Newmont's Carlin Trend Operations

Plant in Eureka county in Nevada, United States with commodities Gold, Mercury, Silver
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Public Land Survey System information
  6. Commodities
  7. Materials information
  8. Nearby scientific data
  9. Ore body information
  10. Economic information about the deposit and operations
  11. Mining district
  12. Mineral rights holdings
  13. Land status
  14. Ownership information
  15. Production statistics
  16. Reserves and resources
  17. Workings at the site
  18. Links to other databases
  19. Bibliographic references
  20. Reporter information

Geologic information

Identification information

Deposit ID 10197650
MAS/MILS ID 0320110230
Record type Site
Current site name Newmont's Carlin Trend Operations
Alternate or previous names Carlin Gold Mining Co., See Comments

Geographic coordinates

Point of reference Plant
Geographic coordinates: -116.15312, 40.9141 (WGS84)
Elevation 1926
Location accuracy 100(meters)

Site location context

Political divisions (FIPS codes)

Elko(county)

Nevada(state)

United States(country)

North America(continent)

Land(continent)

USGS map quadrangles

Swales Mountain NW(quadrangle 1:24,000 scale)

Battle Mountain(quadrangle 1:100,000 scale)

Winnemucca(quadrangle 1:250,000 scale)

Hydrologic units (watersheds)

Upper Humboldt(hydrologic unit)

Humboldt(hydrologic accounting unit)

Black Rock Desert-Humboldt(hydrologic subregion)

Great Basin(hydrologic region)

Federal lands

Bureau of Land Management(Bureau of Land Management NV)

Bureau of Land Management NV BLM(Type of land area)

BLM(Federal land areas administered by BLM)

Geographic areas

Country State County
United States Nevada Eureka

Public Land Survey System information

Meridian Township Range Section Fraction State
Mount Diablo 035 N 050 E 14 NE Nevada

Commodities

Commodity Importance
Gold Primary
Mercury Tertiary
Silver Secondary

Materials information

Materials Type of material
Gold Unknown

Nearby scientific data

Plant (1) -116.15312, 40.9141

Economic information

Ore body information

  • Field Value
    MAS Matrix # 1
    MAS Column # 1
    Type of Orebody #1 SHEAR ZONE
    Shape of Orebody #1 TABULAR
    Primary mode of Origin HYDROTHERMAL
    Primary Ore Control FAULTING
    Degree of Wallrock Alter. UNKNOWN
    Type of Wallrock Alter. #1 SERICITIC
    Date of Last Modification 840329

Comments on the geologic information

  • AT THE CARLIN ORE BODY, GOLD MINERALIZATION HAS NOT PROVEN TO BE CLOSELY RELATED TO OTHER ASSOCIATED METALS; THOSE METALS MOST ABUNDANT WITHIN THE AREA ARE ANTIMONY, ARSENIC, BARIUM, MANGANESE, AND STRONTIUM.
  • THE GOLD ORE BODY AT CARLIN IS AN IRREGULAR-SHAPED STRATIFORM TABULAR MASS, AN ESTIMATED 2,000 M LONG, 800 M WIDE, AND 100 M DEEP WHERE EXPOSED IN THE MINE. THE BLUE STAR DEPOSIT IS SIMILAR TO CARLIN IN ORIGIN AND TYPE. THE MINE IS MUCH SMALLER, HOWEVER. IT IS TABULAR, 365 M LONG, 200 M DEEP AND APPROXIMATELY 90 M THICK. THE MAGGIE CREEK IS DISSIMILAR TO THE OTHERS. IT IS ESTIMATED TO BE 460 BY 120 M IN PLAN AND ABOUT 40 M IN THICKNESS. THE GOLD QUARRY DEPOSIT IS PIPELIKE IN CHARACTER, WITH ESTIMATED DIMENSIONS OF 620 BY 460 M, AND 250 M IN DEPTH.

