| Deposit ID | 10303402 |
|---|---|
| MAS/MILS ID | 1220150008 |
| Record type | Site |
| Current site name | Chisel Lake Mine |
| Point of reference | Ore Body |
|---|---|
| Geographic coordinates: | -100.11556, 54.83334 (WGS84) |
| Elevation | 250 |
| Location accuracy | 500(meters) |
Political divisions (FIPS codes)
Alaska(state)
United States(country)
North America(continent)
Land(continent)
| Country | State |
|---|---|
| Canada | Manitoba |
| Commodity | Importance |
|---|---|
| Copper | Primary |
| Gold | Secondary |
| Lead | Primary |
| Silver | Secondary |
| Zinc Critical | Primary |
| Materials | Type of material |
|---|---|
| Calcite | Unknown |
| Chalcopyrite | Unknown |
| Galena | Unknown |
| Gold | Unknown |
| Pyrite | Unknown |
| Pyrrhotite | Unknown |
| Sphalerite | Unknown |
| Ore Body (1) | -100.11556, 54.83334 |
|---|
| Thickness | 20M | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length | 200M | ||||||||||||||||||||||||
| |||||||||||||||||||||||||
| Operation type | Underground |
|---|---|
| Development status | Producer |
| Commodity type | Metallic |
| Significant | Yes |
| Discovery year | 1956 |
| Mining method | Filled Stopes - Inclined Cut and Fill |
| Year of first production | 1960 |
| Milling method | Flotation |
| District name | Chisel Lake |
|---|
| Type of mineral rights | Unknown |
|---|
| Ownership category | Unknown |
|---|
| Type | Owner-Operator |
|---|---|
| Owner | Hudson Bay Mining And Smelting Co., Ltd. |
| Interest | 100 |
| Home office | Canada |
| Year | 1975 |
| Type | In-situ | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Estimate year | 1973 | ||||||||||||||||||||||||||||||||||||||||||
| Measured | 2540000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| Demonstrated | 2540000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| Total resources | 2540000mt ore | ||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||
| Type of workings | Underground | ||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overall depth | 441M | ||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||
| Agency | Database name | Acronym | Record ID | Notes |
|---|---|---|---|---|
| U.S. Bureau of Mines | Minerals Availability System | MAS | 1220150008 |
*NICKEL NEWS, JAN. 16, 1993, ISSUE NO. 3/52, P. 5.
CALLANDER, W.K., HUDSON BAY MINING & SMELTING CO., LTD.
FLIN FLON CONCENTRATOR IN MILLING PRACTICE IN CANADA,
1978, P. 170-173.
COOTS, C.J.A., ET AL, GEOLOGY OF THE COPPER-ZINC DEPOSITS
OF STALL LAKE MINES LTD., SNOW LAKE AREA. NORTH MANITOBA,
ECON. GEOL., VOL. 65, 1970, P. 970-984.
COLLISON, M.N., HANDLING SNOW LAKE ORE AT FLIN FLON,
CAN. MIN. AND METALL. BUL., APR. 1966, P. 504-507.
DEPT. OF ENERGY MINES AND RESOURCES, CHISEL LAKE MINE,
MINERAL DEVEL. SECTOR, AUG. 1975, OTTAWA.
FISH, RICHARD, FLIN-FLON-SNOW LAKE OPERATIONS, CAN. MIN.
JOUR., AUG. 1977
HUDSON BAY MINING & SMELTING CO., LTD., ANN. RPTS. 1966-1980
MARTIN, P.L., STRUCTURAL ANALYSIS OF THE CHISEL LAKE OREBODY
CIMM TRANS., VOL. LXIX, 1966, P.208-214.
MINING ENGINEERING, SNOW LAKE MILL PROVIDES NEW COPPER-ZINC
OPPORTUNITIES FOR HUDSON BAY, SEPT. 1979, P.1317-1319.
MINING MAGAZINE, NEW LEAD-ZINC CONCENTRATOR AT SNOW LAKE
CANADA, AUG. 1979, P. 94-95.
NORTHERN MINER, ZINC PLANT EXPANSION TO COST $20 MILLION,
MAR. 5, 1981, P.A10.
PABST, MARILYN, SNOW LAKE CONCENTRATOR WILL SPUR NEW MINE
DEVELOPMENT FOR HBMS, CAN. MIN. JOUR. AUG. 1979.
WATSON, J.F., SNOW LAKE CONCENTRATOR WILL SERVE HUDSON BAY
MINES IN MANITOBA, WESTERN MINER, OCT. 1978, P.12-14,16.
WESTERN MINER, MINING OPERATIONS AT FLIN FLON AND SATEL-
ITES, OCT. 1978, P.12-16.
| Subject category | Comment text |
|---|---|
| Deposit | HUDSON BAY MINING WILL STOP PRODUCTION AT CHISEL LAKE AND STALL LAKE MINES WHEN THE SNOW LAKE MILL GOES INTO CARE AND MAINTANENCE AT THE END OF 1993. THIS COULD MENA THE LOSS OF 600 JOBS. |
| Type | Date | Name | Affiliation | Comment |
|---|---|---|---|---|
| Reporter | 28-SEP-1994 | Eastern Field Operations Center (EFOC) | U.S. Bureau of Mines |
Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.