| Deposit ID | 10183650 |
|---|---|
| MAS/MILS ID | 6020150016 |
| Record type | Site |
| Current site name | New Broken Hill M. |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | 141.46543, -31.96292 (WGS84) |
| Elevation | 300 |
| Location accuracy | 5000(meters) |
Political divisions (FIPS codes)
New South Wales(province)
Australia(country)
Australia(continent)
Land(continent)
| Country | State |
|---|---|
| Australia | New South Wales |
| Commodity | Importance |
|---|---|
| Lead | Primary |
| Silver | Primary |
| Zinc Critical | Primary |
| Materials | Type of material |
|---|---|
| Chalcopyrite | Unknown |
| Galena | Unknown |
| Sphalerite | Unknown |
| Ore Body (1) | 141.46543, -31.96292 |
|---|
| Dip | 30S | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Thickness | 850M | ||||||||||||||||||||
| Length | 7300M | ||||||||||||||||||||
| Width | 250M | ||||||||||||||||||||
| |||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | No |
| Discovery year | 1883 |
| Year of first production | 1936 |
| District name | Broken Hills District |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | New Broken Hill Consolidated, Ltd. |
| Interest | 100 |
| Home office | Australia |
| Year | 1981 |
| Type | In-situ | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1981 | ||||||||||||||||||||||||||||
| Measured | 7000000mt ore | ||||||||||||||||||||||||||||
| Demonstrated | 7000000mt ore | ||||||||||||||||||||||||||||
| Inferred | 100000000mt ore | ||||||||||||||||||||||||||||
| Total resources | 107000000mt ore | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Type | In-situ | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1981 | ||||||||||||||||||||||||||||
| Inferred | 60000000mt ore | ||||||||||||||||||||||||||||
| Total resources | 60000000mt ore | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overall depth | 931M | ||||||||||||||||||||||||
| |||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 6020150016 |
ANNUAL REPORT OF CONZINC RIO TINTO OF AUSTRALIA LTD, 1979.
MINER NEWSPAPER, AUGUST 17-30, P. 1.
PRATTEN,R.D.,PB-ZN-AG ORE DEP.OF THE ZN CORP.& NEW BROKEN
HILL CONSOL.MINES,BROKEN HILL,GEOL.AUST.ORE DEP.,8TH
COMMONWEALTH MIN.& METAL.CONG.,1965,PP.333-335.
O'DRISCOLL,E.S.,THE ZN CORP.& NEW BROKEN HILL CONSOL.MINES,
GEOL.OF AUST.ORE DEP.,5TH EMPOR.MIN.& METAL.CONG.,VOL.1,
1953,PP.658-673.
MIN.& GEOL.STAFF,EXPLOR.& MIN.OPER.,THE ZN CORP.,LTD,NEW
BROKEN HILL CONSOL.,LTD.,BROKEN HILL,AUST.,CH.18,AIME WORLD
SYMPOS.ON MIN.& METAL.OF PB & ZN,VOL.1,1970,PP.301-326.
AM&S ACTION AT BROKEN HILL, MINING MAGAZINE,
JUNE 1980, P. 563.
AUST.MIN.YEARBOOK,1976,PP.24,29.
WORLD MIN.YEARBOOK,CATALOGUE,& SURVEY DIR.,JUNE,1976,P.137.
MIN.JOUR.,MIN.ANNUAL REV.,AUST.MIN.& SMELT.,1976.
ENGNG.MIN.JOUR.,THE FIRST DECLINE SHAFT,MAY,1976,P.313.
ENGNG.MIN.JOUR.,CONZINC RIOTINTO OF AUST.,LTD.,9/76,P.313.
AUST.MINER.INDUST.ANN.REV.,1972,PP.198-199,340;1973,
PP.186,& 325
ENGNG.& MIN.JOUR.INTER.DIR.,1975,P.203.
"AUSTRALIAN MINING & SMELTING", MINING ANNUAL
REVIEW, 1979, P. 397.
MIN.JOUR.,CAVING AFFECTS,BROKEN HILL MINE,OCT.1973,P.299.
MIN.JOUR.,DISPUTE AT BROKEN HILL,JUNE,1968,P.473.
ENGNG.MIN.JOUR.,DEC.1973,P.130;JUNE 1973,P.281.
MINERALS SOURCEBOOK,NOV.1973.
WORLD MIN.,CAVE-IN AT BROKEN HILL WILL CUT ORE OUTPUT 10%,
NOV.1973.
AUST.MIN.,3/15/67,P.72;8/15/66,P.47;6/15/66,P.41;9/15/66,
PP.87,&141.
