| Deposit ID | 10254962 |
|---|---|
| MAS/MILS ID | 4690410001 |
| Record type | Site |
| Current site name | Cerro Colorado |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -6.65651, 37.68263 (WGS84) |
| Elevation | 400 |
| Location accuracy | 1000(meters) |
Political divisions (FIPS codes)
Spain(country)
Europe(continent)
Land(continent)
| Country |
|---|
| Spain |
| Commodity | Importance |
|---|---|
| Copper | Primary |
| Gold | Secondary |
| Silver | Secondary |
| Materials | Type of material |
|---|---|
| Chalcocite | Unknown |
| Chalcopyrite | Unknown |
| Chlorite | Unknown |
| Digenite | Unknown |
| Galena | Unknown |
| Gold | Unknown |
| Kaolinite | Unknown |
| Limonite | Unknown |
| Quartz | Unknown |
| Silver | Unknown |
| Sphalerite | Unknown |
| Ore Body (1) | -6.65651, 37.68263 |
|---|
| Strike | N90E | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dip | 90 | ||||||||||||||||||||||
| Thickness | 300M | ||||||||||||||||||||||
| Length | 1000M | ||||||||||||||||||||||
| Width | 600M | ||||||||||||||||||||||
| Area | 111HA | ||||||||||||||||||||||
| Depth to top | 30M | ||||||||||||||||||||||
| |||||||||||||||||||||||
| Operation type | Surface-Underground |
|---|---|
| Development status | Past Producer |
| Commodity type | Metallic |
| Significant | No |
| Discovery year | 1556 |
| Year of first production | 1967 |
| Milling method | Flotation |
| Type | Operator |
|---|---|
| Owner | Rio Tinto Minera S. A. |
| Home office | Spain |
| Year | 1990 |
| Type | Owner |
|---|---|
| Owner | Explosivos Rio Tinto S. A. |
| Interest | 51 |
| Home office | Spain |
| Year | 1990 |
| Type | Owner |
|---|---|
| Owner | Rtz Corp. |
| Interest | 49 |
| Home office | United Kingdom |
| Year | 1990 |
| Year | 1965 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Producing 42 Grams Ag/Metric Ton 2000000 Metric Tons Ore/Year | ||||||||||||||
| |||||||||||||||
| Year | 1965 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Producing 2.4 Grams Au/Metric Ton 2000000 Metric Tons Ore/Year | ||||||||||||||
| |||||||||||||||
| Year | 1965 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | Producing 0.79% Cu 2000000 Metric Tons Ore/Year | ||||||||||||||
| |||||||||||||||
| Year | 1970 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1971 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1972 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1973 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1974 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1975 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1976 |
|---|---|
| Description | Ore Mined/Year 3300000 Metric Tons |
| Year | 1977 |
|---|---|
| Description | Ore Mined/Year 2732000 Metric Tons |
| Year | 1978 |
|---|---|
| Description | Ore Mined/Year 2732000 Metric Tons |
| Year | 1979 |
|---|---|
| Description | Ore Mined/Year 2732000 Metric Tons |
| Year | 1980 |
|---|---|
| Description | Ore Mined/Year 2732000 Metric Tons |
| Year | 1981 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 2940 Mt Cathode Copper From Leach 126276 Mt Conc At 21% Copper | ||||||||||||||
| |||||||||||||||
| Year | 1982 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 3894 Mt Cathode Copper From Leach 150982 Mt Conc At 21% Copper | ||||||||||||||
| |||||||||||||||
| Year | 1983 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 3897 Mt Cathode Copper From Leach 151955 Mt Conc At 21% Copper | ||||||||||||||
| |||||||||||||||
| Year | 1984 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 3194 Mt Cathode Copper From Leach 184915 Mt Conc At 21% Copper | ||||||||||||||
| |||||||||||||||
| Year | 1985 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 3010 Mt Cathode Copper From Leach 158656 Mt Conc At 21% Copper | ||||||||||||||
| |||||||||||||||
| Year | 1986 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | 2064 Mt Cathode Copper From Leach 117126 Mt Conc At 21% Copper | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1971 | ||||||||||||||
| Measured | 40000000mt ore | ||||||||||||||
| Demonstrated | 40000000mt ore | ||||||||||||||
| Total resources | 40000000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1988 | ||||||||||||||
| Indicated | 35000000mt ore | ||||||||||||||
| Demonstrated | 35000000mt ore | ||||||||||||||
| Total resources | 35000000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1988 | ||||||||||||||
| Measured | 185000000mt ore | ||||||||||||||
| Demonstrated | 185000000mt ore | ||||||||||||||
| Total resources | 185000000mt ore | ||||||||||||||
| |||||||||||||||
| Type | In-situ | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1986 | ||||||||||||||||||||||||||||
| Indicated | 122766000mt ore | ||||||||||||||||||||||||||||
| Demonstrated | 122766000mt ore | ||||||||||||||||||||||||||||
| Total resources | 122766000mt ore | ||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Type | In-situ | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1988 | ||||||||||||||
| Measured | 185000000mt ore | ||||||||||||||
| Demonstrated | 185000000mt ore | ||||||||||||||
| Total resources | 185000000mt ore | ||||||||||||||
| |||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 111HA | ||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 111HA | ||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||
| Type of workings | Surface | ||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | 111HA | ||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 4690410001 |
MINING MAGAZINE. VOL. 125, NO. 6, DEC. 1971, PP. 528-539.