Economic information about the deposit and operations

Operation type Surface-Underground
Development status Plant
Commodity type Metallic
Significant Yes
Discovery year 1962
Mining method Combined Methods
Year of first production 1965
Plant type Leach
Plant subcategory Solvent Extraction-Electrowin
Milling method Carbon-In-Leach-Electrowin

Mining district

District name Carlin Trend

Mineral rights holdings

Type of mineral rights Located Claim
Type of mineral rights Patented
Type of mineral rights Private Lease

Land status

Ownership category Mixed

Ownership information

  • Type Owner-Operator
    Owner Newmont Gold Co. (Newmont Mining Corp.)
    Interest 100
    Home office Colorado
    Year 1996
    First year 1961

Production statistics

  • Year 1962
    Description Gold Ore Grading 10.97 Gm/Mt 10099999 Mt Ore/Day
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Gold Gold 11g/mt
  • Year 1983
    Description Milled Ore 730000 Metric Tons Of Ore
  • Year 1983
    Description Leached Ore 820000 Metric Tons Of Ore
  • Year 1984
    Description Milled Ore 850000 Metric Tons Of Ore
  • Year 1984
    Description Leached Ore 800000 Metric Tons Of Ore
  • Year 1985
    Description Milled Ore 1800000 Metric Tons Of Ore
  • Year 1985
    Description Leached Ore 840000 Metric Tons Of Ore
  • Year 1986
    Description Milled Ore 3560000 Metric Tons Of Ore
  • Year 1986
    Description Leached Ore 3430000 Metric Tons Of Ore
  • Year 1993
    Description Mill Ore 13493465 Mt/Yr
  • Year 1993
    Description Leach Ore 51047285 Mt/Yr
  • Year 1994
    Description Mill Ore 12531850 Mt/Yr
  • Year 1994
    Description Leach Ore 47232574 Mt/Yr
  • Year 1995
    Description Mill Ore 13628636 Mt/Yr
  • Year 1995
    Description Leach Ore 45988823 Mt/Yr
  • Year 1996
    Description Gold Production 1542214 T Oz Au/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Gold Gold 47968223.84g

Comments on the production information

  • 1993-1995 TOTAL NEWMONT CARLIN PRODUCTION.

Reserves and resources

  • Type In-situ
    Estimate year 1994
    Measured 303893280mt ore
    Demonstrated 303893280mt ore
    Total resources 303893280mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 1.8171 g/mt Gold Major 1994
  • Type In-situ
    Estimate year 1994
    Demonstrated 249032190mt ore
    Total resources 249032190mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 1.5429 g/mt Gold Major 1994
  • Type In-situ
    Estimate year 1995
    Measured 299327419mt ore
    Demonstrated 299327419mt ore
    Total resources 299327419mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 1.9199 g/mt Gold Major 1995
  • Type In-situ
    Estimate year 1995
    Demonstrated 259603614mt ore
    Total resources 259603614mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 1.7486 g/mt Gold Major 1995
  • Type In-situ
    Estimate year 1996
    Measured 331880000mt ore
    Demonstrated 331880000mt ore
    Total resources 331880000mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 1.95 g/mt Gold Major 1996
  • Type In-situ
    Estimate year 1996
    Demonstrated 168735455mt ore
    Total resources 168735455mt ore
    Commodity Subtype Grade units Group Importance Year
    Gold Au 2.2286 g/mt Gold Major 1996

