Sumbi

Prospect in Congo (Kinshasa) with commodities Aluminum, Iron, Silica
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Economic information about the deposit and operations
  8. Ownership information
  9. Links to other databases
  10. Bibliographic references
  11. Reporter information

Geologic information

Identification information

Deposit ID 10280827
MAS/MILS ID 7660150001
Record type Site
Current site name Sumbi

Geographic coordinates

Geographic coordinates: 13.38472, -5.03132 (WGS84)
Elevation 750

Site location context

Political divisions (FIPS codes)

Congo (Kinshasa)(country)

Geographic areas

Country
Congo (Kinshasa)

Commodities

Commodity Importance
Aluminum Critical Primary
Iron Tertiary
Silica Tertiary

Nearby scientific data

(1) 13.38472, -5.03132

Economic information

Economic information about the deposit and operations

Operation type Surface
Development status Prospect
Commodity type Metallic
Significant No

Ownership information

  • Type Owner
    Owner Zaire Government
    Interest 100
    Home office Zaire
    Year 1979

Comments on the production information

  • IN 1974 REYNOLDS METALS PROPOSED MINE OF 1,200,000 MTPY, REFINERY OF 360,000 MTPY AL2O3 AND SMELTER WITH CAPACITY OF 140,000 MTPY AL.1974 COST EST.- $1,500,000,000. IN 1976 ALUSUISSE PROPOSED COMPLEX INVOLVING MINE, REFINERY WITH CAPACITY OF 1,200,000 MTPY AND SMELTER WITH CAPACITY OF 600,000 MTPY. THERE IS POSSIBILITY THAT SOME OF BAUXITE FEED FOR REFINERY/ SMELTER COULD COME FROM OVERSEAS. IN 1979: ZAIRE OFFERED POWER RATE OF 4 MILLS($.004)/KWH, ALUSUISSE WANTS RATE OF 1.5 MILLS($.0015)/KWH. POWER BASED UPON THE INGA HYDROELECTRIC PROJECT ON CONGO RIVER.PLANNED CAPACITY OF 58,000 MW(AT 2,400 MW IN 1979), EST. PRODUCTION FROM 1974-ROV. WAS STOPPED MID-1978 AFTER CONSTRUCTION OF 1,800 KM.-LINE AT 36,000 V. TIE IN FROM INGA TO SUMBI IS 140 KM LONG(ALREADY BUILT). STEP DOWN TO 29000 V. USA CONTR.CO. FOR PLANT AND LINE. AVG. OVERBURDEN 5 M(LATERITIC SOIL),BAUXITE BEDS 15 M AV. THICK. 6 OREBODIES SPREAD OVER A 100 KM LENGTH AND 2 TO 8 KM WIDTH. 4 OREBODIES ARE HIGH GRADE(NAMES: SUMBI, TSALA, KITSAKU, & ZIMBA). 2 OTHERS ARE NAMED SANZALA AND SOTIKA. LOCATED E OF TSHELA;CO-ORDINATES GIVEN ARE FOR TOWN OF KITSAKU 50 KM E OF TSHELA. REFINERY-SMELTER COMPLEX TO BE BUILT AT SUMBI LOCATED 140 KM FROM INGA HYDROPOWER PLANT AND LESS THAN 200 KM FROM BANANA SHIPPING PORT. JOINT VENTURE PROBABILITY: ZAIRE GOV=49%, ALUSUISSE = 51%.

Comments on the reserve resource information

  • 1,000,000,000 MT EST. INCLUDES THE 132,000,000 MT OF HIGH GRADE BAUXITE (MAT.1,COL.4) WHICH IS 40-50% AL2O3 & LESS THAN 5% SIO2.

Reference information

Bibliographic references

  • Deposit

    DMA SERIES 1501. SHEET SB-33. SCALE 1:1,000,000.

  • Deposit

    AGUIRRE,C.A. TRIP REPORT NOTES,JAN.1979. FROM INTERVIEW WITH

  • Deposit

    MR. KHONDE MUNDEMBA,SERVICE PRESIDENTIEL D'ETUDES,

  • Deposit

    KINSHASHA.

Reporter information

Type Date Name Affiliation Comment
Reporter 21-OCT-1983 Boyle, Ed U.S. Bureau of Mines