WORLD MINING. CERRO COLORADO: BIG NEW COPPER PIT AT FAMED
RIO TINTO SPAIN. SEPT. 1971, PP. 42-46.
SKILLING'S MINING REVIEW, NOV. 18, 1989, P. 4-7.
ENGINEERING AND MINING JOURNAL, 1989-90, E&MJ.
INTERNATIONAL DIRECTORY OF MINING, 1989, P. 291.
1976-77 WORLD MINES REGISTER
WORLD MINING, SEPT 1971-CERRO COLORADO: BIG NEW COPPER PIT A
RIO TINTO SPAIN P 42
WORLD MINING. RIO TINTO - TREASURE OF THE AGES: MINING FROM
1100 B.C. TO PRESENT. SEPT. 1978, PP. 137-139.
MINING MAGAZINE. APRIL 1979, P. 295.
JONES, M.J. GEOLOGICAL MINING AND METALLURGICAL SAMPLING.
INSTITUTE OF MINING AND METALLURGY, 1974, PP. 156-173.
MCQUISTAN, F.W., JR., AND R.S. SHOEMAKER. GOLD AND SILVER
CYANIDATION PLANT PRACTICE MONOGRAPH. AIME, 1975,
PP. 155-158.
WESTERN MINER, RIO TINTO MINERA SA CERRO COLORADO PROJECT,
MAR. 1983, P. 12.
SKILLING'S MINING REVIEW, MAR. 25, 1989, P. 6.
MORRAL, F.R., A MINI-HISTORY OF THE RIO TINTO (SPAIN)
REGION, CIM BULL., MAR. 1990, P. 150-154.
| Subject category | Comment text |
|---|---|
| Deposit | 765 EMPLOYEES, CU ORE 9,000TPD, AU ORE, AG ORE 4,500TPD, CU 50TPD, AU 290 OZ/DAY, AG 2,250 OZ/DAY, OPEN PIT MINES - 25,000TPD. WASTE STRIPPED, 15,000TPD. ORE MINED, OPEN PIT EQUIPMENT- BLAST HOLE DRILLS, FRONT END LOADERS, CONTINUOUS EXCAVATORS, SHOVELS, ROAD GRADERS, BULLDOZERS, TRUCKS, FLOTATION- 9,000TPD, CYANIDATION- 4,500TPD. CERRO COLORADO IS CAPPED BY A LEACHED GOSSAN 70 TO 115 FEET THICK. AU VERY FINELY DISSEMINATED, AG CONCENTRATED IN THIN BLANKET NEAR THE BASE OF THE GOSSAN. PB OCCURS AS ANGLESITE, LEACHED ZONE 65FT THICK, UNDERLAIN BY 65FT OF SECONDARILY ENRICHED SULFIDE ZONE. SECONDARY SULFIDES ARE CHALCOCITE AND DIGENITE. HIGH GRADE POCKETS WILL ASSAY UP TO 15.0%. ORE IS SELECTIVELY MINED AND BLENDED WITH LOWER GRADE. THE PRIMARY ORE IS FOUND IN A RELATIVELY UNALTERED SERIES OF WELDED TUFFS. CHALCOPYRITE (CUFES2) IS THE CU MINERAL. THE PIT WAS DESIGNED TO MINE 40,000,000 TONS OF CU WITH A CUTOFF GRADE OF 0.4%. AVERAGE GRADE IS 0.77% WITH A DILUTION FACTOR OF 19%. PLAN TO MINE 25MM TONS OF MARGINAL GRADE ORE OF 0.28% CU WHICH IS BEING PLACED ON LEACHING DUMPS AND 87MM TONS OF WASTE IS UNDERWAY. PIT PLANNING AND DESIGN- THE PIT WILL BE 4,800FT LONG, 2,500FT WIDE AND 700FT DEEP AFTER MINING 16MM TONS, BENCHES- 10M, FINAL WALL SLOPE 1:1. A WORKING SLOPE OF 3:1. TAILINGS PONDS ARE LOCATED IN THE REJONDILLO RIVER NORTH AND NORTHWEST OF THE PIT- 2 DAMS. HEAD ASSAYS AU- 1.225 OZ/TON. AU- 0.070 OZ/TON; PRODUCTS - DORE BULLION- 78% AG, ANNUAL PRODUCTION- 27,000 KG AG AND 3,000 KG AU. PIT DESIGN- FACE ANGLE- 70, RAMP WIDTH- 20M, |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 05-JAN-1995 | Porter, Kenneth E. | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.