Comments on the reserve resource information

  • (R-RECORDS 2-7; RESERVES/RESOURCES DATA FOR ALL NEWMONTS * CARLIN TREND OPERATIONS:) * (FOR RESERVE/RESOURCES SUMMARY DATA SEE INDIVIDUAL FILES:) * 1987 ESTIMATES INCLUDE RESERVES FROM THE CARLIN, PETE, POST, GENESIS/NORTH STAR, BLUESTAR, GOLD QUARRY, MAGGIE CREEK, & RAIN DEPOSITS. NO BIBLIOGRAPHY SOURCE FOUND FOR 1987 RESERVES DATA.
  • Q1C1=Q2C1+Q3C1+Q4C1. Q1CL=TOTAL MILLABLE ORE FROM THE CARLIN, BLUE STAR, MAGGIE CREEK, GOLD QUARRY, AND RAIN DEPOSITS. THE WEIGHTED AVERAGE GRADE OF GOLD IS 4.11 GM/MT Q1C2+Q3C2+Q4C2. Q1C2=TOTAL HEAP LEACH ORE FROM HE MAGGIE CREEK. GOLD QUARRY AND RAIN DEPOSITS. THE WEIGHTED AVERAGE AU GRADE IS 1.12 GM/MT. CARLIN, BLUE STAR, AND MAGGIE CREEK MILLABLE ORE TO BE PROCESSED AT THE EXISTING CARLIN MILL. MAGGIE CREEK HEAP LEACH ORE. GOLD QUARRY MILLABLE ORE. GOLD QUARRY HEAP LEACH ORE. RAIN DEPOSIT MILLABLE ORE. RAIN DEPOSIT HEAP LEACH ORE. BOOTSTRAP DEPOSIT HAS BEEN MINED OUT. TOTAL INDICATED RESOURCE FOR ALL THE CARLIN AND ASSOCIATED DEPOSITS AS OF 1986. CARLIN AND MAGGIE CREEK MILL & LEACH AS OF 1986. TOTAL GOLD QUARRY MILL AND LEACH ORE, AS OF 1986. TOTAL RAIN MILL AND LEACH ORE AS OF 1986. TOTAL GEOLOGIC RESOURCE CONTAINED IN THE BOOTSTRAP DEPOSIT AS OF 1986.

Workings at the site

  • Type of workings Surface
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ACTUAL
    Mining Method OPEN PIT
    Percent Waste Rock 99.9
    Primary Material Cover M-HARD ROCKS
    Hardness of Ore M-HARD ROCKS
    Avg. Bench Height (meters) 6.1
    Capacity 2115
    Capacity Units MT ORE/DAY
    Unit Production Cost 9.48
    Units of Production $/MT ORE
    Operating Days per Year 350
    Operating Shifts per Day 2
    Year of Information 1983
  • Type of workings Surface
    Field Value
    MAS Development Schedule # 1
    Mining Record # 2
    Status of Mining Method ESTIMATE
    Mining Method OPEN PIT
    Percent Waste Rock 99.9
    Primary Material Cover M-HARD ROCKS
    Hardness of Ore M-HARD ROCKS
    Avg. Bench Height (meters) 6.1
    Capacity 2380
    Capacity Units MT ORE/DAY
    Unit Production Cost 9.48
    Units of Production $/MT ORE
    Operating Days per Year 210
    Operating Shifts per Day 3
    Year of Information 1983
  • Type of workings Underground
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ACTUAL
    Mining Method COMBINED METHODS

Comments on other economic factors

  • PRESENTLY MINING OPERATIONS ARE PROCEEDING AT THE CARLIN, BLUE STAR, AND MAGGIE CREEK OPEN PITS, PROCESSING OPERATIONS ENTAIL A LOW GRADE HEAP LEACH OPERATION NEAR THE MAGGIE CREEK PIT AND A CYANIDE AGITATION LEACH CIRCUIT NEAR THE CARLIN PIT. THE BOOTSTRAP PIT IS PRESENTLY DEPLEATED OF ORE AND THUS INACTIVE. PLANS ARE UNDERWAY TO BRING THE GOLD QUARRY DEPOSIT INTO PRODUCTION IN 1986. THE RAIN DEPOSIT WILL BE PLACED INTO PRODUCTION AT A LATER DATE. TOTAL SURFACE AEA OF THE CARLIN EPOSITS IS 104,000 HECTARES. UNIT PRODUCTION COST SHOWN IS FOR 1983-84. SEE INVESTMENTS DATA SET FOR CHANGES IN FUTURE (PROPOSED). S-INV IS TOTAL MINE INVESTMENTS THROUGH 1984, INCLUDING ALL INFRASTRUICTURE CAPITAL COSTS, AND NOT DIFFERENTIATING BE- TWEEN THE MILLABLE GRADE ORE AND THE HEAP LEACHING OPERATION CAPACITY FOR THE CALIN MINE MILLABLE ORES IS 2,115 MT/D, AND FOR HEAP LEACH ORES IS 2380 MT/D. SURFACE AREA COVERED BY THE DEPOSITS AND MILLS IS 104,000 HECTARES.
  • EQUIPMENT: THIS IS A LIST OF THE MINE EQUIPMENT USED AT THE CARLIN, BLUE STAR, AND MAGGIE CREEK DEPOSITS: DESCRIPTION QUANTITY T-750 CP DRILLS, 165-200 MM DIA. 4 D40K DRILL TECK, 165 MM DIA. 1 DRILL TRUCKS 2 SHOVEL, DIESEL-ELECTRIC, 3.8 CU M BUCKET 1 CAT 992B LOADERS, 7.6 CU M BUCKET 2 IHC LOADER, 8.4 CU M BUCKET 1 CAT 988B LOADER, 5.3 CU M BUCKET 1 IHC LOADER, 4.6 CU M BUCKET 1 CAT 988 LOADER, 4.6 CU M BUCKET 1 HAUL TRUCKS, 68 MT 10 HAUL TRUCKS, 45 MT 4 CAT 14E GRADER 2 CAT D8 DOZER 3 MICHIGAN 280 DOZER, RUBBE TIRED 1 WATER TRUCK 2 FUEL TRUCK 1 LUBE TRUCK 1

