| Deposit ID | 10159284 |
|---|---|
| MAS/MILS ID | 6020350037 |
| Record type | Site |
| Current site name | Weipa Andoom |
| Alternate or previous names | Lorim Point, Weipa and Andoom, Weipa Peninsula Mine, Weipa Bauxites |
| Point of reference | Town |
|---|---|
| Geographic coordinates: | 141.89309, -12.66012 (WGS84) |
| Elevation | 15 |
| Location accuracy | 1000(meters) |
Political divisions (FIPS codes)
Queensland(province)
Australia(country)
Australia(continent)
Land(continent)
| Country | State |
|---|---|
| Australia | Queensland |
| Commodity | Importance |
|---|---|
| Aluminum Critical | Primary |
| Kaolin | Secondary |
| Materials | Type of material |
|---|---|
| Boehmite | Unknown |
| Gibbsite | Unknown |
| Town (1) | 141.89309, -12.66012 |
|---|
| Strike | W90N | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 00E | ||||||||||||||||||||||||||||||||
| Thickness | 2.4M | ||||||||||||||||||||||||||||||||
| Length | 40370M | ||||||||||||||||||||||||||||||||
| Width | 40370M | ||||||||||||||||||||||||||||||||
| Depth to top | 0.6M | ||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||
| Operation type | Surface |
|---|---|
| Development status | Producer |
| Commodity type | Both |
| Significant | Yes |
| Discovery year | 1955 |
| Year of first production | 1963 |
| Milling method | Washing |
| District name | Carpentaria |
|---|
| Type of mineral rights | Minerals Only |
|---|
| Ownership category | Private |
|---|
| Type | Owner |
|---|---|
| Owner | Conzinc Riotinto Of Australia Ltd. (Cra) |
| Interest | 67 |
| Home office | Australia |
| Year | 1987 |
| Type | Owner |
|---|---|
| Owner | Amp |
| Interest | 16.5 |
| Year | 1987 |
| Type | Owner |
|---|---|
| Owner | Others |
| Interest | 16.5 |
| Year | 1987 |
| Type | Operator |
|---|---|
| Owner | Comalco Aluminium Ltd. |
| Interest | 100 |
| Home office | Australia |
| Year | 1987 |
| Year | 1980 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 12877000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1981 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 11912000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1982 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 9589000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1983 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 9178000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 1243800 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 10438000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 10671000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1987 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Prioduction 12476000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1988 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore Production 13977000 Mtpy | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1981 | ||||||||||||||||||||||||||||
| Measured | 562000000mt ore | ||||||||||||||||||||||||||||
| Indicated | 1356000000mt ore | ||||||||||||||||||||||||||||
| Demonstrated | 1918000000mt ore | ||||||||||||||||||||||||||||
| Inferred | 3096000000mt ore | ||||||||||||||||||||||||||||
| Total resources | 5014000000mt ore | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 163000HA | ||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 6020350037 |
IBA REVIEW. JAN.-MAR. 1992, P. 13.
AUSTRALIA'S MINING WEEKLY. NOV. 1994, P. 33-34.
ANON., 1964, EXPANSION OF WEIPA TO START THIS YEAR, MINING
AND CHEMICAL ENGINEERING REVIEW, OCT., P. 32-33.
ANON., 1974, WEIPA BAUXITE, MINING MAGAZINE, JAN., P.12-21.
ANON., 1975 THROUGH 1979, ANNUAL REPORTS AND REPORTS TO THE
AUSTRALIAN STOCK EXCHANGES, COMALCO, LTD., SYDNEY.
BARTLETT, A.H. 1976, OPEN LETTER TO PROFESSOR E.H. ERIKSON,
EASTERN WASHINGTON STATE COLLEGE.
CHADWICK, J.R., 1981, WEIPA-THE WORLD'S LARGEST BAUXITE
MINE, WORLD MINING, JAN., P. 36-39.
EVANS, H.J., 1965, BAUXITE DEPOSITS OF WEIPA, GEOLOGY OF
AUSTRALIAN ORE DEPOSITS; EIGHTH COMMONWEALTH MINING AND
METALL. CONGRESS, AUSTRALIA AND NEW ZEALAND, 1965, THE
OFFICE OF THE CONGRESS AND THE AUSTRALIAN INSTITUTE OF
MINING AND METALLURGY, MELBOURNE.
FREE, G.D., 1978, MINING OPERATIONS AT WEIPA, NORTH
QUEENLAND CONFERENCE, 1978, AUSTRALASIAN INSTITUTE OF
MINING AND METALL., MELBOURNE.
MCDONALD, K.B., AND MORTIMER, R.R., 1978, RAIL HAULAGE AND
OFF-HIGHWAY TRUCK DEVELOPMENT AT WEIPA, NORTH QUEENLAND
CONFERENCE, 1978 AUSTRALASIAN INST. OF MINING AND METALL
MELBOURNE.
ROBERTS, R.H., 1977, BAUXITE MINING - WEIPA 1967-1977,
SOCIETY OF MINING ENGINEERS FALL MEETING, ST. LOUIS, MO.
OCT, P. 1-15.
| Subject category | Comment text |
|---|---|
| Deposit | AS REPORTED IN 1981, 70% OF WEIPA ORE CAME FROM THE ANDOOM MINE A FEASIBILITY STUDY IS BEING CONDUCTED TO DETERMINE THE FEASIBILITY OF BUILDING A REFINERY WITH A CAPACITY OF 1 MILLION MTPY. THE STUDY WILL TAKE 18 MO. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 17-JAN-1995 | Wilburn, David R. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.