(Facility) Cerro Matoso Ferronickel Smelter

Plant in Cordoba, Colombia with commodity Nickel
Sections on this page
  1. Identification information
  2. Geographic coordinates
  3. Site location context
  4. Geographic areas
  5. Commodities
  6. Nearby scientific data
  7. Economic information about the deposit and operations
  8. Ownership information
  9. Production statistics
  10. Links to other databases
  11. Bibliographic references
  12. General comments
  13. Reporter information

Geologic information

Identification information

Deposit ID 10304161
MAS/MILS ID 3010211002
Record type Site
Current site name (Facility) Cerro Matoso Ferronickel Smelter
Alternate or previous names Cerro Matoso

Geographic coordinates

Point of reference Town
Geographic coordinates: -75.99971, 8.50116 (WGS84)
Location accuracy 10000(meters)

Site location context

Political divisions (FIPS codes)

Cordoba(province)

Colombia(country)

South America(continent)

Land(continent)

Geographic areas

Country State
Colombia Cordoba

Commodities

Commodity Importance
Nickel Critical Primary

Nearby scientific data

Town (1) -75.99971, 8.50116

Economic information

Economic information about the deposit and operations

Operation type Processing Plant
Development status Plant
Commodity type Metallic
Significant Yes
Year of first production 1982
Plant type Smelter
Milling method Pyrometallurgy Unspecified

Ownership information

  • Type Operator
    Owner Empresa Colombiana De Niquel Ltda. (Econiquel) Col. Gov.
    Home office Colombia
    Year 1991
  • Type Owner
    Owner Billiton Overseas- Subsidiary Of Royal Dutch/Shell Group
    Interest 51
    Year 1991
  • Type Owner
    Owner Instituto De Fomento Industrial Of Columbia
    Interest 49
    Home office Colombia
    Year 1991

Production statistics

  • Year 1990
    Description Ferronickel Production 18418 Tonnes Ni Contained
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Nickel Nickel 18418mt
  • Year 1991
    Description Ferronickel Production - Planned 18144 Tonnes Ni Contained
    Importance Item Commodity Group Amount recovered Grade Recovery percentage
    Major Nickel Nickel 18144mt

Comments on the production information

  • LATERITE ORE CONTAINING 2.9% NI IS SMELTED TO PRODUCE FERRONICKEL CONTAINING 41.5% NI. YIELDS SET B ASSUMES THAT CERRO MATOSO WILL MAINTAIN PRODUCT QUALITY AND RECOVERY FOR THEIR PROPOSED CAPACITY UPGRADE.

Comments on the reserve resource information

  • MUCHO METALLURGICAL PROBLEMS, BUT POTENTIALLY A VERY LARGE PRODUCER. PRODUCES 61,297 MT OF FERRONICKEL GRADING 37 PCT NI , OR 23,000 MT OF NI EQUIVALENTS. IN LATE 1988, MOST PROBLEMS WITH FURNACE LININGS WERE REPORTEDLY SOLVED.

Comments on other economic factors

  • THE FIRST CONCENTRATOR PRESENTS ACTUAL PRODUCTION CAPACITY (@ 22,500 TONNES NI CONTAINED/YEAR), WHILE THE SECOND CONCENTRATOR PRESENTS PROPOSED FUTURE CAPACITY (28,000 TONNES NI CONTAINED/YEAR). THIS PLANT UPGRADE IS SCHEDULED FOR 1993-95.

Reference information

Bibliographic references

  • Development

    CRU - QUARTERLY MARKET SERVICE. NICKEL. APRIL, 1991.

  • Deposit

    NICKDATA, INC. A COMPREHENSIVE NICKEL INDUSTRY COST DATABASE

  • Deposit

    AND COSTING PROGRAM. 1991. ILMAR J. MARTENS,

  • Deposit

    THOMAS F. TORRIES. UNIT 32.

  • Deposit

    INTERNATIONAL MATERITE SYSMPOSIUM, 1979, P. 418.

  • Deposit

    GOMEZ, RICARDO; OGRYZLO, C.T., AND DOR, A.A. 1979. "THE

  • Deposit

    CERRO MATOSO NICKEL PROFECT" INTERNATIONAL LATERITE

  • Deposit

    SYMPOSIUM, PP. 412-458.

General comments

Subject category Comment text
Deposit PLANS FOR UPGRADE TO THE SMELTER BY ADDING A SECOND ELECTRIC FURNACE ARE CURRENTLY BEING CONSIDERED.

Reporter information

Type Date Name Affiliation Comment
Reporter 16-OCT-96 Bleiwas, Donald U.S. Bureau of Mines

Beyond USGS

Supplemental information added by qvyshift.com. Not part of the original USGS MRDS record.