Reference information

Bibliographic references

  • Production

    THE NORTHERN MINER. 2/24/97. P.B1.

  • Reserve-Resource

    NEWMONT MINING CORPROATION, 1994 ANNUAL REPORT

  • Reserve-Resource

    NEWMONT MINING CORPORATION, FORM 10-K, 1994.

  • Reserve-Resource

    NEWMONT MINING CORPROATION, 1995 ANNUAL REPORT

  • Reserve-Resource

    NEWMONT MINING CORPORATION, FORM 10-K, 1995.

  • Deposit

    E/MJ. CARLIN GOLD. JULY 1982.

  • Deposit

    NEWMONT MINING CORP. 1980 ANNUAL REPORT

  • Deposit

    NEWMONT MINING CORP. 1981 ANNUAL REPORT.

  • Deposit

    NEWMONT MINING CORP. 1982 ANNUAL REPORT

  • Deposit

    MINING JOURNAL. NEW GOLD HORIZONS. APRIL 1, 1983

  • Deposit

    ARIZONA PAY DIRT. NEVADA GOLD PRODUCTION UPWARD, SETTING

  • Deposit

    RECORDS, APRIL 1, 1983.

  • Deposit

    FORTUNE. THE HUGE FIND IN ROY ASH'S BACKYARD, DEC. 22, 1982.

  • Deposit

    LAWRENCE, W.R., J.D. MCBETH, AND R. A. PYPER, HEAP LEACHING

  • Deposit

    GOLD ORE AT CARLIN GOLD'S MAGGIE CREEK. CARLIN GOLD MINING

  • Deposit

    CO., 1982.

  • Deposit

    MINING CONGRESS JOURNAL, JANUARY 1982

  • Deposit

    INTERMOUNTAIN PAY DIRT, NEWMONT REPORTS, APRIL 1982.

  • Deposit

    ELEVATORSKI, E.A., LYNN DISTRICT, DISSEMINATED/REPLACEMENT

  • Deposit

    GOLD DEPOSITS

  • Deposit

    INTERMOUNTAIN PAY DIRT. MAJOR DISCOVERIES PROMISE BIG SURGE

  • Deposit

    IN U.S. GOLD PRODUCTION, NOV. 1981.

  • Deposit

    THE MINING RECORD. CARBON ADSORPTION METHOD FOR PROCESSING

  • Deposit

    GOLD ORE, JULY 21, 1982.

  • Deposit

    THE WALL STREET JOURNAL. NEWMONT'S RESERVES OF GOLD ARE

  • Deposit

    RAISED TO SEVEN MILLION OUNCES, NOV. 10, 1981.

  • Deposit

    THE NEVADA MINING ASSOCIATION BULLETIN. NEWMONT'S NEW NEVADA

  • Deposit

    GOLD DISCOVERY MAY QUADRUPLE RESERVES, JUNE 1981.

  • Deposit

    NEW MEXICO PAY DIRT. NEWMONT'S NEVADA GOLD RESERVES GROW BY

  • Deposit

    ANOTHER 3.1 MILLION OUNCES. MAY, 1981.

  • Deposit

    MINING CONGRESS JOURNAL. CONSTRUCTON OF A PROCESSING MILL.

