| Deposit ID | 10230839 |
|---|---|
| MAS/MILS ID | 3510230115 |
| Record type | Site |
| Current site name | Germano Mine |
| Alternate or previous names | Samarco Germano |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -42.87893, -20.39107 (WGS84) |
Political divisions (FIPS codes)
Minas Gerais(province)
Brazil(country)
South America(continent)
Land(continent)
| Country | State |
|---|---|
| Brazil | Minas Gerais |
| Commodity | Importance |
|---|---|
| Iron | Primary |
| Materials | Type of material |
|---|---|
| Feldspar | Unknown |
| Hematite | Unknown |
| Mica | Unknown |
| Quartz | Unknown |
| Ore Body (1) | -42.87893, -20.39107 |
|---|
| Thickness | 100M | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 3500M | ||||||||||||||||||||||||
| Width | 2000M | ||||||||||||||||||||||||
| |||||||||||||||||||||||||
| Operation type | Surface |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Mining method | Open Pit |
| Year of first production | 1977 |
| Milling method | Flotation |
| Type | Operator |
|---|---|
| Owner | Samarco Mineracoa S. A. |
| Year | 1982 |
| Type | Owner |
|---|---|
| Owner | S. A. Mineracao Da Trinidade - Samitri |
| Interest | 51 |
| Year | 1982 |
| Type | Owner |
|---|---|
| Owner | Utah International, Inc. |
| Interest | 49 |
| Year | 1982 |
| Type | In-situ | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1981 | |||||||||||||||||||||
| Measured | 379440000mt ore | |||||||||||||||||||||
| Demonstrated | 379440000mt ore | |||||||||||||||||||||
| Total resources | 379440000mt ore | |||||||||||||||||||||
| ||||||||||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 650HA | ||||||||||||||||||||||||
| |||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 3510230115 |
E/MJ, SAMARCO: MAJOR NEW MATERIALS HANDLING CONCEPTS FOR
IRON ORE, NOVEMBER, 1975, PP 125-128.
SKILLINGS, JR., DAVID N., SAMARCO OPERATING MAJOR NEW IRON
ORE DEVELOPMENT IN BRAZIL, SKILLINGS' MINING REVIEW,
JANUARY 7, 1978, PP 20-28.
E/MJ, SAMARCO'S 246-MI SLURRY PIPELINE IS ON LINE, SUCCESS-
FUL, AND DELIVERING ABRASIVE HEMATITE, AUGUST, 1978,
PP 74-79.
MINING ENGINEERING, SAMARCO'S 396 KM PIPELINE A MAJOR STEP
IN IRON ORE TRANSPORTATION, FEBRUARY, 1981, PP 178 - 182.
SAMARCO MINERACAO S.A., SAMARCO PROJECT, COMPANY BROCHURE.
MSB, SAMARCO MINERACAO, JULY 30, 1973.
EMJ, BRAZIL, DECEMBER, 1978.
SKILLINGS' MINING REVIEW, SAMARCO IRON ORE SHIPMENTS AT
4,164,794 D.M.T. IN 1980, MARCH 21, 1980.
4,374,000 M.T. IN 1979, APRIL 26, 1980.
MSB, ALLEGRIA, BRAZIL, APRIL 8, 1974.
| Subject category | Comment text |
|---|---|
| Deposit | IN ADDITION TO A $4.35 MILLING COST, THERE IS A $11.28 SMELTING COST FOR PELLETIZATION OF PRODUCT A, FE PELLETS. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 02-JUN-1995 | Bolis | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.