRY IN SOUTH AFRICA." P.17
THE TEX REPORT COMPANY LIMITED. PP.106-112 AND 128.
WILLEMSE,J. "THE GEOLOGY OF THE BUSHVELD IGNEOUS COMPLEX,
THE LARGEST REPOSITORY OF MAGMATIC ORE DEPOSITS IN THE
WORLD." MAGMATIC ORE DEPOSITS, A SYMPOSIUM. PP.1-22.
SILK M H, 1988, "WORLD CHROMITE RESOURCES AND FERROCHROME
PRODUCTION", MINTEK SPECIAL PUBL. NO.11
DAVIDOFF R L, BOYLE E H JR., 1988,"NOTES FROM VISIT TO THE
REPUBLIC OF SOUTH AFRICA", USBM.
| Subject category | Comment text |
|---|---|
| Deposit | LOCATED IN LYDENBURG DISTRICT ON FARM HENDRIKSPLAATS 281 KT 13 KM NW OF STEELPOORT IN 1976-MINE SERVICED BY 3 WINZES (AT MINUS 14 TO 17 DEGREES) PLUS ONE VERTICAL SHAFT(COMMISSIONED 1970-TO DEPTH OF 152 M. IN 1977-NEW INCLINE SHAFT BEING SUNK(-11 DEGREES,CROSS- SECTIONAL AREA OF 11.8SQ.M.,TOTAL LENGTH OF 914 M, SERVING 3 LEVELS,CONVEYOR BELT EQUIPPED). ALSO IN 1977-NEW CONCENTRATOR BEING BUILT ADJACENT TO NEW SHAFT. TOTAL CAPACITY OF NEW SHAFT & MILL TO BE 600,000 MTPY RAW ORE HOISTED-EST.COST $5,750,000 FOR EXPANSION. AT MILL INITIAL SCREENING PRODUCES -3MM FINES,+40MM LUMPS AND +3MM,-40MM MIDDLING WHICH GOES TO TO ROD MILL.LUMP OR IS HANDSORTED. PRODUCTS:1975:40,000 MT OF LIMP ORE(41%CR2O3) 120,000 MT OF FINES-CHEMICAL&FOUNDRY SAND(44- 46%CR2O3). PLANNED TOTAL PROD.BY 1980 TO BE 550,000 MTPY PRODUCTS (FINES&LUMPS). POORT ARE TRUCKED 16 KM. IN 1978 WHEN NEW SHAFT&MILL IN OPERATION EMPLOYMENT WILL BE 36 WHITES &650 BLACKS-AT 1975 CAPACITY EMPLOYMENT WAS 23 WHITES &600 BLACKS. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 08-MAR-93 | Boyle, Ed | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.