| Deposit ID | 10183390 |
|---|---|
| MAS/MILS ID | 6020250006 |
| Record type | Site |
| Current site name | (Facility) Gove Mine and Refinery |
| Alternate or previous names | Gove |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 136.84898, -12.24734 (WGS84) |
| Elevation | 50 |
| Location accuracy | 10(meters) |
Political divisions (FIPS codes)
Northern Territory*(province)
Australia(country)
Australia(continent)
Land(continent)
| Country | State |
|---|---|
| Australia | Northern Territory* |
| Commodity | Importance |
|---|---|
| Aluminum Critical | Primary |
| Materials | Type of material |
|---|---|
| Boehmite | Unknown |
| Gibbsite | Unknown |
| Ore Body (1) | 136.84898, -12.24734 |
|---|
| Thickness | 0.04M | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 63M | ||||||||||||||||||||||||
| Width | 63M | ||||||||||||||||||||||||
| Depth to top | 3.5M | ||||||||||||||||||||||||
| |||||||||||||||||||||||||
| Area | 6300HA | ||||||
|---|---|---|---|---|---|---|---|
| |||||||
| Operation type | Surface |
|---|---|
| Development status | Plant |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1950 |
| Mining method | Open Pit |
| Year of first production | 1972 |
| Plant type | Refiner |
| Plant subcategory | Bayer |
| Milling method | Sizing |
| District name | Arnhem Land |
|---|
| Type of mineral rights | Minerals Only |
|---|
| Ownership category | Private |
|---|
| Type | Owner |
|---|---|
| Owner | Swiss Aluminum Australia Ltd. (Austraswiss) |
| Interest | 70 |
| Home office | Switzerland |
| Year | 1987 |
| Type | Owner |
|---|---|
| Owner | Gove Alumina Ltd., Also Known Gove Aluminium Ltd. |
| Interest | 30 |
| Home office | Australia |
| Year | 1987 |
| Type | Operator |
|---|---|
| Owner | Nabalco Pty. Ltd. |
| Interest | 100 |
| Home office | Australia |
| Year | 1987 |
| Year | 1972 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 2000000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1973 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Dido 2867000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1974 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Same 3632000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1976 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Period | 1975 To 1976 | ||||||||||||||
| Description | Bauxite Ore 1975 To 1976 4000000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1977 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 4800000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1978 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Dido 4500000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1979 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 4600000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1980 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 5178000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1981 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 4416000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1982 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Same 4531000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1983 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Dido 4956000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 5132000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 5612000 Mtpy | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Bauxite Ore 5059000 Mtpy | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1981 | ||||||||||||||
| Measured | 250000mt ore | ||||||||||||||
| Demonstrated | 250000mt ore | ||||||||||||||
| Total resources | 250000mt ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 6300HA | ||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 6020250006 |
ENGINEERING & MINING JOURNAL, AUGUST 1971, GOVE BAUXITE
PROJECT COMES ALIVE, P. 80-81.
MINING ENGINEERING, FEBRUARY 1978, MEASUREMENT AND CONTROL
DOWN UNDER: THE NABALCO GOVE ALUMINA PLANT, P. 163-165.
AUSTRALIAN MINING, DECEMBER 1971, BAUXITE-ALUMINA PROJECT OF
GOVE, P. 48-53.
DUNN, P.G., 1965, BAUXITE DEPOSITS OF GOVE PENINSULA, ARNHEM
LAND, GEOLOGY OF ORE DEPOSITS, P. 216-218.
WORLD MINING, AUGUST 1972, GOVE BAUXITE OPENING UP
ANNUAL REPORTS, 1977 THROUGH 1980, PEKO WALLSEND LIMITED,
SYDNEY.
AUSTRALIAN DEPARTMENT OF TRADE AND RESOURCES, 1980,
AUSTRALIAN ALUMINUM INDUSTRY SUPPLY POTENTIAL,
AUSTRALIAN GOVERNMENT PUBLISHING SERVICE, CANBERRA.
AUSTRALIAN MINERAL INDUSTRY ANNUAL REVIEW, 1968-1978, BUREAU
OF MINERAL RESOURCES, GEOLOGY & GEOPHYSICS, AUSTRALIAN
GOVERNMENT PUBLISHING SERVICE, CANBERRA.
ANNUAL REPORTS, 1970 THROUGH 1980, CSR LIMITED, SYDNEY.
LILLEHAGEN, N.B., 1980, THE ESTIMATION AND MINING OF GOVE
BAUXITE RESERVES, ESTIMATION AND STATEMENT OF MINERAL
RESERVES, THE AUSTRALIAN INSTITUTE OF MINING &
METALLURGY, MELBOURNE.
AMERICAN METAL MARKET, MAY 12, 1970.
MINING AND CHEMICAL ENGINEERING REVIEW, MARCH 15, 1963, P.46
SOMM, A., BAUXITE DEPOSITS OF GOVE PENINSULA, NORTHERN
TERRITORY, AUSTRALIA, 12TH PACIFIC SCIENCE CONGRESS,
PACIFIC SCIENCE ASSOCIATION, AUSTRALIAN ACADEMY OF
SCIENCE, RECORD OF PROCEEDINGS, CANBERRA, 1971, P. 433.
MINING ENGINEERING, JUNE 1970.
GRUBB, P.L.C., 1970, MINERALOGY, GEOCHEMISTRY, AND GENESIS
OF THE BAUXITE DEPOSITS ON THE GOVE AND MITCHELL
PLATEAUX, NORTHERN AUSTRALIA, MINERAL. DEPOSITA (BERL.)
5, P. 248-272.
ERROL C. SEHNKE, TRIP REPORT FOR TRAVEL TO AUSTRALIA,
(NOV. 30, 1992).
| Subject category | Comment text |
|---|---|
| Deposit | ACCESS ROADS, POWER AND WATER ARE ALL LOCATED AT OR NEAR THE GOVE TOWNSITE, MINE, AND CRUSHING PLANT. THE OWNERS PLAN TO INVEST SF150 MILLION TO MODERNIZE THE PLANT AND RAISE CAPACITY BY 150,000 MT TO ABOUT 1.6 MILLION MT. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 14-SEP-1995 | Wilburn, David R. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.