  • Deposit

    APRIL 1981.

  • Deposit

    THE MINING RECORD. NEVADA MINING DEVELOPMENT, MAR. 11, 1981.

  • Deposit

    MINING CONGRESS JOURNAL. INDICATIONS OF AN ORE BODY CON-

  • Deposit

    TAINING ONE MILLION OUNCES, FEB. 1981.

  • Deposit

    BIG SKY PAY DIRT. NEWMONT DISCOVERS ANOTHER MILLION OUNCES

  • Deposit

    OF GOLD NEAR CARLIN OPERATIONS. JAN. 1981.

  • Deposit

    MCBETH, J.D., MINING PRACTICE AT CARLIN GOLD MINING COMPANY.

  • Deposit

    INTERMOUNTAIN PAYDIRT. NEWMONT FINDS ANOTHER MILLION OUNCES

  • Deposit

    OF GOLD NEAR CARLIN. DEC 1980.

  • Deposit

    INTERMOUNTAIN PAYDIRT, OF MICE AND MEN. AUG. 1980.

  • Deposit

    GUAY, W.J., HOW CARLIN TREATS GOLD ORES BY DOUBLE OXIDATION,

  • Deposit

    WORLD MINING, MAR. 1980.

  • Deposit

    INTERMOUNTAIN PAYDIRT, NEWMONT'S CRLIN BEGINS PRODUCTION

  • Deposit

    FROM MAJOR NEW NEVADA GOLD DEPOSIT. SEPT. 1980.

  • Deposit

    RADKE, A.S., R.O. RYE, AND F.W. DICKENSON, GEOLOGY AND STA-

  • Deposit

    BLE ISOTOPE STUDIES OF THE CARLIN GOLD DEPOSIT, NEVADA.

  • Deposit

    ECONOMIC GEOLOGY, VOL. 75, NO. 5, AUG. 1980.

  • Deposit

    MNING CONGRESS JOURNAL. PLANS FOR DEVELOPMENT AND PRODUC-

  • Deposit

    TION OF GOLD BULLION. OCT. 1980.

  • Deposit

    MINING CONGRESS JOURNAL. DISCOVERY OF A MAJOR NEW GOLD ORE

  • Deposit

    BODY. JULY 1980.

  • Deposit

    THE MINING RECORD. CARLIN MINE LARGEST OPEN-PIT GOLD MINE IN

  • Deposit

    U.S. WED., NOV. 29, 1978.

  • Deposit

    WORLD MINING. CARLIN OPENS NEW PIT AT NEVADA GOLD MINE.

  • Deposit

    FEB. 1977.

  • Deposit

    MCBETH, J.D. CYANIDATION PRACTICE AT CARLIN GOLD MINING.

  • Deposit

    COMPANY. AIME ANNUAL MEETING, FEB. 1975.

  • Deposit

    NEWMONT MINING CORPORTATION. CARLIN GOLD MINING COMPANY, AN-

  • Deposit

    NUAL REPORTS, 1965, 1967-1974.

  • Deposit

    MCQUISTON, F.W., AND R.W. HEMLUND. NEWMONT'S CARLIN GOLD

  • Deposit

    PROJECT. MINING CONGRESS JOURNAL, NOV. 1965.

  • Deposit

    GUAY, W.J., AND D.G. PETERSON, RECOVERY OF GOLD FROM CAR-

  • Deposit

    BONACEOUS ORES AT CARLIN NEVADA. SME-AIME, TRANSACTIONS

  • Deposit

    VOL. 254, MARCH 1973.

  • Deposit

    PIZZARO, R., J.D. MCBETH, AND G.M. POTTER. HEAP LEACHING

  • Deposit

    PRACTICE AT THE CARLIN GOLD MINING COMPANY, CARLIN, NEVADA.

  • Deposit

    ARIZONA PAY DIRT. GOLD MINING PROFIT DEPENDS ON WHO'S DOING

  • Deposit

    IT AND WHERE. NOV 1982.

  • Deposit

    LONCOR, P.N. THE CARLIN GOLD MINING OPERATION. THE CARLIN

  • Deposit

    GOLD MINING COMPANY.

  • Deposit

    MINING JOURNAL. GOLD QUARRY AND RAIN RESERVES. APR. 8, 1983.

