Yararibo

Past Producer in Guyana with commodity Aluminum
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Ore body information
  8. Economic information about the deposit and operations
  9. Mineral rights holdings
  10. Ownership information
  11. Production statistics
  12. Workings at the site
  13. Links to other databases
  14. Bibliographic references
  15. General comments
  16. Reporter information

Geologic information

Identification information

Deposit ID 10255328
MAS/MILS ID 3120000003
Record type Site
Current site name Yararibo

Geographic coordinates

Point of reference Ore Body
Geographic coordinates: -58.2701, 5.90957 (WGS84)

Site location context

Political divisions (FIPS codes)

Guyana(country)

South America(continent)

Land(continent)

Geographic areas

Country
Guyana

Commodities

Commodity Importance
Aluminum Critical Primary

Nearby scientific data

Ore Body (1) -58.2701, 5.90957

Economic information

Ore body information

  • Area 1000HA
    Field Value
    Total Surface Area (HA) 1000
    Date of Last Modification 910418

Economic information about the deposit and operations

Operation type Surface
Development status Past Producer
Commodity type Metallic
Significant No
Year of first production 1965

Mineral rights holdings

Type of mineral rights Other

Ownership information

  • Type Owner
    Owner Guyana Government
    Interest 100
    Year 1981
  • Type Operator
    Owner Guyana Mining Enterprises, Ltd. (Guymine)
    Year 1981

Production statistics

  • Year 1965
    Description 300000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 300000mt
  • Year 1966
    Description 300000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 300000mt
  • Year 1967
    Description 300000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 300000mt
  • Year 1968
    Description 300000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 300000mt
  • Year 1969
    Description 300000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 300000mt
  • Year 1970
    Description 347000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 347000mt
  • Year 1971
    Description 334000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 334000mt
  • Year 1972
    Description 290000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 290000mt
  • Year 1973
    Description 287000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 287000mt
  • Year 1974
    Description 293000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 293000mt
  • Year 1975
    Description 218000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 218000mt
  • Year 1976
    Description 181000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 181000mt
  • Year 1977
    Description 192000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 192000mt
  • Year 1978
    Description 196000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 196000mt
  • Year 1979
    Description 193000 Mt Ore/Yr
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Ore Aluminum Aluminum 193000mt

Workings at the site

  • Type of workings Surface
    Area 1000HA
    Field Value
    MAS Development Schedule # 1
    Mining Record # 1
    Status of Mining Method ESTIMATE
    Mining Method OPEN PIT
    Capacity 650
    Capacity Units MT ORE/DAY
    Unit Production Cost 5.2
    Units of Production $/MT ORE
    Operating Days per Year 300
    Year of Information 1981
  • Type of workings Surface
    Area 1000HA
    Field Value
    MAS Development Schedule # 1
    Mining Record # 2
    Status of Mining Method PROPOSED
    Mining Method OPEN PIT
    Capacity 1000
    Capacity Units MT ORE/DAY
    Unit Production Cost 16.18
    Units of Production $/MT ORE
    Operating Days per Year 300
    Year of Information 1981

Comments on other economic factors

  • TRANSPORTATION COSTS: MILL TO REFINERY $10.56/MT. MILL OUTPUT REFIN TO SMELTER $2.85/MT SMELT OUTPUT
  • TRAINS FROM SEVERAL MINES CONVERGE AT AN ORE GRADING STOCKYARD. BAUXITE IS SIDE DUMPED INTO HAMMERMILLS AND REDUCED TO 85% MINUS 90 MM. ORE IS WASHED. IMPURITIES FROM CALCIN AND METAL GRADE FEEDS PASS THROUGH SCREEN AND ARE SENT TO FINES RECOVERY PLANT, TREATED IN HYDROCYCLONES AND MECHAN- ICAL CLASSIFIERS TO SEPARATE ALUMINA FROM SILICA IMPURITIES. ALUMINA THEN TREATED IN FLOTATION CELLS. TO PRODUCE CALCINED REFRACTORY GRADE BAUXITE, OVERSIZE FROM THE WASHING SCREEN IS CRUSHED TO 40 MM, WASHED AGAIN AND SENT TO ROTARY KILNS TO REMOVE WATER. WHEN WASHING METAL GRADE ORE, OVERSIZE FROM SCREENS IS SENT 3.2 KM TO DRYING PLANT(ROTARY KILNS). AFTER DRYING OR CALCINING THE BAUXITE CAN BE EXPORTED. ALL MATERIAL FROM FINES PLANT AND SOME OF METAL GRADE BAUXITE IS SENT TO ALUMINA REFINERY. FEED FOR LINDEN REFINERY IS 75% ALUMINA CONCENTRATE FROM FINES PLANT, 15% IRON LATERITE, AND REMAINDER IS METAL GRADE BAUXITE DRIED AT BAUXITE PLANT. A SMELTER FOR GUYANA IS IN PLANNING STAGES. DEVELOPMENT DEPENDS UPON CONSTRUCTION OF HYDROELECTRIC PLANT.

Reference information

Bibliographic references

  • Deposit

    CORRESPONDENCE: GUYANA BAUXITE CO.,LTD., NOV.11,1975 (SEE GU

  • Deposit

    FILE).

  • Deposit

    GUYANA BAUXITE CO. MAP.

  • Deposit

    GEOLOGICAL SURVEY OF GUYANA MAP: BAUXITE DEPOSITS AT LINDEN AND I

  • Deposit

    GEOLOGICAL SURVEY OF BRITISH GUIANA MAP:PART OF N.E. BRITISH GUIA

  • Deposit

    BLEACKLEY,D., 1964, BAUXITES AND LATERITES OF BR. GUIANA: BU

  • Deposit

    .SURV.BR.GUIANA,B.34, 156PP.

General comments

Subject category Comment text
Deposit THIS IS A PRODUCING DEPOSIT (GUYANA BAUXITE CO. LETTER). RES INFORMATION IS PROBABLY CONTAINED IN REPORT: "AN APPRAISAL O BAUXITE RESERVES CONTAINED IN MINING LEASES AND E.P.S OF THE ARA BAUXITE CO." BY HAMILTON: GUYANA GEOL. SURVEY, 1971. REP QUESTED, BUT NEVER RECEIVED. LOCATION IS APPROXIMATE. ACCURACY IS WITHIN PLUS OR MINUS ON MINUTE. MAPS USED ARE INACCURATE (SEE FILE REPORT). 300 OPERATING DAYS/YEAR IS ESTIMATED. PRODUCTS OF YARARIBO MINE: BAUXITE (DIRECT SHIPPING) 62% 186,000 BAUXITE (CALCINED) 24% 72,000 BAUXITE (METALLURGICAL) 14% 42,000 300,000 TONS NO INFORMATION AVAILABLE FOR GEOMETRY, LITHOLOGY OR MINERALS DATA SETS. THE MODIFIER OF COMMODITY RECORD 2 IS LISTED AS "OTHER". READ THIS AS METALLURGICAL GRADE ALUMINA.

Reporter information

Type Date Name Affiliation Comment
Reporter 26-SEP-1996 Eastern Field Operations Center (EFOC) U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.