"BROKEN HILL ORE DEPOSITS", 25TH INTERNATIONAL
GEOLOGICAL CONGRESS, EXCURSION 1B, PP. 2-14.
MIN.JOUR.,THE NEW BROKEN HILL,CONSOL.,MAY,1963,P.440;APRIL,
1964,P.325,&331;JAN.,1964.
MIN.MAG.,SEPT.1976,P.239
CRA, FIRST HALF RESULTS, MINING JOURNAL, SEPTEMBER
14, 1979, PP. 228-229.
EM&J, INTERNATIONAL DIRECTORY OF MINING, 1980.
EXTRACT FROM - THE CONSOLIDATED ZINC CORPORATION
LIMITED, SUPPLIED BY NEW SOUTH WALES DEPARTMENT
OF MINING AND ENERGY - COMPLETE SOURCE OF THIS
EXTRACT NOT GIVEN.
LOUTHEAN, R. (ED.) REGISTER OF AUSTRALIA MINING,
1980 EDN., ROSS LOUTHEAN PUBLISHING, 1980.
MINING ANNUAL REVIEW, 1979.
NEW BROKEN HILL CONSOLIDATED - OWNED BY CONZINC
REO TINTO THROUGH AUSTRALIAN MINING AND SMELTING
WOODLAWN MINE, MINING MAGAZINE, JULY 1979.
NIGHTINGALE, W.G. (ED.), FINANCIAL TIMES MINING
INTERNATIONAL YEARBOOK, 1980, LONGMAN, LONDON.
OPERATIONS HANDBOOK, THE ZINC CORPORATION LIMITED,
NEW BROKEN HILL CONSOLIDATED LIMITED, THE SOUTHERN
POWER CORPORATION PTY. LIMITED, BROKEN HILL, NEW
SOUTH WALES, AUSTRALIA, PRINTED 1978.
PRATTEN, R.D., "LEAD-ZINC-SILVER ORE DEPOSITS OF
THE ZINC CORPORATION AND NEW BROKEN HILL
CONSOLIDATED MINES, BROKEN HILL" IN ECONOMIC
GEOLOGY OF AUSTALIAN AND PAPUA NEW GUINEA. 1
METALS, MONOGRAPH SERIES NO. 5, AUSTRALIAN INSTITUTE
OF MINING AND METALLURGY, MELBOURNE, 1975, PP.333-
335.
RIDGE, J.D., ANNOTATED BIBLIOGRAPHIES OF MINERAL
DEPOSITS IN AFRICA, ASIA, (INCLUSIVE OF THE USSR)
AND AUSTRALASIA, PENNSYLVANIA STATE UNIVERSITY,
PERGAMON PRESS, NEW YORK, 1976.
"THE MINING CENTRES OF SOUTHERN AND WESTERN AUSTRALIA",
25TH INTERNATIONAL GEOLOGICAL CONGRESS, EXCURSION
50A, 3 AUGUST - 13 AUGUST 1976, EXCURSION 50C,
25 AUGUST - 4 SEPTEMBER 1976, PP. 37-43.
WOODCOCK, J.T. (ED.), MINING AND METALLURGICAL
PRACTICES IN AUSTRALIA, THE SIR MAURICE MAWBY
MEMORIAL VOLUME, PUBLISHED BY THE AUSTRALIAN
INSTITUTE OF MINING AND METALLURGY, MONOGRAPH
SERIES NO. 10, 1980.
| Subject category | Comment text |
|---|---|
| Deposit | PAGE A-10.IN 1974 ORE GRADE IMPROVED TO 9.3% PB,70G/MT AG,& ZN REMAINED AT 11.9% 76-RCD-040-LABOR SUPPLY,NO.EMPLOYED,SURFACE-329,UNDERGD-843. 76-RCD-080-DRIV.& CROSSCUTTING-2913.9M;RISING-415.3M,WINZ.- 2.9M,MIN.TIMBER USED-7180 CU.METERS,EXPLOS.-333160KG,WATER- 31560 MEGALITERS,ELECT.-37083033KWH,COMP.AIR-86280 CU.METER 76-RCD-050-DIAMOND DRILLING-19137 METERS. ORE BREAKING STATS.UNDERCUT & FILL-54135 TONS,5.66% OF TOTAL ,LOADER CUT & FILL-195290T,20.4%;CUT & FILL OPEN STOPES- 255721T,26.71%;CUT & FILL TIMBER STOPES-148150T,15.48%; SHRINK STOPES-225498T,23.56%;UP-HOLE STOPES-34238T,3.58%; DEVELOPMENT-35749T,3.73%;OTHER-8465T,0.88% |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 27-FEB-84 | Eastern Field Operations Center (EFOC) | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.