  • Deposit

    THE MINING RECORD, JAN. 5, 1983.

  • Deposit

    MINING AND MATERIALS, SEPT. 1980.

  • Deposit

    STANDARD AND POORS NEWS, SEPT 5, 1980.

  • Deposit

    STANDARD AND POORS NEWS, DEC. 11, 1980.

  • Deposit

    WORLD MINING, AUG. 1981.

  • Deposit

    MINING ENGINEERING, SEPT, 1979.

  • Deposit

    MINING CONGRESS JOURNAL, NOV. 1982.

  • Deposit

    MINING ENGINEERING, OCT. 1982.

  • Deposit

    THE MINING RECORD, NOV. 3, 1982.

  • Deposit

    SKILLING'S MINING REVIEW. APR 17, 1982.

  • Deposit

    MINING JOURNAL, NOV. 11, 1983.

  • Deposit

    WORLD MINING. UNITED STATES OPEN PIT AND UNDERGROUND MINE

  • Deposit

    TONNAGES. SEPT. 1982, SEPT. 1980, JULY, 1977.

  • Deposit

    HARDIC, B.S., CARLIN GOLD MINE, LYNN DISTRICT, NVEADA. NEW-

  • Deposit

    MONT EXPLORATION, LTD.

  • Deposit

    HOUSEN, D.M., AND P.F. KERR, FINE GOLD OCCURANCE AT CARLIN,

  • Deposit

    NEVADA. GRATON-SALES, ORE DEPOSITS OF THE UNITES STATES,

  • Deposit

    1933-1967, VOL 1.

  • Deposit

    CARLIN GOLD MINING COMPANY BOOTSTRAP MINE, CARLIN, NEVADA.

  • Deposit

    GOLD AND SILVER CYANIDATION PRACTICE, VOL. 2, AIME, 1980.

  • Deposit

    CARLIN GOLD MINING COMPANY. GOLD AND SILVER CYANIDATION

  • Deposit

    PLANT PRACTICE, AIME 1975.

  • Deposit

    MORRISON-KNUDSON COMPANY, INC.-MINING GROUP. MINE DEPOSIT

  • Deposit

    FILE REPORT; CARLIN, BLUE STAR, MAGGIE CREEK, BOOTSTRAP,

  • Deposit

    GOLD QUARRY, AND RAIN DEPOSITS, CARLIN GOLD MINING COMPANY,

  • Deposit

    CARLIN, NEVADA, DRAFT REPORT, DEC. 1983, USBM CONTRACT NO.

  • Deposit

    S0221028.

  • Deposit

    NEWMONT MINING CORPORATION, 1993 ANNUAL REPORT

  • Deposit

    RANDOL, 1994/95, MINING DIRECTORY, U.S. MINES AND MINING

  • Deposit

    COMPANITS.

  • Deposit

    RANDOL, 1996/97, MINING DIRECTORY, U.S. MINES AND MINING

  • Deposit

    COMPANIES.

  • Deposit

    1995/96, NEVADA MINES DIRECTORY.

  • Deposit

    1996, AMERICAN MINES HANDBOOK.

  • Deposit

    MAJOR MINES OF NEVADA, 1995, NEVADA BUREAU OF MINES AND

  • Deposit

    GEOLOGY, SPE. PUB. P-7.

  • Deposit

    THE MINING RECORD, VOL., 107, #?, SEPT., 4, 1996, P46.

  • Deposit

    THE MINING RECORD, VOL., 107, #45, NOV., 6 1996, P3.

  • Deposit

    THE NORTHERN MINER, JUNE 3, 1996, PP. B1, B4.

  • Deposit

    PAY DIRT, N691, JAN. 97, P12,13.

  • Deposit

    SOUTHWESTERN PAY DIRT, #697, JULY 1997, P13.

  • Deposit

    SEE CARLIN PROPERTY FILE 0320110027 FOR MORE BIBLIOGRAPHY.

Reporter information

Type Date Name Affiliation Comment
Reporter 08-OCT-97 Buckingham, David A. U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.

Authoritative Nevada resources

These are landing pages for further research — the state agencies don't currently expose per-mine deep links.